Call +44 800 9755 164

Public tenders for construction in Apeldoorn Netherlands

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction structures and materials; auxiliary products to construction (except electric apparatus)

Belastingdienst, IUC Belastingdienst | Published April 30, 2016  -  Deadline May 9, 2016
cpvs
44000000, 51000000, 50700000

Structures and materials for building; auxiliary products to construction (except electric apparatus)

Construction structures and materials; auxiliary products to construction (except electric apparatus)

Belastingdienst, IUC Belastingdienst | Published April 2, 2016  -  Deadline April 11, 2016
cpvs
44000000, 50700000, 51000000

Structures and materials for building; auxiliary products to construction (except electric apparatus)

Construction structures and materials; auxiliary products to construction (except electric apparatus)

Belastingdienst, IUC Belastingdienst | Published April 16, 2016  -  Deadline May 2, 2016
cpvs
44000000, 50700000, 51000000

Structures and materials for building; auxiliary products to construction (except electric apparatus)

Construction structures and materials; auxiliary products to construction (except electric apparatus)

Belastingdienst, IUC Belastingdienst | Published April 12, 2016  -  Deadline April 18, 2016
cpvs
44000000, 50700000, 51000000

Structures and materials for building; auxiliary products to construction (except electric apparatus)

Historical monument or memorial construction work

Stichting Paleis Het Loo, Nationaal Museum | Published May 20, 2017  -  Deadline June 21, 2017
cpvs
45212314, 71540000, 45111100

The work in connection with the renovation and underground expansion project of Palace Het Loo is divided into 6 separate assignments. The current assignment concerns the demolition and renovation work of the wings and offices, the building and construction of the underground extension, the layout of the basse cour and the coordination of contractors.

The ceiling price is announced upon registration.

Construction work

Waterschap Vallei en Veluwe | Published April 21, 2015  -  Deadline April 23, 2015
cpvs
45000000, 71400000, 71300000

Bouwwerkzaamheden

Construction work

Waterschap Vallei en Veluwe | Published November 5, 2015
Winner
Van Heteren Weg- en Waterbouw BV
cpvs
45000000, 71300000, 71400000

Design, realization and (optionally) term maintenance of a dam in the Kern Spakenburg. The weir consists of a fixed weir and a flexible weir and will have to be fitted in the historic core of Spakenburg (Old Port and New Port). Type of contract: DBM (based UAV-GC 2005). Tender: based on the principles of best value procurement (performance-procurement). The tender is in two phases: - Phase 1: selection based on integration planning and performance support 1 (enrollment April 20); - Phase 2: 2 support performance, risk dossier, dossier chance, interviews (registration and interviews in June). Indicating and explanation: March 18, morning (exact location and time indicated in the tender documents) on location in Spakenburg.

Construction work

Waterschap Vallei en Veluwe | Published March 10, 2015  -  Deadline April 20, 2015
cpvs
45000000, 71400000, 71300000

Design, realization and (optionally) long-term maintenance of a dam in the Core Spakenburg. The weir consists of a fixed weir and a flexible weir and will need to be incorporated in the historical core of Spakenburg (Old Port and New Haven). Contract type: DBM (based UAV-GC 2005). Tender: based on the principles of best value procurement (performance-procurement). The tender is in two phases: - Phase 1: selection based on integration plan and performance support 1 (enrollment April 20); - Phase 2: performance underpinnings 2 risk file, file chance, interviews (registration and interviews in June). Indicating and explanation: March 18, morning (exact location and time indicated in the tender documents) on location in Spakenburg.

Construction work

Waterschap Vallei en Veluwe | Published February 10, 2015
cpvs
45000000, 71400000, 71300000

Waterkering Kern Spakenburg.

Construction structures and materials; auxiliary products to construction (except electric apparatus)

Belastingdienst, IUC Belastingdienst | Published August 9, 2016
Winner
Croon Elektrotechniek BV
cpvs
44000000, 51000000, 50700000

The contract concerns the supply of GTIs products and services to the client (with the client also includes the (government) organizations that are serviced by the principal and optionally wish to use the GTIs products and services as the contractor are offered to the client).

GTIs Products:

The tenderer should deal with the delivery of the products GTIs distinguish the following non-exhaustive list types of products and to provide, namely:

- Racks 19 ";

- Disaster detection;

- Uninterruptible Power Supply (UPS);

- Cold streets (cold corridor);

- Data communications cabling;

- GTIs products for ICT spaces in buildings (SER, EIA, EFR);

- GTIs products for Datacenters (DER, including TER);

- Ducts;

- Additional office and workplace facilities.

services:

The tenderer will be expected to also GTIs related services can make to the client. Among these services are not covered exhaustively history:

- Services in the area of ​​(the) System data services;

- Electrical installation above the floor of the equipment rooms and data centers and at locations which are not serviced by the RVB (excluding sites);

- Surveying WiFi and DECT;

- Consulting services (consultancy) regarding GTIs.

Construction work for water projects

Waterschap Vallei en Veluwe | Published February 19, 2015  -  Deadline March 13, 2015
cpvs
45240000, 45233140, 45112000

Waterbouwwerkzaamheden

Construction work for water projects

Waterschap Vallei en Veluwe | Published May 5, 2015
Winner
Combinatie FPH Ploegmakers — Vissers Ploegmakers — Van de Wetering
cpvs
45240000, 45112000, 45233140

WVV prepared the dike improvement project "Safety southern border lakes and Eem." This project comprises approximately 22 km primary flood defense consists of approximately seven sections. WVV intends 2 sections "Eemdijk South" and "Eemlandse and Slaagse Dijk" to carry out and as one project to spend (hereinafter EES). For both sections this concerns a primary dike along the river Eem between Amersfoort and Eemdijk. The route length is approximately 9.5 km. For the work is arranged an E & C contract. The primary objective of the dike improvement project EES is to bring order to the flood. The new dike should thereto (future-proof) meet the safety standard laid down in the Water Act. The statutory security against flood is defined as a maximum allowable probability of exceeding a certain water level. The statutory protection of the dike Gelderland Valley is 1/1250 per year.

Architectural, construction, engineering and inspection services

Gemeente Apeldoorn | Published April 29, 2017  -  Deadline May 30, 2017
cpvs
71000000

The municipality of Apeldoorn seeks 2 civil engineering workers (junior and senior) for 1 year with an option to extend 3 x 1 year, as of 1.9.2017 for 36 hours a week.

They are responsible for the integral civil engineering design, the preparation phase of works in the public space, and for the procurement, contacts with engineering firms and the first contact point.

They bring together technical issues and project it projectually, and work with project leader and designer public space.

We conclude an agreement with the candidate (s) that meets the quality requirements combined with findings from the interview. With the same aptitude, the candidate wins the lowest hourly rate.

Max 4 quotes, per function max. 2 quotes (CV + motivation letter).

See documents.

Construction fietsdoorstroomas Ugchelseweg, Apeldoorn. - Municipality of Apeldoorn, procurement team

Gemeente Apeldoorn | Published December 12, 2014  -  Deadline January 13, 2015
cpvs
45233222

This concerns a restricted procedure (prequalification) for realizing a fietsdoorstroomas the Ugchelseweg and asphalt maintenance Ugchelseweg, Avenue of Westenenk and Hattemse stream with a grant from the province of Gelderland. Part of the work is part of the RING in Apeldoorn, a major thoroughfare. On the Ugchelseweg in the village Ugchelen and the Hattemseweg companies operate depending on the road connections are in this work. In particular, the 24/7 businesses loopholes on the Avenue of Westenenk. Because the subsidy is a requirement from the province of Gelderland that the parts that are subsidized for August 14, 2015 are ready and have been settled. This concerns the parts Ugchelseweg and the junction with the Avenue of Westenenk including VRI.

Truck including construction, municipality of Apeldoorn 2014 - Apeldoorn, Municipality procurement team

Gemeente Apeldoorn | Published November 4, 2014
Winner
Scania Nederland BV -
cpvs
34130000, 42414000

This involves the purchase of a truck including crane, hooked arm and container which will be used by the unit Management & Maintenance for maintaining the public space in the city of Apeldoorn. Also, maintenance, for a period of up to 8 years included.

Archiving services

Gemeente Apeldoorn | Published February 9, 2017  -  Deadline March 21, 2017
cpvs
79995100

The contracting authority wishes to enter into an agreement to provide a digital construction archive Apeldoorn.

Note: The municipality organizes a survey of the construction archive. This takes place on Tuesday 14.2.2017 and Wednesdays 15.2.2017. Interested parties can register for this chimney until Monday, February 13th 10:00 as the latest e-mail: m.wennink@apeldoorn.nl stating "registration chimney construction archive". Registered candidates received Monday, February 13th as the latest 17.00 an email with the exact time and place where one is expected.

This is the digitization of the archive building (size about 1070 m) of the municipality of Apeldoorn.

Transport equipment and auxiliary products to transportation

Veiligheidsregio Noord- en Oost-Gelderland | Published April 14, 2017  -  Deadline May 23, 2017
cpvs
34000000, 35110000, 34139100, 34144210

The project involves the purchase of so-called large tankers for the Safety Region North-East Gelderland (VNOG).

Design, construction, testing, delivery and eventually maintain up to 15 large tankers with a minimum capacity of 15 000 liters.

Repair and maintenance services of building installations

De Dienst voor het kadaster en de openbare registers (het Kadaster) | Published December 13, 2016
Winner
Engie Services Zuid BV
cpvs
50700000

The contract includes preventive, corrective and planned maintenance including inspections and (good) inspection of:

-gebruikersinstallaties (all properties);

-gebouwgebonden plants (owned properties);

-Construction elements:

* Mounting / dismantling (all properties);

* Structure / wall (owned properties).

The register currently has eight locations (3 of which owned) throughout the Netherlands. A total of approximately 2212 (including flexible workers) people working there.

WFD measures IJssel tranche I Phase C - Water Valley and Veluwe collaboration with Rijkswaterstaat East Netherlands

Waterschap Vallei en Veluwe i.s.m. Rijkswaterstaat Oost-Nederland | Published May 19, 2015  -  Deadline October 23, 2014
Winner
Combinatie Ploegam BV te Vinkel en Van den Biggelaar Grond- en Waterbouw BV te Velddriel (Combinatie PloegamBiggelaar) Vinkelsestraat 70 A, Vinkel, 5383 KM Nederland
cpvs
45112200, 45246200, 45112200, 45246200

Valley Water Board Veluwe and has a cooperation agreement in 2010 with Rijkswaterstaat East Netherlands for the implementation of the water tasks within the European Water Framework Directive (WFD) for the Gelderland IJssel 2016 (tranche I). The WFD aims ecological water to give a good potential. For the IJssel is concretely defined in enhancing the potential habitats for current-loving fish and macroinvertebrates (small invertebrates). The goal achievement is: 1. 8.5 km secondary channel (of which 7.25 km flow) 2. 31.2 km nature-friendly banks (including 10 km in the fairway and 21.2 km in the form of channel banks) After the reconnaissance and planning study phase in the period 2010-2011, tranche I of the project divided into three phases: Phase A: Preparation (Jan 2012- July 2014) MIT clusters I, II and III. Phase B: Realisation three trenches down IJssel MIT Cluster I (march 2014- January 2015) Phase C: Realization nine trenches and eighteen mid-shore locations IJssel, MIT Cluster II and III (Dec 2014- December 2015) The objective of this tender Phase C covers the scope of which is: a. The construction of 11.2 km nature-friendly bank b. The construction of 11.8 km secondary channel c. The construction of 2.0 km strand d. Developing a Final Design to Execution Design (engineering) e. Managing licenses under the Flora and Fauna Act, Nature Conservation and Earth Removal (Project) f Water Act. Applying for permits, except for such licenses under ad. harrow Field Communication

Supervision of building work

Stichting Paleis Het Loo, Nationaal Museum | Published April 19, 2017  -  Deadline May 24, 2017
cpvs
71247000

The work for the realization of the overall project 'Renovation and underground extension "are divided into six different commands. This contract relates to the conduct the management of and supervision of the implementation work of these six contracts. The purpose of this assignment is to guide the client on behalf of and monitor the implementation of the work. The purpose of the contractor to perform work management and supervision consist mainly of:

- conducting management: representing the client in all matters concerning the implementation of the project (if the adoption agreements between the client and contractors 1 to 6 do not oppose);

- supervising the execution of the works in accordance with the contract documents;

- recording the works after completion, keeping the deliverables and the provision and adoption of the proce ...

Duration approximately 4 years.

Bet directievoerder: min. 20 hours per week in preparation, minimum 40 hours per week in the construction phase, avg.. 16 hours per week during the maintenance phase.

Bet supervisor: min. 80 hours per week in the construction phase, gem. 16 hours per week during the maintenance phase.