Public tenders for construction in Junglinster Luxembourg

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Administration communale de Junglinster | Published October 22, 2015
cpvs
45000000

Construction d'un centre sportif et de tennis à Junglinster.

Construction work

Administration communale de Junglinster | Published March 4, 2017  -  Deadline April 18, 2017
cpvs
45000000, 45400000, 45430000, 45313100, 45410000

Lot 8: Lift

One (1) electric lift (without local machines) 1600 kg 1 m / s.

Start of the development plans is planned for June 2017

Start of work on site is planned for November 2017

Construction period is 25 working days

Conditions of participation:

minimum size of the company in the trade: 19 people;

Minimum annual business figures in the trade: € 1.8 million;

The company must provide at least 3 references of similar works executed during the past 5 years.

Lot 9: Fork-tile-coated

Pre-screeds and screeds: +/- 2.300 m2.

Plasters: +/- 1540 m2

floor tiles: +/- 1035 m2

Wall tiles: +/- 1250 m2

Start of the development plans is planned for June 2017

Start of work on site is planned for July 2017

Construction period is 75 working days (in phases)

Conditions of participation:

minimum size of the company in the trade: 38 people;

Minimum annual business figures in the trade: € 2,000,000;

The company must provide at least 3 references of similar works executed during the past 5 years.

Lot 10: Terrazzo

Terrazzo: +/- 1.065 m2.

Start of the development plans is planned for June 2017

Start of work on site is planned for September 2017

Construction period is 25 working days (in phases)

Conditions of participation:

minimum size of the company in the trade: 15 people;

Minimum annual business figures in the trade: € 1,000,000;

The company must provide at least 3 references of similar works executed during the past 5 years.

The works are awarded in separate lots.

Joinery work

Administration communale de Junglinster | Published October 11, 2016  -  Deadline November 24, 2016
cpvs
45421000, 45420000, 45261000

Lot 5 external joinery work

- Exterior doors with aluminum access control system: 13 pieces

- Aluminum windows: +/- 420 m²

- Aluminium Cladding: +/- 400 m²

- 2 canopies galvanized steel clad aluminum siding

- A local bin structure including

Start of construction: March 2017

Construction period: 162 working days in phases.

Structural shell work

Administration communale de Junglinster | Published June 7, 2016
Winner
Perrard SA
cpvs
45223220, 45212225, 45112700

Lot 2: structural work and landscaping work

Construction of reinforced concrete: 2700 m 3

formwork: 9500 m 2

Reinforcement work 330 000 kg

main beams of wood (glulam): 505 m 3

secondary wooden beams and posts (glulam): 205 m 3

wooden beams hewn side: 130 m 3

chipboard panels: 9500 m 2

Roof work: 4750 m 2

Complex green roof: 740 m 2

Facade work (including wood siding): 3000 m 2

Start of construction: June 2016

Construction period: 345 working days in phases.

Heating materials

Administration communale de Junglinster | Published October 8, 2016  -  Deadline November 24, 2016
cpvs
44115220, 44115210

Lot 6: work of heating and ventilation and sanitary.

2 pellet boilers.

Pipes.

Piping.

Radiators.

Heating radiant panels.

ventilation systems.

Domestic hot water production.

all equipment control, electrical panels, wiring.

Sanitary devices.

Lines (wastewater distribution).

Use system gray water.

water treatment system.

Column of fire (dry).

Start of construction: March 2017.

Construction period: 175 working days in phases.

Works for complete or part construction and civil engineering work

Administration communale de Junglinster | Published November 11, 2017  -  Deadline January 11, 2018
cpvs
45200000

Civil works to be carried out in the interest of the "JongMëtt" project in Junglinster / PAP I and II.

Excavating work

Administration communale de Junglinster | Published December 15, 2015  -  Deadline January 21, 2016
cpvs
45112400, 32400000

Lot 1: Earthworks and network installation: cut: 14 395 m3. Supplement rock, Class 6 and 7: 3 650 m3. Embankment DC 0/45: to 755. Trenches for networks: 400 ml. Water pipe laying DN80: 195 ml. Laying pipes DN315 PP: 22 ml. Laying pipes DN100 / 150 350 ml. Start of construction: April 2016. Construction period: 60 days in phases.

Structural shell work

Administration communale de Junglinster | Published March 8, 2016  -  Deadline April 12, 2016
cpvs
45223220, 45212225, 45112700

Construction of reinforced concrete: 2700 m 3 .

formwork: 9500 m 2 .

Reinforcement work 330 000 kg.

main beams of wood (glulam): 505 m 3 .

secondary wooden beams and posts (glulam): 205 m 3 .

wooden beams hewn side: 130 m 3 .

chipboard panels: 9500 m 2 .

Roof work: 4750 m 2 .

Complex green roof: 740 m 2 .

Facade work (including wood siding): 3000 m 2 .

Start of construction: June 2016.

Construction period: 345 working days in phases.

Construction work for buildings relating to education and research

Administration Communale de Junglinster | Published April 22, 2017  -  Deadline June 6, 2017
cpvs
45214000

Closed main works and civil works for external installations for the extension of the relay house / cycle C1 in Gonderange

Built volume ~ 11,350 m 3

Closed construction works

- excavation and underground work ~ 3500 m 3

- reinforced concrete ~ 1030 m 3

- massive wooden walls ~ 750 m 2

- wooden tiles ~ 1400 m 2

- thermal insulation ~ 3100 m 2

- waterproof ~ 1160 m 2

- wood siding ~ 1660 m 2

- wood-aluminum exterior joinery ~ 132 m 2 And aluminum ~ 300 m 2

Building construction work

- earthmoving ~ 1260 m 3

- sanitation and underground networks

- Hardware for cable networks

- roads: pavers and slabs for lawns ~ 670 m 2

- retaining walls of prefabricated concrete and gabions

The duration of the work on the site is 140 working days starting on 21.8.2017.

Installation of doors and windows and related components

Administration Communale de Junglinster | Published May 20, 2017  -  Deadline July 13, 2017
cpvs
45421100

Lot 11: carpentry Interior Doors and frames

32 Wood doors, 13 metal doors, 20 chassis.

Beginning of plan development is scheduled for September 2017.

Start of work on site is scheduled for January 2018.

Total duration of work is 96 working days (in phases).

Architectural, construction, engineering and inspection services

Administration Communale de JUNGLINSTER | Published September 16, 2015  -  Deadline October 26, 2015
cpvs
71000000

Investorenwettbewerb in Bewerbergemeinschaft mit Architekten – Entwicklung Los 1.2 „Jong Mëtt“.
  • 1