Public tenders for construction in Bertrange Luxembourg

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Engineering works and construction works

Division des travaux neufs | Published January 24, 2017  -  Deadline March 8, 2017
cpvs
45220000

Construction of a work of art in mixed structure

Spoil all soil classes: 21 500 m³

Formwork concrete: 5300 m²

All concrete classes: 3110 m³

Steel (plates, beams): 232 tonnes

Start / expected duration:

Autumn 2017 for a duration of 300 days.

Engineering works and construction works

Division des travaux neufs | Published April 16, 2016  -  Deadline June 1, 2016
cpvs
45220000

Construction of a work of art in mixed structure on the N31

acoustic complex on the work of art

Earthworks: 11 100 m³

Coated 0/8, 0/12, 0/16: 2,310 tons

Pious diameter 1.2 m: 850 ml

All concrete classes: 9700 m³

Steel (plates, beams): 1 470 tonnes

Start / predictable Duration:

Autumn 2016 for a period of 440 days.

Works for complete or part construction and civil engineering work

Division des travaux neufs | Published April 26, 2017  -  Deadline June 21, 2017
cpvs
45200000

Geometric adaptations of the roundabout and approaches.

Renewal of pipelines, displacement of networks.

Construction of a retention basin.

Construction of gabion walls.

Earthmoving work: 53,500 m 3 .

Bituminous asphalt: 8,000 tons.

Chest of ground in 0/45: 11 000 m 3 .

Pipes made of reinforced concrete, various diameters: 2,200 m.

Ductile iron drinking water pipes: 700 m.

Supply and installation of gabions: 2,200 m 3 .

Start / Predicted duration:

November 2017 for a period of 280 working days.

Motorway construction works

Division des travaux neufs | Published June 20, 2015  -  Deadline September 9, 2015
cpvs
45233110, 45220000

Lot n2 This involves building a large roundabout 135m in diameter under the highway to allow a better balance of inputs and outputs on the A13 and avoid crossing streams on the N31. In addition, two by-pass is provided for direct access from the highway to the areas of activities which will ease the traffic on the roundabout.

Engineering works and construction works

Division des travaux neufs | Published March 18, 2017  -  Deadline May 3, 2017
cpvs
45220000

Demolition of existing reinforced concrete structures: 1050 m 3

General cuttings before Autofonçage the right of structures 01 and 02 on the highway A4: 12 000 m 3

Cuttings purposes in parallel with the Autofonçage the right of structures 01 and 02 on the highway A4: 3200 m 3

Spoil disposal in excess: 39 000 m 3

serious slag-bearing layers 0/32 GL pre-crack: 3000 to

Implantation of boreholes: 40 units

Draft provisional anchor Ts = 300 kN: 40 units

Draft provisional anchor Ts = 600 kN: 40 units

Formwork walls neat single facings: 3700 m 2

Concrete C35 / 45, Category 3: 3 300 m 3

Concrete C30 / 37 class 4LP: 2100 m 3

High bond passive reinforcements: 750 000 kg

<< >> Surfacing helicopter smooth texture: 3200 m 2

Injectable seals: 320 m

Start / predictable Duration:

in October 2017 for a period of 360 days.

Parking lot construction work

Administration des ponts et chaussées, division des travaux neufs | Published June 7, 2016  -  Deadline July 27, 2016
cpvs
45223300

First extension phase of P7 tarmac on the development of four new parking stands for aircraft, including adaptation of the internal road.

- Site installation

- General earthworks: 44 000 m³

- Special Earthworks: 37 500 m³

- Evacuation spoil excess 95 000 m³

- Additional materials outside 0/150: 54,600 m³

- Rocky material to recover (supply PCH) 123 000 m³

- Backfill excavation for trenches 33 000 m³

- Gutters monoblock: 2120 m

- Reinforced concrete pipes 300 1,200 mm 2 240 m

- Reinforced concrete pipes diameter 1800 mm deep: 460 m

- Water pipes: 860 m

- Coated: to 21,100

- Unreinforced concrete C35 / 45 aircraft parking pavement: 24 500 m³

- Unreinforced concrete C12 / 15 foundations under paving: 13,400 m³

- Reinforcing steel 1 000 t

- Studs for concrete pavement: 73 600 pcs

- Vertical piles diameter from 0.90 to 1.20: 1 115 m

predictable Construction period: 400 working days

predictable Start of construction: end of 2016.

the entry of redevelopment in Differdange / N31-CR174, geometric adaptations of the N31 and rue Emile Mark, renewal of pipelines, transport networks, construction of a traffic intersection traffic lights, construction and deconstruction of temporary diversion.

Division des travaux neufs | Published February 23, 2016  -  Deadline April 13, 2016
cpvs
45233120, 31310000

Earthworks: 35 000 m 3 .

Coated 0/8, 0/12, 0/16, 0/22 serious bitumen: 7000 to.

Concrete pavers for sidewalks: 6300 m 2 .

BA pipes DN800, 600, 500, 400, 300: 1200 m.

water pipes DN200, 150, 100: 1 250 m.

Start / predictable Duration:

September 2016 for a period of 480 days.

Engineering works and construction works

Division des travaux neufs | Published July 14, 2015  -  Deadline September 30, 2015
cpvs
45220000

The book has completely crossed the yard of Bettembourg railways and along the existing bridge to the A1 motorway. The spans are variable with 54.48 m, 51.28 m for the side spans and 80.12 m for the central span.

Road construction works

Division des travaux neufs | Published November 10, 2015  -  Deadline January 13, 2016
cpvs
45233120, 44163130, 44161200, 32400000

Earthworks, sewerage works, road works and road shoulders - site installation - cuttings: 14 000 m3, - excavation trench (variable depth): 42 000 m3, - evacuation cuttings in excess: 10,000 m3 - Shielding: 32 000 m2 - geotextiles: 20,000 m2 - reinforced concrete pipes: 3300 m, - plastic pipes: 7500 m, - Capital crushed materials: 3000 m3 - dairy HF: 16 000 m3 - coated: 8500 to - Granite curbs: 4000 m - granite pavers: 6300 m, - pavement slabs: 2500 m2 - concrete: 3900 m3 - high adhesion passive reinforcements: 96,000 kg - topsoil: 5300 m3 - governed. Lead time: 320 working days. Anticipated commencement: May 2016.

Engineering works and construction works

Division des travaux neufs | Published April 30, 2016  -  Deadline May 11, 2016
cpvs
45220000

works and civil engineering

Engineering works and construction works

Division des travaux neufs | Published September 1, 2015  -  Deadline October 14, 2015
cpvs
45220000, 45232130, 45233227

Earthworks, drainage works and drainage works and road verges, reinforced concrete work - site installation - cuttings: 30 000 m3, - excavation trench (variable depth): 14 000 m3 - cuttings evacuation excess: 59 000 m3 - shielding: 4400 m2, - geotextiles 38 700 m2, - reinforced concrete pipes: 900 m, - plastic pipes: 1 200 m, - filler materials crushed: 15 700 m3, - dairy HF: 13 200 m3, - severe slag: 2200 to - coated: 10,200 to - Granite curbs: 2700 m - granite pavers: 2700 m2 - concrete: 360 m3 - High bond passive reinforcements: 14,300 kg - governed. Lead time: 490 working days. Anticipated start of work: March 2016.

Engineering works and construction works

Division des travaux neufs | Published April 28, 2017  -  Deadline June 28, 2017
cpvs
45220000

Earthmoving, drainage and drainage works, pavement and shoulder work, reinforced concrete works:

Site installation

- Cuttings: 66,000 m 3

- Crushed material: 120,000 m 3

- HF 0/45 Type 1: 19,000 m 3

- Shielding: 88,000 m 2

- Draining beds and trenches: 33,000 m 3

- Bituminous mixtures: 5,200 to

- Splittmastixasphalt: 2,200 to

- Government

2 tunnels for underground parking access:

- Various forms: 10,000 m 2

- Concrete: 10,000 m 3

- Passive reinforcement with high adhesion: 1,020,000 kg

- Welded mesh: 33,000 kg

- Waterproof: 3.400 m 2

Completion of work: 440 working days

Predictable start of works: autumn 2017.

Road construction works

Division des travaux neufs | Published October 13, 2015  -  Deadline November 25, 2015
cpvs
45233120, 45233220, 45233320

- Cuttings: 47 700 m3, - embankment: 11 100 tonnes - trench excavation: 13,000 m3 - crushed 0/45 type 2: 16 500 tonnes - crushed 0/45 type 1: 9500 tonnes, - dairy HF 0/45 type 1: 17 400 tonnes - asphalt: 7000 tons - granite pavers: 1 500 m2, - concrete foundation for borders: 800 m3 - volume, high adhesion passive reinforcements: 48 000 kg - laying and coating power lines bed with a special sand (Territ): 2220 m3 - sleeves in PE DN180 bar: 9400 m, - tubular pipe concrete cover 36 ducts: 160 m, - tubular pipe coating concrete 48 ducts: 1060 m, - start / expected duration: March 2016 for a period of 220 days.

Engineering works and construction works

Division des travaux neufs | Published June 20, 2015  -  Deadline September 2, 2015
cpvs
45220000

Class 2-7 cuttings and sludge: 5000 m3 Embankments in HF or career: 5300 m3 Excavation trench 1 400 m3 spoil Evacuation: 6000 m3 Cuvettes, ditches, collecting 300 to 500, PE 150, drains 1640 ml Regards , Gully: 41 U-tube: 3050 ml layer form HF floor: 3,200 m3 slag Grave: 5200 T Monolayer: 13,000 m2 Coated 0/16 0/12 820 T Borders polymers: 760 ml TV Covering: 5000 Formwork m2: 1950 m2 Concrete: 15,100 m3 Reinforcement: 1390 t bored piles diam 1.20 m 2 100 ml raboutables fittings diam 20 and 25: 4000 U bituminous varnish and waterproofing membrane: 600 m2 Start / foreseeable duration: Start Approximate work (in November 2015 provided for information purposes) contractual period: 300 working days.

Civil engineering support services

Division des travaux neufs | Published July 16, 2016  -  Deadline September 14, 2016
cpvs
71311100

- Project manager, construction manager,

- Quantity surveyor civil engineering,

- Topographer surveyor.

Lead time: 3 years.

predictable Start of construction: January 2017.

Civil engineering support services

Division des travaux neufs | Published September 1, 2015  -  Deadline October 14, 2015
cpvs
71311100

Provision of staff: - project manager, construction manager - civil engineering quantity surveyor - topographer surveyor. Lead time: 600 working days. Anticipated start of work: January 2016.

Ban Gasperich lot 3 Phase 1.

Division des travaux neufs | Published March 15, 2016  -  Deadline May 4, 2016
cpvs
45220000

- Spoil 32,000 m³

- Embankments 70,000 m³

- Foundation and drainage trenches: 21 500 m³

- HF dairy 0/45 type 1: 7300 m³

- Career crushed 16 000 m³

- Coated 0/16 EF3: 1600 to

- Coated 0/12 EF3: 1600 to

- Coated 0/8 EF1 275 to

- Mastic 0/12 B: 1300 to

- Drainage works, various networks

OA17:

- Various formwork: 4000 m²

- Reinforced concrete: 4000 m³

- Passive reinforcements: 600 000 kg

- Welded mesh: 10 000 kg

- Slabs: 3350 m²

- Mastic asphalt: 2650 m²

- Sealing: 3900 m²

- Gaskets: 3690 m

predictable Construction period: 457 working days

predictable Start of construction: November 2016.

Plasterboard works

Adminstration communale de Bertrange | Published April 28, 2015  -  Deadline June 24, 2015
cpvs
45324000, 45261222, 45261220

The interior plastering works include plaster work plaster and cement. - Approximate surface to be coated: 6775 m2 plaster coating (walls / ceilings) and 1870 m2 coated cement (walls). They also feature light plaster and cardboard constructions works, such as dressing, dubbing, false ceilings and various divisions. The work must comply with acoustic requirements, technical and safety as set out in the specifications. - Rough surfaces 1035 m2 plasterboard partitions; 200 m2 dressing ducts, 190 m2 plasterboard lining, 120 m2 buildup sanblocs, 50 m2 false ceilings plaster cardboard, 280 m2 false ceilings.
  • 1