Call +44 800 9755 164

Public tenders for construction in Trieste Italy

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Slip road construction work

Friuli Venezia Giulia Strade SpA | Published February 28, 2015
Winner
RTI Polese SPA — Cave Asfalti di dell'Agnese SRL
cpvs
45233227

Delegation Administrative inter - Decree Service Infrastructure and Communication Vie PMT / 838 / VS.1.0.20 dd 11.12.2008 Decree Supplementary Service Infrastructure, Streets of Communication and Telecommunications PMT / 263 / 28.7.2010 VS.1.0.20 dd Construction of roads furniture and axis Pasiano - Azzano Decimo (redevelopment of the junction between the SP 'Opitergina "and the SP of Pasiano in Visinale locations in the municipality of Pasiano di Pordenone), lot 435.

Ring road construction work

Regione Autonoma Friuli Venezia Giulia — Direzione centrale infrastrutture e territorio — Area interventi a favore del territorio — Servizio lavori pubblici infrastrutture di trasporto e comunicazione | Published April 15, 2017  -  Deadline June 13, 2017
cpvs
45233122

Work to implement the ring road around San Vito al Tagliamento (PN).

The contract consists of construction work on the ring road of San Vito al Tagliamento on the basis of the approved working plan, are covered by the contract all the work, performance, assets and supplies needed to provide full functionality to the works in question.

Construction work

Ministero delle Infrastrutture e dei Trasporti — Provveditorato Interregionale alle OO.PP. per il Veneto, Trentino Alto Adige, Friuli Venezia Giulia — sede coordinata di Trieste | Published November 28, 2015
Winner
ATI: Kostruttiva sco coop a r.l. — capogruppo + Riccesi SpA
cpvs
45000000

Preliminary and final design and execution of construction works of a new Institute penitentiary in the municipality of San Vito al Tagliamento (PN) with 300 seats.

Environmental monitoring for construction

Commissario Delegato per l'emergenza della mobilità riguardante la A4 (tratto Venezia-Trieste) ed il Raccordo Villesse-Gorizia, Ordinanza del Presidente del Consiglio dei Ministri n. 3702 del 5.9.2008 e s.m.i. | Published March 12, 2015
Winner
Leochimica Srl
cpvs
71313450

Open procedure for the award of the scientific and technical activities provided by the environmental monitoring plan for the stages of pre-construction (AO), during construction (CO) and post-works (PO) for the construction works of the road bypass in south of the city of Pordenone in the SS. 13 and the A28 motorway.

Construction and ancillary works for telephone and communication lines

Insiel SpA con socio unico Regione Autonoma Friuli Venezia Giulia | Published August 5, 2015
Winner
Sirti SpA
cpvs
45232300

The contract provides for: (a) Upon acquisition of the final project during the offer, the detailed engineering and safety coordination during the design phase of the infrastructure project in fiber optics that will affect the municipalities; (B) The realization of the infrastructure and free, through fiber optics, the sites identified in the municipalities; (C) The execution of the activities related with respect to maintenance of telecommunications and related equipment and systems for a period of at least 24 months from the provisional acceptance; (D) The preparation of the documents "asbuilt 'related to infrastructure. All work, performance, supplies and related activities referred to in this Article II.1.5) are hereinafter referred to collectively as the "work." The operator must: II.1.5.1) Where necessary, adjust the final project presented during the bidding any orders subsequent to the opinions of the agencies the authorization, without entailing additional compensation for the same contractor. 81/2008. II.1.5.3) Draw up the documents and the documents required by the municipalities and by the relevant authorities needed to allow Insiel SpA to obtain from them all authorizations, licenses and easements necessary for performance of the contract . II.1.5.4) Make the telecommunications infrastructure as specified in the Special Contract and in the construction documents forming the basis of race, and connect the sites identified in the municipalities, as Special Contract, through optical fibers. II.1.5.5) Provide and install equipment and systems necessary to give full functionality to the telecommunications network, as specified in the Special Contract and in the construction documents forming the basis of race. II.1.5.6) Perform the retrofitting of technical rooms located at the sites above or the installation of the shelters that can hold cabinets, devices and systems as specified in the tender documents and in construction documents forming the basis of race. II.1.5.7) Draw up the papers "as-built" according to the format and procedures specified in the Special Contract. The total amount of work is of 859 270 EUR excluding VAT. 143/1949.

Construction and ancillary works for telephone and communication lines

Insiel SpA con socio unico Regione Autonoma Friuli Venezia Giulia | Published August 28, 2015
Winner
Sirti SpA
cpvs
45232300

The contract provides for: (a) Upon acquisition of the final project during the offer, the detailed engineering and safety coordination during the design phase of the infrastructure project in fiber optics that will affect the municipalities; (B) The realization of the infrastructure and free, through fiber optics, the sites identified in the municipalities; (C) The execution of the activities related with respect to maintenance of telecommunications and related equipment and systems for a period of at least 24 months from the provisional acceptance; (D) The preparation of the documents "asbuilt 'related to infrastructure. All work, performance, supplies and related activities referred to in this Article II.1.5) are hereinafter referred to collectively as the "work." The contractor will: II.1.5.1) Where necessary, adjust the final project presented during the bidding any orders and opinions of the agencies the authorization, without entailing additional compensation for the same contractor; 81/2008. II.1.5.3) Draw up the documents and the documents required by the municipalities and by the relevant authorities needed to allow Insiel SpA to obtain from them all authorizations, licenses and easements necessary for performance of the contract . II.1.5.4) Make the telecommunications infrastructure in the manner that will be defined in the Special Contract and in the construction documents forming the basis of race, and connect the sites identified in the municipalities, as Special Chapter d ' contract, through optical fibers. II.1.5.5) Provide and install equipment and systems necessary to give full functionality to the telecommunications network, as will be specified in the Special Contract and in the construction documents forming the basis of race. II.1.5.6) Perform the retrofitting of technical rooms located at the sites above or the installation of the shelters that can hold cabinets, devices and systems in the manner that will be defined in the special d ' procurement and construction documents in places based on race. II.1.5.7) Draw up the papers "as-built" according to the format and procedures that are defined in the Special Contract. 163/2006. The total amount of work is of 971 917 EUR excluding VAT. 143/2013).

NSA 326? Lacotisce - Rabuiese? ? Construction of the road system reorganization near the border crossing of Rabuiese

ANAS SpA COMPARTIMENTO DELLA VIABILITA' PER IL FRIULI VENEZIA GIULIA | Published April 7, 2016  -  Deadline May 10, 2016
cpvs
45233139

NSA 326? Lacotisce - Rabuiese? ? Construction of the road system reorganization near the border crossing of Rabuiese.

Code 04104 operates construction work changing rooms and new field with artificial turf soccer field of Bells - lot

Comune di Trieste | Published July 31, 2015  -  Deadline September 11, 2015
cpvs
45212200

Code 04104 operates construction work changing rooms and new field with artificial turf soccer field of Bells - lot

Construction and ancillary works for telephone and communication lines

Insiel SpA con socio unico Regione Autonoma Friuli Venezia Giulia | Published November 6, 2015
Winner
Italtel SpA capogruppo del Raggruppamento Temporaneo con mandante Telebit Srl
cpvs
45232300

The contract provides for: (a) Upon acquisition of the final project during the offer, the executive planning and security coordination in the planning phase of implementation of the intervention of the Network Nodes to the functional fiber optic network under the Regional Program ERMES that will affect the municipalities; (B) The realization of structures, facilities, and systems within the Network Nodes necessary for the operation and management of the fiber optic network in the Programme regional ERMES; the supply and installation of network equipment required for correct operation of the fiber optic network and services that will be provided through this; the realization of interconnection infrastructure of Network Nodes with infrastructure already made the project ERMES and present in the municipalities through the laying of pipelines and fiber optic cables; (C) The execution of the activities related with respect to maintenance of telecommunications infrastructure, facilities and related equipment and systems for a period of 48 months from the provisional acceptance; (D) The preparation of the documents "as built" relative to what was achieved. All work, performance, supplies and related activities referred to in this Article II.1.5) are hereinafter referred to collectively as the "work." The contractor will: II.1.5.1) Where necessary, adjust the final project presented during the bidding any orders subsequent to the opinions of the agencies the authorization, without entailing additional compensation for the same contractor; 81/2008. II.1.5.3) Draw up the documents and the documents required by the municipalities and by the relevant authorities needed to allow Insiel SpA to obtain from them all authorizations, licenses and easements necessary for performance of the contract . II.1.5.4) Make the work as specified in the Special Contract and in the construction documents forming the basis of race ,. II.1.5.5) Provide and install equipment and systems necessary to give full functionality to the telecommunications network and the Network Nodes, as specified in the Special Contract and in the construction documents forming the basis of race. II.1.5.6) Perform the retrofitting of technical rooms located at the sites above or the installation of the shelters that can hold cabinets, devices and systems as specified in the tender documents and in construction documents forming the basis of race. II.1.5.7) Draw up the papers "as-built" according to the format and procedures specified in the Special Contract. The total amount of work is 2489 € 485.90 excluding VAT. 143/1949 (now DM 143/13).

Construction and ancillary works for telephone and communication lines

Insiel SpA con socio unico Regione Autonoma Friuli Venezia Giulia | Published April 24, 2015
Winner
Raggruppamento Temporaneo: Calzavara SpA, Selex ES SpA e Telecom Italia SpA
cpvs
45232300

The contract relates to the relative performance of the final design, to be produced during the offer, the executive planning and execution of all works, services and supplies necessary for the realization of the technological renovation of the radio system and phone system used at power stations to service operations for the Health Emergency of 118 of the Autonomous Region Friuli Venezia Giulia. Specifically, the contract provides for the construction of the following: - new radio network, - new network interconnection radio multi-channel - new phone systems, - assistance to the commissioning of the new infrastructure, - technical assistance to the testing, functional and administrative new structure, - demolition of existing infrastructure. All work, performance, supplies and related activities are hereinafter referred to jointly "works."

SERVICE PREVENTIVE MAINTENANCE AND / OR FAILURE OF COMPONENT CONSTRUCTION OF BUILDINGS IN PROPERTY 'AND MANAGEMENT AT THE PROVINCE OF TRIESTE

PROVINCIA DI TRIESTE | Published October 26, 2015  -  Deadline October 27, 2015
Winner
Zanini Antonio
cpvs
45453100

SERVICE PREVENTIVE MAINTENANCE AND / OR FAILURE OF COMPONENT CONSTRUCTION OF BUILDINGS IN PROPERTY 'AND MANAGEMENT AT THE PROVINCE OF TRIESTE

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Commissario Delegato per l'emergenza della mobilità riguardante la A4 (tratto Venezia-Trieste) ed il Raccordo Villesse-Gorizia, Ordinanza del Presidente del Consiglio dei Ministri n. 3702 del 5.9.2008 e s.m.i. | Published June 5, 2015
Winner
C.M.B. — Società Cooperativa Muratori e Braccianti di Carpi in A.T.I. con C.C.C. — Consorzio Cooperative Costruzioni Soc. Coop., C.G.S. SpA e Consorzio Stabile Grecale
cpvs
45230000

The project consists of the executive planning and subsequent implementation of the construction of enlargement of the A4 with the third lane in the Gonars (progr. Km 89 + 000) - Villesse (progr. Km 06 + 150).

Concession for the construction and operation of a logistics platform of the timber terminal and the former Italsider - hub port of Trieste (the "Concession").

Autorità Portuale di Trieste | Published October 25, 2014
Winner
I.CO.P. SpA (capogruppo mandataria)Via Silvio Pellico 2Basiliano (UD) 33031 info@icop.it +39 0432838611 www.icop.it+39 0432838681
cpvs
45241000

Award of a Grant of a maximum of thirty (30) years from the completion of the work, once the design, construction, maintenance and management of the logistics platform of the timber terminal and the former Italsider hub port of Trieste, as identified in the CIPE n. 99 of 20 December 2004 and its Annex (the "Resolution 99"), no. 148 of 2 December 2005 (the "Resolution 148"), n. 75 of 29 March 2006 (the "Resolution 75") and CIPE resolution no. 57 of 30 April 2012 and its annex (the "Resolution 57"). In particular, the general design approach using port recovers a total area of ​​250 000 m², of which 140 000 m² derived from areas currently occupied by the sea, by means of adjusting the artificial coastline existing and creation of a platform of marine sediment which includes the construction of new rail and road, and a new berth for Ro-Ro ships. A more detailed description is to be found in the elaborate technical and administrative CIPE resolutions referred to above (the "Documents").

Construction and ancillary works for telephone and communication lines

Insiel SpA con socio unico — Regione Autonoma Friuli Venezia Giulia | Published June 27, 2015  -  Deadline July 24, 2015
cpvs
45232300

The contract provides for: (a) Upon acquisition of the final project in the bidding phase, the detailed engineering and safety coordination in the design phase of the infrastructure project in fiber optics that will affect the territories of the areas of works; (B) The realization of the infrastructure and free, through fiber optics, the sites identified in the territories of the zones of works; (C) The execution of the activities related with respect to maintenance of telecommunications infrastructure for a period of at least 24 months from the provisional acceptance; (D) The preparation of the documents "asbuilt 'related to infrastructure. All work, performance, supplies and related activities referred to in this Article II.1.5) are hereinafter referred to collectively as the "work." The contractor will: II.1.5.1) Where necessary, adjust the final project presented during the bidding any orders and opinions of the agencies the authorization, without entailing additional compensation for the same contractor; 81/2008. II.1.5.3) Draw up the documents and the documents required by municipalities and relevant bodies, necessary to enable Insiel SpA to obtain from them all authorizations, licenses and easements necessary for performance of the contract. II.1.5.4) Make the telecommunications infrastructure and the predispositions of the links in the manner that will be defined in the Special Contract and the project work forming the basis of race. II.1.5.5) Perform the retrofitting of technical rooms located at the sites above or the installation of the shelters that can hold the cupboards, in the manner that will be defined in the tender documents and the construction documents places based on race. II.1.5.6) Draw up the papers "as-built" according to the format and procedures that are defined in the Special Contract. 163/2006. The total amount of work is of 3,924 939.67 EUR, excluding VAT. 4.4.2001.

Hospital facilities construction work

Azienda Ospedaliero Universitaria Ospedali Riuniti di Trieste | Published November 4, 2015
Winner
Costituendo Raggruppamento temporaneo d'imprese CLEA S.C. Impresa Cooperativa di Costruzioni Generali — TECNO.GEO Srl — Bilfinger Sielv Facility Management Srl
cpvs
45215140, 71322000, 71317210

The contract has as its object the final design, including the security coordination in the planning stage, and the execution of the works of redevelopment of the district hospital Cattinara in Trieste, as more fully described and shown with elaborate make up the final project in place the basis of race.

Road tunnel construction work

Friuli Venezia Giulia Strade SpA | Published March 21, 2017
Winner
R.T.I. I.C.I. Impianti Civili Industriali Soc. Coop. a r.l. — Trevi SpA — Pagano & Ascolillo Energy Technology SpA — S.I.O.S.S. Srl
cpvs
45221241

Administrative delegation inter - Decree PMT / 222 / 3.6.2010 VS.1.0.20. SR 464 "Spilimbergo" Redevelopment of the road from SR 177 to SR 464 - South Variant of Vodnjan.

Consultative engineering and construction services

Università degli Studi di Trieste | Published December 23, 2016  -  Deadline February 21, 2017
cpvs
71310000

Entrusted the service of "Works management of the renovation and redevelopment of the F1 and F2 buildings at the former district of San Giovanni OPP in Trieste."

Construction and ancillary works for telephone and communication lines

Insiel SpA con socio unico Regione Autonoma Friuli Venezia Giulia | Published October 20, 2015
Winner
Ceit Impianti Srl
cpvs
45232300

The contract provides for: (a) Upon acquisition of the final project during the offer, the detailed engineering and safety coordination during the design phase of the infrastructure project in fiber optics that will affect the territory of Udine; (B) The realization of the infrastructure and free, through fiber optics, the sites identified in the Municipality of Udine; (C) The execution of the activities related with respect to maintenance of telecommunications and related equipment and systems for a period of 48 months from the provisional acceptance. (D) The preparation of the documents "as-built" infrastructure related. All work, performance, supplies and related activities referred to in this Article II.1.5) are hereinafter referred to collectively as the "work." The contractor will: 163/2006, required by any provisions of these bodies, without entailing additional compensation for the same contractor. 81/2008. II.1.5.3) Draw up the documents and the documents required by the city of Udine and by the relevant authorities needed to allow Insiel SpA to obtain from them all authorizations, licenses and easements necessary for the execution of the object 'contract. II.1.5.4) Make the telecommunications infrastructure, and connect the sites identified in the Municipality of Udine through optical fibers. II.1.5.5) Provide and install equipment and systems necessary to give full functionality to the telecommunications network. II.1.5.6) Perform the retrofitting of technical rooms located at the sites above or the installation of the shelters that can hold cabinets, devices and systems. II.1.5.7) Draw up the papers "as-built". 163/2006. The total amount of work is 1745 € 971.24 excluding VAT. 143/2013: - Technologies of information and communication - functional purpose systems and telecommunications networks - ID.Opere: T.02

Construction and ancillary works for telephone and communication lines

Insiel SpA con socio unico Regione Autonoma Friuli Venezia Giulia | Published April 17, 2015
Winner
Site SpA
cpvs
45232300

The contract provides for: (a) Subject to the acquisition of the final project during the offer, the executive planning and security coordination in the design phase of the infrastructure project in optical fiber that will affect the territories of the City of Pordenone; (B) The realization of the infrastructure and free, through fiber optics, the sites identified in the Municipality of Pordenone; (C) The execution of the activities related with respect to maintenance of telecommunications infrastructure and related equipment and systems, for a period of 48 months from the provisional acceptance; (D) The preparation of the papers 'asbuilt' related to infrastructure. All work, performance, supplies and related activities are hereinafter referred to jointly "works."

Construction and ancillary works for telephone and communication lines

Insiel SpA con socio unico Regione Autonoma Friuli Venezia Giulia | Published April 17, 2015
Winner
MET Srl
cpvs
45232300

The contract provides for: (a) Subject to the acquisition of the final project during the offer, the executive planning and security coordination in the design phase of the infrastructure project in optical fiber that will affect the territories of the Municipality of Trieste; (B) The realization of the infrastructure and free, through fiber optics, the sites identified in the Municipality of Trieste; (C) The execution of the activities related with respect to maintenance of telecommunications infrastructure and related equipment and systems, for a period of 48 months from the provisional acceptance; (D) The preparation of the papers 'asbuilt' related to infrastructure. All work, performance, supplies and related activities are hereinafter referred to jointly "works."