Public tenders for construction in Torre-le-nocelle Italy

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionItalytorre-le-nocelle

Works of construction of infrastructure in the PIP S. Iuliano

comune di torre le nocelle | Published October 2, 2015  -  Deadline June 30, 2016
Winner
Societa Generale di Edilizia srl - [mandatario] 2. De Cristofaro Lino - [mandante]
cpvs
45213200

Works of construction of infrastructure in the PIP S. Iuliano

Award of the final design and the construction of a new bridge in the town of Torre Pellice? Location Bertenga? Lot I. (CUP F41B12000260002) (CIG 65290262B3)

PROVINCIA DI TORINO | Published December 23, 2015  -  Deadline February 15, 2016
cpvs
45221110

Award of the final design and the construction of a new bridge in the town of Torre Pellice? Location Bertenga? Lot I. (CUP F41B12000260002) (CIG 65290262B3)

Engineering works and construction works

Comune di Torre Orsaia | Published June 27, 2015  -  Deadline September 7, 2015
cpvs
45220000

The contract has as its object the final design and execution of emergency measures and priorities for the mitigation of landslide risk in the municipality of Torre Orsaia and consist in the execution of works of regimentation of surface water, drainage of water sub- surface and groundwater, land reclamation of the auction of works of consolidation and torrential areas in landslides by deep foundations.

Engineering works and construction works

Comune di Torre Orsaia | Published May 7, 2016
Winner
Co Gen Costruzioni Generali Srl
cpvs
45220000

executive planning and execution of all the works and supplies necessary to perform and give fully completed the urgent and priority interventions for mitigation of hydrogeological risk: "cleansing hydrogeological areas in landslide, Via del Mare-District San Giovanni.

Restricted procedure pursuant to Legislative Decree no. 163/06. Contract for the final design and execution on the basis of the preliminary draft and the construction work for the extension of? Antemurale Ponente and Resecazione the dock of the Port High Backdrops Civic Porto Torres. CIG 5630886220 - CUP B21G11000040001

Autorità Portuale di Olbia e Golfo Aranci | Published July 28, 2015  -  Deadline January 14, 2018
Winner
SALES S.p.A
cpvs
45240000, 71300000

Restricted procedure pursuant to Legislative Decree no. 163/06. Contract for the final design and execution on the basis of the preliminary draft and the construction work for the extension of? Antemurale Ponente and Resecazione the dock of the Port High Backdrops Civic Porto Torres. CIG 5630886220 - CUP B21G11000040001

Technical services

Comune di Torre Annunziata | Published June 26, 2015  -  Deadline July 23, 2015
cpvs
71356000

Open procedure for the appointment of professional construction management and safety coordination at runtime for the contract of II quarter in Torre Annunziata. "Construction of buildings of public housing."

Dredging and pumping works

Comune di Torre Annunziata | Published October 20, 2015
Winner
Savarese Costruzioni SpA (capogruppo) — CEM. SpA (mandante) — Tralice Costruzioni Srl (mandante)
cpvs
45252124

The contract involves the detailed design and execution of the works for the construction of the link road and dredging of the Port.

Dredging and pumping works

Comune di Torre Annunziata | Published April 21, 2015  -  Deadline June 25, 2015
cpvs
45252124

The contract involves the detailed design and execution of the works for the construction of the link road and dredging of the Port.

Miscellaneous engineering services

GNL Italia SpA | Published June 20, 2015  -  Deadline July 31, 2015
cpvs
71330000

"Services of feasibility studies, engineering, construction supervision, construction management assistance during the race (drafting of technical opinion), hiring of offices in Title IV of the Legislative Decree no. 81/08 to be made to and / or from the LNG plant at Panigaglia Italy, loc. Fezzano of Porto Venere (SP) (CIG: 6276440A21). In general assignments will be related to design work and subsequent maintenance and / or replacement surgeries / improvement of small and medium-size media, for which the details have recourse for the implementation of Title IV of Legislative Decree no. 81/2008 and subsequent amendments ("Shipyards temporary or mobile" - ex. Decree. 494/96), and for which it is necessary to appoint figures Safety coordinator at design and run-time jobs and draw up the Safety Plan and Coordination (PSC). Taking the role of Head Works for the safety authority pursuant to the aforementioned decree, with all its consequences (appoint coordinators etc.), Can be alone on the design phase or the only phase of works, or at both phases. Subject of the contract is also the design, construction supervision and construction management for various works in the mechanical, civil and electro instrumental, even if such work does not fall within the scope of Article. 88 of the consolidation act on safety, but the scope of art. 26 (IRAD). ".

Miscellaneous engineering services

GNL Italia SpA | Published April 19, 2016
cpvs
71330000

Contract for feasibility studies, engineering, work supervision, construction supervision assistance during the tendering stage (drafting of technical advice), hiring of offices referred to in Title IV of the Legislative Decree no. 81/08 to be carried out for and / or at the LNG plant Italy Panigaglia loc. Fezzano Porto Venere (SP)
  • 1