Call +44 800 9755 164

Public tenders for construction in Livorno Italy

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Harbour construction works

Autorità Portuale di Livorno | Published January 22, 2016  -  Deadline March 22, 2016
cpvs
45241000

Construction of ports

Harbour construction works

Autorità Portuale di Livorno | Published December 10, 2016  -  Deadline May 31, 2017
cpvs
45241000

harbor construction works

Harbour construction works

Autorità Portuale di Livorno | Published September 24, 2016  -  Deadline December 15, 2016
cpvs
45241000

harbor construction works

Harbour construction works

Autorità Portuale di Livorno | Published June 11, 2016  -  Deadline September 30, 2016
cpvs
45241000

harbor construction works

Harbour construction works

Autorità Portuale di Livorno | Published March 19, 2016  -  Deadline June 30, 2016
cpvs
45241000

harbor construction works

Harbour construction works

Autorità Portuale di Livorno | Published May 13, 2017  -  Deadline September 29, 2017
cpvs
45241000

Port construction work

Harbour construction works

Autorità Portuale di Livorno | Published January 14, 2016  -  Deadline March 22, 2016
cpvs
45241000

Concession contract concerning: a) the final and detailed design, including surveys and field surveys (geognostic and environmental) necessary coordination in the design phase, the Environmental Impact Study, the Study of incidence and report landscaping of the First Phase of the Platform Europe, which can accommodate ships of project generation, articulated in the works described below: Infrastructure Maritimes - Wharves Terminal (north pier and dock west) tracts connecting to the cliff; Defense works - Dam in North reef tract in cliff; - Dam in North reef tract caisson; - New dam Meloria; - Dam detached North; Dredging, demolition and salpamenti - Dredging to share -16.00 m SLMM channel overlooking the North Quay; - Dredging to share -13.00 m SLMM area facing the quay west; - Hauling tract head dam Marzocco; - Dredging to share -17.00 m SLMM access channel; - Dredging to share -16.00 m SLMM area of ​​expected developments in the entrance into the marina Europe; - Hauling the dam of Meloria; Bridged and Yards - Detected south dock with waste materials of dredging to a height of +2.00 meters above sea level and with tout Venant of quarry to a height of +3.00 meters above sea level, including the implementation of the interventions of consolidation of the portion of the embankment made of materials resulting dredging; - Contribution and arrangement of the volume of waste materials in excess of the amount of dredging required for the construction of the pier in the South filled North; - Opera in cliff bounding the North filled; - Contribution and arrangement of materials is dredging in the North filled; - Consolidation of the two detected waterproof existing tanks; - Implementation of the layer of underpinning the package paving the forecourt of the railway station consists of 1 m of mixed materials of quarry; Pavements, roads and railways - Paving the terminal forecourt; - Scalo railway; - Bundles tracks terminal; - Viaduct of access roads and access to areas of the Platform Europe; - Paving of the square of the railway station; Plants - plants water and fire of the terminal; - Installation of rainwater collection and water treatment first rain of the terminal; - Electrical power of quay cranes and yard equipment and lighting of the terminal; - Installations water and fire of the square of the railway station; - Installation of rainwater collection and water treatment first rain of the square of the railway station; - Electrical and lighting of the square of the railway station; b) the execution of construction work on the terminal and the following works, such as: maritime infrastructure - Wharves Terminal (north pier and dock west) tracts connecting to the cliff; Dredging, demolition and salpamenti - Dredging to share -16.00 m SLMM channel overlooking the North Quay; - Dredging to share -13.00 m SLMM area facing the quay west; - Hauling tract head dam Marzocco; Bridged and Yards - Detected south dock with waste materials of dredging to a height of +2.00 meters above sea level and with tout Venant of quarry to a height of +3.00 meters above sea level, including the implementation of the interventions of consolidation of the portion of the embankment made of materials resulting dredging; - Contribution and arrangement of the volume of waste materials in excess of the amount of dredging required for the construction of the pier in the South filled North; Pavements, roads and railways - Paving the terminal forecourt; - Scalo railway; - Bundles tracks terminal; Plants - plants water and fire of the terminal; - Installation of rainwater collection and water treatment first rain of the terminal; - Electrical power of quay cranes and yard equipment and lighting of the terminal; c) the construction of Terminal with the acquisition of the equipment yard and dock by the dealer, such as, but not limited to: - quay cranes; - Cranes square; - Vehicles ground handling - Operating system information; 84/1994, as well as the ordinary and extraordinary maintenance of the terminal. Given that the public work in question is inserted in the Port Master Plan adopted by the Board of the Port of Livorno with Resolution 34 dated 12.19.2013, and approved by the Council of the Region of Tuscany with Resolution 36 on 25.3 .2015, with reference to the works to design referred to in paragraph a), it is stated that the final and executive relate to all the works of the First Phase platf

OPEN PROCEDURE - IGC [6477330DCC] STIPUòA FRAMEWORK AGREEMENT FOR MAINTENANCE WORK ON NETWORKS AND INFRASTRUCTURE, CONSTRUCTION NEW TAKE UTILITY, NEW WORK AND REPLACEMENTS SERVICES AQUEDUCT PIPELINES AND GAS NETWORKS COMMON AREA LOW VAL DI CECINA.

ASA-AZIENDA SERVIZI AMBIENTALI SPA | Published November 23, 2015  -  Deadline December 21, 2015
cpvs
45231300

OPEN PROCEDURE - IGC [6477330DCC] STIPUòA FRAMEWORK AGREEMENT FOR MAINTENANCE WORK ON NETWORKS AND INFRASTRUCTURE, CONSTRUCTION NEW TAKE UTILITY, NEW WORK AND REPLACEMENTS SERVICES AQUEDUCT PIPELINES AND GAS NETWORKS COMMON AREA LOW VAL DI CECINA.

Research and development services and related consultancy services

Comune di Livorno | Published December 23, 2016  -  Deadline February 22, 2017
cpvs
73000000

The contract involves the award of the construction of a participatory process and subsequent feasibility study for a new technological center of Livorno.

See above.

Children animation services

Comune di Livorno | Published February 18, 2017
Winner
Koalaludo
cpvs
92331210

The contract relates to the construction of entertainment activities to be carried out, outside school hours, at the three identified structures such as offices of the municipal Ludotecario service and through "Ludobus" (vehicle dedicated to itinerant animation).

The structures and the vehicle 'Ludobus "are the City Administration property and will be made available to the successful tenderer by the Contracting Authority.

Children animation services

Comune di Livorno | Published November 12, 2016  -  Deadline December 15, 2016
cpvs
92331210

The contract relates to the construction of entertainment activities to be carried out, outside school hours, at the three identified structures such as offices of the municipal Ludotecario service and through "Ludobus" (vehicle dedicated to itinerant animation).

The structures and the vehicle 'Ludobus "are the City Administration property and will be made available to the successful tenderer by the Contracting Authority.

Professional services for the oil industry

Automobile Club Livorno | Published November 24, 2015
Winner
Unicoop Tirreno Società Cooperativa
cpvs
76200000

Question of project financing for the concession of the integrated service of design, construction and operation of a fuel distribution plant, with characteristics of "white pump" in the portion of property area of ​​the Automobile Club Livorno - Via G. Gelati CONTACTS / Largo Petrolini snc - Livorno. The aforementioned service concession will be awarded in accordance with art. 30, paragraph 3 of the Decree. N. 163/2006, as amended, following the proposal submitted pursuant to art. 278 of Presidential Decree 207/2010, subject to recognized promoter of project finance services, and it will be awarded according to the criterion of the most economically advantageous, in accordance with art. 83 Legislative Decree. N. 163/2006. The procedure is framed in the form of public-private partnership in art. 3, paragraph 15 ter of said legislation.

Professional services for the oil industry

Automobile Club Livorno | Published July 7, 2015  -  Deadline July 27, 2015
cpvs
76200000

Question of project financing for the concession of the integrated service of design, construction and operation of a fuel distribution plant, with characteristics of "white pump" in the portion of property area of ​​the Automobile Club Livorno - Via G. Gelati snc / Largo Petrolini snc - Livorno. The aforementioned service concession will be awarded pursuant to art. 30, paragraph 3 of the Decree. N. 163/2006, as amended, following the proposal submitted pursuant to art. 278 of Presidential Decree 207/2010, subject to recognized promoter of project finance services, and it will be awarded according to the criterion of the most economically advantageous, in accordance with art. 83 Legislative Decree. N. 163/2006. The procedure is framed in the form of public-private partnership in art. 3, paragraph 15-ter of the Legislative Decree.
  • 1