Call +44 800 9755 164

Public tenders for construction in Loch-garman Ireland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Consultative engineering and construction services

Wexford County Council | Published August 2, 2016  -  Deadline September 1, 2016
cpvs

Consultative engineering and construction services

Extension and refurbishment of Colaiste Abbain, Adamstown, Co. Wexford.

Waterford and Wexford Education and Training Board | Published October 1, 2014
Winner
Ganson building and civil engineering LtdUnit 19 Balbriggan Business Park, Balbriggan Dublin
cpvs
45214200

Construction of a new 3 079 m² extension, demolition of 2 existing buildings, removal of all temporary accommodation, refurbishment of 2 remaining single storey buildings on car parking and hard play area and other allocated site work.

Enniscorthy Bridges.

Wexford County Council | Published December 2, 2015
Winner
Roughan O'Donovan
cpvs
71300000, 71311000, 71311210, 71311300, 71312000, 71320000, 71322300

The scope of the work may include some or all of the following as well as other related services: — Providing the services as engineer to the project; — Assimilating all documentation produced to-date in relation to the Enniscorthy Flood Relief Scheme; — Full review of the existing outline bridge designs contained in the preliminary bridge options report including examination of alternate bridge construction options to those contained in the bridge options report; — Procurement and supervision of ground investigation contracts; — Procurement and supervision of topographical survey contracts; — Procurement and supervision of all specialist sub-contractors; — Acting as the Project Supervisor Design Process as required under the Safety, Health and Welfare at Work (Construction) Regulations 2006; — Bridge design; — Preparation of all contract documentation; — Preparation of full tender analysis report and recommendation; — Preparation of full final account reports for all construction and related contracts; — Liaison and communication with the consultant for the main Flood Defence Project; — Liaison and communication with interested parties and those parties impacted or potentially impacted by the project; — And other duties considered appropriate to the brief.

Enniscorthy Flood Defence Scheme.

Wexford County Council | Published December 2, 2015
Winner
Mott MacDonald Ireland Ltd
cpvs
45246000, 45246400, 71311000, 71320000

The service requirements to be provided are those engineering services required by the Contracting Authority in connection with the Enniscorthy Flood Defence Scheme. This project forms the main part of a flood protection scheme for Enniscorthy town. The OPW has prepared a detailed report on a flood relief scheme for Enniscorthy. In addition to this project a separate phase of the Project involves the replacement of the Existing Seamus Rafter N11 Road Bridge, with a new bridge south of this location. The Engineering Consulting services now required include the preparation of a full design and the preparation of contract documents for the proposed flood relief scheme. The service requirements will also include for design of alterations to certain roads and footpaths and other related ancillary works. Assimilating all documentation produced to-date in relation to the Enniscorthy Flood Relief Scheme. (An EIS for the scheme has already been prepared and will be made available upon request) Providing the services as Engineer to the project; Preparation of all contract documentation; Preparation of Full Tender Analysis Report and Recommendation; Procurement and supervision of ground investigation contracts; Procurement and supervision of topographical survey contracts; Procurement and supervision of all contractors / specialist sub-contractors; Contract Management during all Construction on Site: Acting as the Project Supervisor Design Process as required under the Safety, Health and Welfare at Work (Construction) Regulations 2006; Liaison and communication with parties impacted or potentially impacted by the scheme Liaison with Consultants appointed by the Local Authority to the New Bridges Project associated with the Flood Defence Scheme Preparation of Final Account reports for all construction contracts associated with the Scheme and other duties considered appropriate to the brief.
  • 1