Call +44 800 9755 164

Public tenders for construction in Zirc Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Zirc, next to Station Street and the station - construction of bicycle paths between Constitution Street - REGION. authors. mode. I

Zirc Városi Önkormányzat | Published November 6, 2015
Winner
STRABAG Általános Építő Kft.
cpvs
45233162

Construction of bicycle paths between Constitution Street, in the tender documents and detailed as follows - Zirc, next to Station Street and Station: - 3.25 m wide bike path section 6 a total of 1007.64 m in length, 0.5 to 0.5 m curb - 4.72 m Cuha creek opening of R / 28 marked steel pipe bridge, ditch cover 10 to 10 m - 30 m by non-solar powered public lighting - No. 82. The main export route plans for the transfer Cuha Creek Bridge (as VE / ROAD / NS / A376 / 28/2014 license bookings)

Zirci Reguly Antal German Minority Language Teaching Primary School Zirc, Kossuth tér 3-5. (1046/3 ​​/ A / 1 u) are developing building gym - REGION. ELJ. orig.

Zirc Városi Önkormányzat | Published October 16, 2015
Winner
KIVSZER Kft.
cpvs
45453100, 45421130, 45432100

Zirci Reguly Antal German Minority Language Teaching Primary School Zirc, Kossuth tér 3-5. (1046/3 ​​/ A / 1 u) No. gymnasium building development, the tender documents and detailed as follows: The entrance is accessible for people in the gym Di makeover side of 20.44 m2 surface or barrier-free parking in the courtyard and patio design, 67.3 m2 surface, pavement construction and design of roof surface area of ​​19.8 m2, new exterior doors and windows of 15,36 m2 surface and 2 door replacement. Gym flooring and waterproofing sports flooring construction of 665 m2 area, sports court markings with 2 x 3 x 2 meter gate placement, housing protector. The preparation of construction plans, the contractor is responsible, he plans on preparing the building's original architect designer maker Zsolt Kovacs, a fixed fee in the budget.

8420 Zirc, Blind Bottyán u. 1. hrsz .: 1114/1. internal restructuring and renovation works on properties under the existing building - a statement of the contract amendment

"A BAKONYÉRT" Vidékfejlesztési Akciócsoport Egyesület | Published October 16, 2015
Winner
AMBISZA Építőipari Kft.
cpvs
45453100, 45262700

In 8420 Zirc, Blind Bottyán u. 1. hrsz .: 1114/1. Property under internal remodeling and renovation of the following work is not with 237.94 m2 of net floor area of ​​office buildings: • Between ground-floor rooms incorporate moving inside retaining walls opening demolition /-wall • partition walls, construction • sanitary design • heating modernization • domestic hot water solar • roofing replacement • walls and roof slab post • Production of thermal insulation gravel road property

Community property in 6500 to develop, carry out can be found in Issue 5 K. Toth property available building space conversion work on the part of the SGPOP-2.1.1 / J-12-2012-0041 identification number of applications within II. Type II procedure

Zirci Ciszterci Apátság | Published March 27, 2015
Winner
Éprema Kft.
cpvs
45000000

Subject: (. 629 u) a contract to develop community property recovered in 6500, Toth K. space number 5 below building property available to carry out the work of conversion, the SGPOP-2.1.1 / J-12-2012-0041 identification number of applications Within the framework - II. process. Quantity: doorway or gateway on the sidewalk between two járdáknál The courtyard will be constructed as "clinker" shield, the other crushed stone pavement surfaces produced technology. The grades are defined in terms of material qualities are embodied in the budget, departing from the sole fully equivalent products possible. Property standing office building above ground floor units feature separate destination, floor plan design changes, the building - currently not in use - floor premises community property will be developed, which are related exhibition areas for the purpose of development is also a tourist attraction. The closest to the elevator room and one bathroom unit rooms seamlessly use. In this area, there is a higher level of the floor, the current ramp solution is too complicated, long route detour road users to get in front of the room, so flying to the floor next to the staircase by raising the level of access via the corridor. Watch this space for new production of the floor slab level is raised in order to avoid the up and down stairs. It offers its guests Canteens not provide, dine or in the east wing formed kitchen-dining room and the reception near Konya and dining areas have the option to self-organized on request form located nearby (500 m far) restaurants. The dirty-clothes will be immediately dispatched (laundry), so this is not a separate storage space is needed. Small protrusions on the east side of the exhibition space is a female and a male water block was designed for disabled toilets in public spaces as close as possible housed in the north wing can be accessed through the közlekedőjén. Staff were placed next to the sink for disabled toilets. The cleaning equipment and cleaning agents are stored Staff sink placed outside locker room for. Structural features: Ceiling: Mon gyámolított owned subsidiary. World Cup. plate, permanent formwork, structural specifications. Hole-offs: structural specifications. The staircase alms to 25 cm thick. mi brick walls, looking finish, mélyhézagolással sign new 4 corridor room, mon. World Cup. staircase structure is (according to structural design) ceramic coating. Marked the sixth step conversion of the existing staircase, demolition and new geometry to the top visszeépítésével mon (concrete construction) phase. World Cup. structure (according to structural design), ceramic coating. Sign 39 room (L13 A) hollows new steel support structure staircase, paneled staircase juharfal outpatient and front. Stair rails: metal structure constraints hollow columns, flat steel straps, round steel rods welded connections, maple grips 5 cm in diameter. (According consignation) The structural elements of the roof may need significant damage not visible in places affected by the partial replacement of the leaking roof structural elements (~ 15% of timber replacement). The existing roof construction during construction wood preservation expertise we prepared. 38/38 cm across mi brick pillar gyámolítva looking finish, mélyhézagolással. Roofing: notched tiling, slipped, slotted, curved cutting tile, alátétfóliával, ellenlécezéssel pre-folded sheet metal roofs covering, board socket. Plastering, surface preparation: K. Toth Vörösmarty Square and the facade facing the street after the existing facade paint and poorly preserved plaster facade parts manual removal renders application, and surface finishing. The courtyard facades and the east wing of the facades of 8 cm EPS insulation, plaster reinforcing mesh, thin coat of plaster, smoothed surface. 2 cm thickness should be applied to the surface of LB Knauf EP Dryer plaster, skirting the zone itself besimítva, staining surface (in smoothing plaster should not be used); the bottom level of EUR FU clearly superior LB Knauf smoothing mortar and dehumidifiers to dry coated. Retention of the existing facade sections should pay special attention to the incomplete rundown sections along the lines of the intact parts to be pulled back. Front metallic structures: the wheel

Accommodation in the establishment of the Community 6500, can be found performing in space number 5 K. Toth property standing building conversion work (SGPOP-2.1.1 / J-12-2012-0041) - II. process. 3.sz.mód.

Zirci Ciszterci Apátság | Published April 3, 2015
Winner
Éprema Kft.
cpvs
45000000

Subject: (. 629 u) a contract to develop community property recovered in 6500, Toth K. space number 5 below building property available to carry out the work of conversion, the SGPOP-2.1.1 / J-12-2012-0041 identification number of applications Within the framework - II. process. Quantity: doorway or gateway on the sidewalk between two járdáknál The courtyard will be constructed as "clinker" shield, the other crushed stone pavement surfaces produced technology. The grades are defined in terms of material qualities are embodied in the budget, departing from the sole fully equivalent products possible. Property standing office building above ground floor units feature separate destination, floor plan design changes, the building - currently not in use - floor premises community property will be developed, which are related exhibition areas for the purpose of development is also a tourist attraction. The closest to the elevator room and one bathroom unit rooms seamlessly use. In this area, there is a higher level of the floor, the current ramp solution is too complicated, long route detour road users to get in front of the room, so flying to the floor next to the staircase by raising the level of access via the corridor. Watch this space for new production of the floor slab level is raised in order to avoid the up and down stairs. It offers its guests Canteens not provide, dine or in the east wing formed kitchen-dining room and the reception near Konya and dining areas have the option to self-organized on request form located nearby (500 m far) restaurants. The dirty-clothes will be immediately dispatched (laundry), so this is not a separate storage space is needed. Small protrusions on the east side of the exhibition space is a female and a male water block was designed for disabled toilets in public spaces as close as possible housed in the north wing can be accessed through the közlekedőjén. Staff were placed next to the sink for disabled toilets. The cleaning equipment and cleaning agents are stored Staff sink placed outside locker room for. Structural features: Ceiling: Mon gyámolított owned subsidiary. World Cup. plate, permanent formwork, structural specifications. Hole-offs: structural specifications. The staircase alms to 25 cm thick. mi brick walls, looking finish, mélyhézagolással sign new 4 corridor room, mon. World Cup. staircase structure is (according to structural design) ceramic coating. Marked the sixth step conversion of the existing staircase, demolition and new geometry to the top visszeépítésével mon (concrete construction) phase. World Cup. structure (according to structural design), ceramic coating. Sign 39 room (L13 A) hollows new steel support structure staircase, paneled staircase juharfal outpatient and front. Stair rails: metal structure constraints hollow columns, flat steel straps, round steel rods welded connections, maple grips 5 cm in diameter. (According consignation) The structural elements of the roof may need significant damage not visible in places affected by the partial replacement of the leaking roof structural elements (~ 15% of timber replacement). The existing roof construction during construction wood preservation expertise we prepared. 38/38 cm across mi brick pillar gyámolítva looking finish, mélyhézagolással. Roofing: notched tiling, slipped, slotted, curved cutting tile, alátétfóliával, ellenlécezéssel pre-folded sheet metal roofs covering, board socket. Plastering, surface preparation: K. Toth Vörösmarty Square and the facade facing the street after the existing facade paint and poorly preserved plaster facade parts manual removal renders application, and surface finishing. The courtyard facades and the east wing of the facades of 8 cm EPS insulation, plaster reinforcing mesh, thin coat of plaster, smoothed surface. 2 cm thickness should be applied to the surface of LB Knauf EP Dryer plaster, skirting the zone itself besimítva, staining surface (in smoothing plaster should not be used); the bottom level of EUR FU clearly superior LB Knauf smoothing mortar and dehumidifiers to dry coated. Retention of the existing facade sections should pay special attention to the incomplete rundown sections along the lines of the intact parts to be pulled back. Front metallic structures: the wheel

Intervention implementation phase of remediation to be carried out within the framework of the elimination of pollution in municipal solid waste disposal contract modification Zirc-city area as a source of pollution and landfill projects by subject

Zirc Városi Önkormányzat | Published June 10, 2015
Winner
Bácska-STR 2013 Zirc Konzorcium
cpvs
90733900, 90513000, 90740000, 45100000

Intervention implementation phase of remediation to be carried out within the framework of the elimination of pollution in municipal solid waste disposal contract to Zirc area of ​​the city as a source of pollution and deposition by subject, EEOP-2.4.0 / B / 2F / 10-11-2012-0003 subject of project identification number. Intervention implementation phase of remediation ordered Zirc City is located in municipal solid waste landfills in respect of the intervention plan, it has approved the intervention and ordering 33024/12. c. according to a final decision and plan water rights and water rights permit for installations for the water used during the intervention. Area: The area of ​​land parcels (u 124-131): 23,456 m2 covered with garbage area: 22,103 m2. The body relies on waste rock wall. Area of ​​qualification: "The 'highly sensitive area. 300 m away), agricultural land (arable and grassland farming branches) can be found in various locations; 400-450 m from the contracts Cuha Creek Valley. Affected natural resources, protected areas: nature reserves, protected natural values ​​are not directly affected, but recorded the lerakótól lies 400-450 m from the Cuha Creek Valley, located below karstified sequence - karst water level is 225-235 m mélyen-, east-west direction and is located in the Arboretum Zirc area. Contaminated water body concentrations of more than 17,000 m2 ~ B surface projection, the volume of ~ 5,100 m 3. The extent of the body of water above the value "D" (projection surface) of 13,000 m2, the amount of exempt media (contaminated groundwater) 3,900 m3. D pollutants in value: Boron, Ammonium, Nitrate, Nickel, Zinc, Selenium, Chromium, Copper, Cobalt, Arsenic, Sulphate. Part of the activities carried out: site preparation (parade, deforestation, energy, construction, road stabilization delivery route). The design of the mechanical pretreatment smaller diameter separated coarse and fine inert waste temporary storage area. Complex water treatment system is installed (slow filter iron and manganese removal unit, membrane filter). Áthalmozása waste extraction and mechanical pre-treatment. In the treatment of contaminated leachate extraction waste. Mechanical pre-treatment of waste produced. The mechanical pretreatment separated municipal waste (light fraction) and the separate hazardous waste disposal operator, as well as greater use of pre-treated piece of inert waste in a rough spot. The mechanical pretreatment smaller diameter separated coarse and fine inert inert waste transfer interim storage area with engineered landfill adjacent estates designed for water storage below the surface is completed. Cleaning polluted water below the surface until long-term value "D" Complex water treatment water treatment complex designed for cleaning the water to be operated in long-term value D (min. Six-month) is reached. Preparing localization landfill area (below the level of the side wall insulation of the wiring base depot localization landfill south and east side of the upper layer closure order). (Passive engineered surface to be performed: 4200 m2.). Mechanical pre-treatment of inert waste separated lokalizálandó return of temporary storage area and deposition of localization in the central area. 1.2.2. Layer order according to points Óvári construction, grassing. Restoration Area of ​​intervention. Entrepreneur also provides mission on implementation planning, approval and documentation tasks. Detailed specifications, see the documentation. Contractor should contribute to the fulfillment of the Contracting horizontal commitments. § 94 subsection (3). It is shown in basis b)) (if applicable, figures only) Estimated value excluding VAT: Range:.. 952 847 956 Currency: USD

"A contract of Eger, Sándor utca 1. Csiky Hrsz .: 4600 Géza Gárdonyi Cistercian High School during the modernization and transformation of energy," the outcome of the subject contract

Zirci Ciszterci Apátság | Published September 11, 2015
Winner
MEDIBAU Mérnökiroda Építőipari Kivitelező Korlátolt Felelősségű Társaság
cpvs
45000000

Subject: Géza Gárdonyi Cistercian High School Hrsz .: 4600 during the modernization and transformation of energy "Quantity: Description of planned energy upgrade: A and B buildings marked: Attic Ceiling insulation: The insulation in knee walls can lead up síkváltásokra. Doors and windows: the windows 206. The other signal, which may be subsequently changed, a different design on the other window, so the more be replaced with the same type. The armrest also repaired, if necessary are replaced, the same as the original version. The insulation inside to be prepared to this effect masking the inside (where it is located) should be removed, and the damaged soffit insulation and plaster restoration and painting for new masking must be placed. The windows surface treatment also need renovation, glazing identical to the original size gittével beszegezőléccel recorded. Description of the planned renovation of the windows in some detail in the text konszignációjuk. Code C building: the transformation of the structures disclosed in the technical specifications static. Escape routes (walkways, staircases) will heat and füstelvezetésével relating to minimum bontási- and building construction work - the trees in the ground floor stairwell and corridor boundary swinging doors and steel vestibule doors to be demolished - the first floor of a former buffet bulkheads, doors and windows inside Wall hydrant cabinet for demolition and relocation niche körülfalazás (mounted plasterboard partition) existing partitions at all three levels - dismantled equipment - geography-price gain in the second floor corridor at the end of the northern facade perpendicular partition walls demolished. - On the ground floor of the outer gangway stairwell smoke harántfalában phase boundary is formed, to this end, Schüco ADS 65 NI-type structure made of doors will be installed. - The second floor of the same design and planning considerations were introduced smoke-door. Steel armored doors and windows to be built in steel plate smart, pre-sintered plate made of honeycomb core leaves. - Related to the above work and professional finishing works (breakdown cover, substrate repair, paving, painting, electrical and building engineering). The boundary surfaces of renewal energy purposes, there are three main areas: 1. Roof insulation and related renovations, replacement of doors and windows and front second, third boundary walls and additional thermal insulation árkádfödémek. Because of the historic buildings, the sheer energy investment for too high aesthetic demands had to be matched with the planned building structures. The four pieces of masonry chimney remains of one body, and the rest is broken down in the back tray ceiling plane. Extremely low Permeability to water vapor resistant underlay foil to be on top of the rafters (sd value ≤ 0.03) counter battens 5/8 cm cross section pushes down the air layer between which eaves and ridge along the standard kiszellőzőnyílásain must develop intense when ventilation is that the roof to heat up designed to reduce and watertight roofing board socket dries. The waterproofing leathery breathable, vapor-permeable plastic sheet insulation, hot air welding felületfolytonosítva the eaves, oromszegélynél, spine, wall and ablakszegélynél fóliabádoghoz welded. The two types of roofing material reason for the secondary classroom building bevilágítóablakok keeping requirements (for sheet metal roof pitch more demanding level would result window is too small). Unfavorable structural deformation after the end-wall demolition of structural mitigation plan, detailed in Chapter módon-, by analogy with the existing solution on the ground floor, steel columns are placed in the window aperture demolished. On the north side of the window-sill narrowing its report, or the last slot in the western tract will announce full-wall. In the ground floor the natural light of increasing demand, the aesthetic appearance of the facade and sloping street járdasík talent was developed taking into account the traktusonként increasing / decreasing parapetű row of windows. Are removed from the facade windows, which instead are metallic hőhídmegszakításos type structure built in (Schüco AWS 70 HI) for a neck section floor and the eastern ribbon windows structured curtain designs (Schüco FW 50 + SG) former outwards rising window (Schüco AWS 102 SK), which In the case of the frame structure is not visible from the outside. The doors are divided authority, a uniform appearance for the door Schüco ADS 70 type HI. The school fire alarm control panel is not, therefore, a false opening (power failure) caused by nuisance

Cistercian Order of Louis the Great Grammar School and College of Pécs, Széchenyi tér 11.alatti building to establish two laboratories converting existing classrooms and two new classrooms in the enlargement of the building (SROP-3.1.3-11 / 2-2012-0054) II. c. mode

Zirci Ciszterci Apátság | Published March 25, 2015
Winner
Coordinator Zrt. - B.G.W. Kft. közös ajánlattevő
cpvs
45000000, 45453100

Subject: a contract to develop the Cistercian Order of Louis the Great Grammar School and College of Pécs, Széchenyi tér building 11 (u .: 18370) under both laboratory converting existing classrooms and two new classrooms in the enlargement of the building, the SROP-3.1.3-11 use / 2-2012-0054 number of proposals source. Quantity: expansion into classrooms: the electric powered windows derivatized concerned that the fire alarm signal is automatically opened. Materials and structures: - Breakdowns: Small solid brick partition wall in a section of the structure, each layer of the wood floor at the end of the third-floor corridor. Plain and tiling battens. Padlásbevilágító windows and structures (2). Certain structural elements Roofing (inclined struts, pliers couples, chairs, poles, account switching beams, rafters and purlins fire cross section passing through the stages). Plumbing structures (hajlatbádogok, wall flashings, kéményszegélyek). Structural elements attic above the sand and clay slab construction. Small solid brick chimneys and associated structures are sliding (2 chimney above the second floor slab body, one piece body with the support of the chimney above the 3rd floor slab structures). - In fire limit: The boundary wall mounted design, A1 EI 120 fire resistance - CW 75 steel profilváz both sides three-layer coating (2 x RF 12.5 + Rigidur H 12.5), 80 of the roof plane barrier against 90 cm wide spread of fire is A1 EI 120 fire resistance - 2x25 mm glass fiber reinforced fire retardant sheets (Glasroc F) coating steel battens passing through the fire section cross-structural elements in the 90 cm purlins and rafters steel substitution receive (taréjszelemen 2 x L100.50.3 The Roof lathing the eaves planks not replacement of combustible material in the inner cover of the same limits - Partitions. Improved sound proof (48 dB) mounted on walls A2 EI 60 fire resistance - CW 100 steel profilváz on both sides, two-layer coating (Rigips CoR 12.5 + RF 12.5 to 75 mm Isover acoustics mineral wool filling) - Internal coatings. Drywall covers A2 REI 60 fire resistance - CD 27/60 steel profilváz, two-layer coating (Rigips 2 x RF 15-100 + 100mm Isover acoustics) - Knee Walls: Lightweight walls wood frame, 25 cm thick. fiberglass insulation, 2 layers. fireproof drywall interior paneling. - Horizontal Delimitation of space: Light wood ceiling frame, 25 cm thick. fiberglass insulation, 2 layers. fireproof drywall interior paneling. - Roof planes Existing Edgewise beam, 25 cm thick. fiberglass insulation, 2 layers. The fire resistant steel frames oblique sections of the roof structure are made hidden on the outside with thermal insulation to protect. - Columns: IPE0 steel columns A1 200 R 120 fire resistance - 20 to + 25 mm glass fiber reinforced fire retardant sheets (Glasroc F) coating. - Steel frames: IPE0 200 steel frames bearing length walls built reinforced concrete garlands laden, A2, R 60 fire resistance - 20 mm glass fiber reinforced fire retardant sheets (Glasroc F) coating beams placed on the interior (the corridor behind the inner space enclosures provide the longitudinal stiffness elements of the frame are made of the same fire resistance - Slab reinforcement. ribbed reinforced concrete structure with a larger wingspan classroom every second rib classroom tract existing I240 steel beam ceramic between the steel beam filling the floor A1 REI 60 fire resistance is - above 6 or 12 cm reinforced concrete disk, CD below 27/60 profilváz steel, two-layer coating (H Rigidur 12.5 12.5 + RF) - Roofing. The roof must provide fire resistance C Kemikál Tetol FB flame retardants, wood preservatives and anti-fungal rovarkárosítás - Floor Structure. : Dry Floor gypsum fiber sheets, EPS foam layer floating - floor.. according to floor plan - Internal doors: BT1 - BT2: EI 90 A2 corresponding requirements of one or two. double steel fire doors (Besides that, prog) built into the fire compartment boundary walls BT3: felülvilágítós interior doors steel frame, HPL laminate door panels (Novoferm NAT FV) BT4: fixed internal steel window (Novoferm) BT5: térdfalajtó white HDF plate (Fakro) BT6: folding fireproof loft ladder (Fakro LWF) BT7: Wall Protection band - Front doors: HT1: tilting wooden roof windows (Velux GGL) HT2: tilting wooden roof windows (Velux GLL) HT3: rigid tube light tunnel, into the yard a roof skylight surface (Velux TLR) HT4 - HT5: wood windows with insulating glazing - Metal structures: LT1: 25.25.2 steel hollow Roof lathing LT2: stainless steel edge protection (Blan
  • 1