Call +44 800 9755 164

Public tenders for construction in Zalaegerszeg Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Fruit Processing Plant "greenfield" construction

Natur Vital System Nonprofit Kft. | Published April 3, 2015
Winner
Kámea Consult Kft.
cpvs
45200000

Fruit Processing Plant "greenfield" construction.

Fruit Processing Plant "greenfield" construction - Changing corporate contract

Natur Vital System Nonprofit Kft. | Published November 6, 2015
Winner
KÁMEA CONSULT Tanácsadó és Szolgáltató Kft.
cpvs
45200000

Fruit Processing Plant "greenfield" construction: the 8912 Nagypáli, 83/5 real property parcel number of the design documentation and operational documentation in the design plan of the construction of buildings construction work

Information on the stadium construction was Zalaegerszeg. Meanwhile. outcome of proceedings

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published February 10, 2016
Winner
ZÁÉV ZTE STADION KONZORCIUM közös ajánlattevők: 1) Pharos 95 Sportpályaépítő Kft. 2) ZÁÉV Építőipari Zrt.
cpvs
45000000, 45300000, 45210000, 45221250, 45316100, 45310000, 31527200, 34928520

Based on the context of the completion of Zalaegerszeg football sports facility development contract for construction works.
The total floor area of ​​16,000 m2 sports facility in the execution of these works will take place:
a) under the south bleachers existing structures ready-dressing marked "B" and head office complex transform and expand the building (built 1306 m2, 2109 m2 useful floor area), locker rooms under the south bleachers and toilet transformation groups;
b) under the east grandstand "construction sign toilet per 976 groups, as well as the western grandstand during the" on "D1", "D2 construction sign I" toilet groups;
c) north grandstand - and converted it to cover in such a way between the existing precast concrete beams remaining main span of 4.5 meters higher plane with cascading elements are installed - after the partial demolition. Instead of standing places are made of seats, 1936 seats in existing grandstands to "F", "G" sign toilet transform groups, and marked "P1" pavilions "P2" construction;
d) design and construction of the boiler house belonging pályafűtéshez track lighting (1200 LUX) and 1354 kW to 1440 kW nominal heat installation of a thermal power twin gas boiler, engineering and design of the system;
e) public works construction (plumbing breakdown: 99 m, construction: 161 m, sewer breakdown: 160 m, construction: 165 m, stormwater drain breakdown: 128 m, construction: 332 m, gas pipeline construction: 50 m, electric underground cable built: 2590 lm);
f) construction of roads and parking lot (3614 m2).
For full technical documentation content as part of the tender documentation.

Bagod Ady E. Street sidewalk construction, road widening and construction of storm water drainage works

Bagod Község Önkormányzata | Published April 15, 2015
cpvs
45000000, 45233260, 45233228, 45247112

Bagod Ady E. Street (74109 j 0 + 060 national road - between sections 0 + 780 km.) Sidewalk construction, road widening and construction of storm water drainage works 1. Pavement construction: Bagod Ady E. Street sidewalk construction Deak F. u . starting node to the Zalaboldogfa - Ady E. u. útcsatlakozásig last 720 m. The proposed sidewalk trail passes through a green field, with significant közműérintettség. The proposed sidewalk trail follows the existing 74,109 j. national road trail, right by logging based on 720 mph. The existing pavement on the entire stretch of 50 cm is widening. 2. Rainwater drainage - paved ditch the 0 + 440-0 + 724.12 kmsz. section between locally, respectively. during the discharge side gate driver esőáteresz 2 mph. 40x40x6 cm gravel ballast built paved ditch should be built. The locally led out of the existing stormwater drainage system for the same supplier has admitted - 209/6. u. property trench 195 + u. Csóri stream. - CS1-0-0 sign precipitation closed channel section constructed: - NA315 KG PVC rainwater 375.25 + 403.25 = 28 mh - Concrete head for 3 - 9 mph 40x40x6 cm paved ditch - 80b dia. cleaning holes 9 pieces - 50x50b grid víznyelőakna 14 - 30b dia. mh 6 wiring rainwater - NA200-KG / PVC rainwater wiring 36 mph

Contract modifications - based on the context of the completion of Zalaegerszeg football sports facility development contract for construction work

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published March 13, 2017
Winner
ZÁÉV ZTE STADION KONZORCIUM közös ajánlattevők: 1) Pharos 95 Sportpályaépítő Kft. 2) ZÁÉV Építőipari Zrt.
cpvs
45000000, 45300000, 45210000, 45221250, 45316100, 45310000, 31527200, 34928520

Based on the context of the completion of Zalaegerszeg football sports facility development contract for construction works.
The total floor area of ​​16,000 m2 sports facility in the execution of these works will take place:
a) under the south bleachers existing structures ready-dressing marked "B" and head office complex transform and expand the building (built 1306 m2, 2109 m2 useful floor area), locker rooms under the south bleachers and toilet transformation groups;
b) under the east grandstand "construction sign toilet per 976 groups, as well as the western grandstand during the" on "D1", "D2 construction sign I" toilet groups;
c) north grandstand - and converted it to cover in such a way between the existing precast concrete beams remaining main span of 4.5 meters higher plane with cascading elements are installed - after the partial demolition. Instead of standing places are made of seats, 1936 seats in existing grandstands to "F", "G" sign toilet transform groups, and marked "P1" pavilions "P2" construction;
d) design and construction of the boiler house belonging pályafűtéshez track lighting (1200 LUX) and 1354 kW to 1440 kW nominal heat installation of a thermal power twin gas boiler, engineering and design of the system;
e) public works construction (plumbing breakdown: 99 m, construction: 161 m, sewer breakdown: 160 m, construction: 165 m, stormwater drain breakdown: 128 m, construction: 332 m, gas pipeline construction: 50 m, electric underground cable built: 2590 lm);
f) construction of roads and parking lot (3614 m2).
For full technical documentation content as part of the tender documentation.

Zalaegerszeg, southern industrial area development (access road and parking lot, construction of public lighting) - Results of the procedure

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published March 23, 2015
Winner
Szabau Invest Építőipari és Ingatlanforgalmi Kft.
cpvs
45200000

Zalaegerszeg, southern industrial area development (access road and parking lot, construction of public lighting). The works shall be carried out in accordance with the technical documentation to be issued as part of the documentation. Construction work includes: • earthwork construction of a cutting, embankment construction: 698 m3 • Plant mixed Making cement stabilization (Ckt-4): 454 m3 • Tie by layers built asphalt mixture AC 22 (binding) F: 84 m3 • Tie by layers built asphalt mixture AC 11 (binding) F: 44 m3 • Wear layer built AC-11: 44 m3 • Wear layer built AC-11 (F): 34 m3 • Pavers housing construction: 262 m3 • Edge Construction (garden, recessed key): 715 m3 • gully placement: 4 • Cleaning piece shaft construction: Install 6 10 • Chandeliers • Tree Planting: 19 pcs • Planting Shrubs: 1266 pcs • Grassing: 1306 m2 detailed description of tasks, basic technical data, precise definition of the activities of the technical documentation. Bidder shall attach to the tender notice, priced unpriced budget is being released in the tender documentation. Under Regulation 23) Government. § 26 (6) accept everything with equivalent products.

Contract Amendment - in the framework of a contract for the construction of sewers in the village Bagod

Önkormányzati Társulás Zalaegerszeg és környéke csatornahálózat és szennyvíztisztítótelep fejlesztésére | Published August 19, 2015
Winner
HYDROCOMP Mélyépítő Kft.
cpvs
45232400, 45232411, 42120000, 42122220, 71240000

"In the framework of a contract for the construction of sewers in the village Bagod" The planned SZ-channel Bagod 1-0, on the south side of the street Lajos Kossuth St. Stephen Street. - Deak F. u. section extending between D110 / KPE wastewater discharge line replacement service (no. 201 drawing). The proposed gravity sewer recipient of the Szent István u. at the corner formed NA 200 / KGPVC connector, No. 8. tisztítóaknájába to be connected to the Kossuth Street wastewater discharge pipeline from the Deak F. u-east of remaining branches and the planned Channel No. 10. végaknájába to be connected D63 / KPE sewage in the street Deak F. pressure line. The rákötésekkel designed to ensure the channel to the east and north of the town sewage disposal areas. The 1-1 SZ-channel signal designed to ensure the Széchenyi street gravitational existing channels available to the Upstream Channel No. 1-0-marked. The SZ-channel signal végaknája 1-2 in the Green channel provides the gravitational field is connected to the future of the planned network. sewer construction D 200 / KG-PVC 540 fm D 150 / KG-PVC 95 m D 110 / HDPE pressure pipe 4 m útátfúrás: D 200 / KG-PVC 67 fm, D 150 / KG-PVC 75 fm, mine construction 22 pc Recovery and commissioning into service. Detailed description of the documentation.

Based on the context of the completion of Zalaegerszeg football sports facility development contract for construction works.

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published October 12, 2015  -  Deadline November 5, 2015
cpvs
45000000, 45300000, 45210000, 45221250, 45316100, 45310000, 31527200, 34928520

Based on the context of the completion of Zalaegerszeg football sports facility development contract for construction works.

Zalaegerszeg Municipality "Zalaegerszeg, construction of water facilities in the south section of water supply to Valley Street" szerz.mód

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published March 21, 2016
Winner
HYDROCOMP Mélyépítő Kft.
cpvs
45231300

Zalaegerszeg construction, water facilities for the Valley Street in the south section of water supply
Principal amount:
• D110 / HDPE PE100 PN10 SDR17 construction of water supply: 700 m
• D32 / HDPE PE100 PN10 SDR17 construction of water supply: 128 m
• NA80 column hydrant construction: 3
• NA100 column hydrant redevelopment: 1
• Booster construction: 1 piece
A detailed technical description of the tender documentation.
Offer the Offeror must submit unpriced budget priced for proposals to be issued as part of the tender documentation.
Contracting authority shall notify tenderers that the invitation to tender, as well as to an article specified in the documentation, references are made to type only a clear definition of the nature of the subject. The contracting authority 310/2011. under Regulation (XII. 23.) Government. § 26 (6) accepts everything with an equivalent product.
The level of reserve funding (the amount can be used only conditionally) the fee is 3% of the total business. arrangements for the use of reserve funding, possible cases, as well as detailed financial terms of the applicable documentation (draft contract). The margin is solely for the performance of works, necessary for the proper and safe use works against the value of the settlement.
Estimated value: 19,076,027 - HUF + VAT

Zalaegerszeg Municipality "Zalaegerszeg, construction of water facilities in the south section of water supply to Valley Street" No. 2 szerz.mód

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published March 18, 2016
Winner
HYDROCOMP Mélyépítő Kft.
cpvs
45231300

Zalaegerszeg construction, water facilities for the Valley Street in the south section of water supply
Principal amount:
# D110 / HDPE PE100 PN10 SDR17 construction of water supply: 700 m
# D32 / HDPE PE100 PN10 SDR17 construction of water supply: 128 m
# NA80 column hydrant construction: 3
# NA100 column hydrant redevelopment: 1
Booster Building #: 1
A detailed technical description of the tender documentation.
Bidder must enclose with your bid priced as part of the tender documentation
unpriced budget for proposals will be issued.
Contracting authority shall notify tenderers that the invitation to tender and the
Links specified make, type in the file with only the
To clearly establish the nature of the subject have been made. The contracting authority 310/2011. (XII.
under Regulation 23) Government. § 26 (6) accepts everything with an equivalent product.
The level of reserve funding (the amount can be used only conditionally) the fee is 3% of the total business. arrangements for the use of reserve funding, possible cases, as well as the financial conditions
detail in the documentation (draft contract). The margin only in the construction
investment performance, the proper and necessary for the safe use of work
counter-value accounting be used.
Estimated value: 19,076,027 - HUF + VAT

"Preparation and modification of a contract to perform construction works construction plan documentation alaegerszeg, Mártírok 42-44. u. Building during 3226/5 "

Zala Megyei Kormányhivatal | Published December 4, 2015
Winner
Szabau Invest Építőipari és Ingatlanforgalmi Kft.
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under Regulation 3226/5 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, flat roof heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

Zala County Hospital construction work on the "development of rehabilitation services in the West Pannon Region health institutions" in the NYDOP-5.2.1 / C number 11-2012-0001 framework of the project "to carry out additional construction tasks

Zala Megyei Kórház | Published September 18, 2015
Winner
ZÁÉV Építőipari Zrt
cpvs
45000000, 45215100, 45215220

"The development of rehabilitation services in the West Pannon Region health institutions" NYDOP-5.2.1 / C number 11-2011-0001 96m2 in size within a project Greenhouse construction. The greenhouse project is planned instead of restoration work, for technical reasons, a new glass house should be built and dismantled the old one. The topographical location of construction: 6123, unchanged, the terrain surface D gradient of 1-2% from the planned new building floor area built 96n2, a maximum height of less than 4.5m, so the Government 312/2012 (XI.8.) . order. According 1.mell.15.pont not building permit, it was only a simplified outline of the building plan. The construction of the building: Foundation: concrete sávalapozás socket C10 C16 reinforced concrete Body: Galvanized, idomacélvázas wall and roof structures, truss beams Housing: 16mm multiwall polycarbonate. Ventilation: along the ridge line, on both sides, 1m lane can be opened automatically, the side wall in two places, will be opened by hand. Tables: moveable legs fixed frame built track tables Floor: 10cm C12 bands smoothed concrete floor between the tables. Utilities: electricity in the building (3x16 A), water (1 ") and will be connected to district heating, property in lecsatlakozással

Installation of photovoltaic systems on the basis of the construction contract Egervári Primary School and Kindergarten and the Joint Municipal Office buildings. - Information on the amendment of the contract.

Egervár Község Önkormányzata | Published September 2, 2015
Winner
DNA Development Kft.
cpvs
45000000, 45310000, 45312310

Based on the installation of photovoltaic systems for the construction contract Laszlo Eger Castle Primary School and Nursery, and Egervári Joint Municipal Office buildings under the EEOP 2014-4.10.0 / N support scheme. Major work by gender and quantity (indicative): Municipal office - Construction of the building tetőfelületein 3 kW photovoltaic system School - Construction of the building tetőfelületein 35 kW inverter performance photovoltaic system Kindergarten - Construction of the building tetőfelületein 10 kW photovoltaic system The detailed terms and conditions of the tender documents (on contract and procurement technical specifications) were recorded.

"A contract under the EEOP 5.6.0 / 12-2013-0037 identification number of project preparation and documentation to carry out construction works construction plan Lenti, 11 hrsz Temple Square. Building during 1084/3 "

Zala Megyei Kormányhivatal | Published November 9, 2015
Winner
LE-KO Építőipari Kft.
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under Regulation 1084/3 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy saving, the attic floor and a flat roof heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, renewable energy utilizing solar building systems, and perform all of these and all associated ancillary works necessary. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

Contract award of Zala County Government Office, Göcsej u. 24 CONSTRUCTION

Zala Megyei Kormányhivatal | Published January 14, 2015
Winner
SZABADICS-ÉPÍTŐ Kft.
cpvs
45000000, 09331000, 45262630, 45331110, 45350000, 45421132, 42511110

Building at number 24. "Construction mode in industrialized building built in 8900 Zalaegerszeg Göcsej 24th street. No (hrsz.217 / 6). Zala County Government Office 1980, built in the early years of building (5,587 m2 total floor area, partial basement, ground floor and four floor levels are mechanical tetőfelépítménnyel with, UNIVÁZ system prefabricated pillar, födémes and falpanelos load-bearing structure was built, flat-roofed building): the poor thermal insulation capacity front Subsequent thermal insulation of walls, replacement, resulting in outdated and front doors and energy-saving, flat roof heat insulation and waterproofing, basement slab thermal insulation, upgrading the lighting system to the outdated lighting energy-saving luminaires exchange, renewable energy solar building, renewable energy solar system construction, and completion of all of these and all associated ancillary works necessary. These include in particular, but not limited to the following items: • On completion of transfer work areas of work, such as: the preparation and delivery Delivery # documentation. # Execution completion of the restoration of the staging area for the intended / planned state. Completion of the course # Test run • Technical leadership responsibilities and professional, careful construction management staff and equipment to ensure • on-site quality assurance (advance quality planning, quality education, while implementing continuous quality control, final quality control after each working part is finished for the working parts, working parts consecutive quality coordinating, quality control and documentation of materials used) to carry out work areas, • the fieldwork defense architectures, equipment and establishment, acquisition, on-site to ensure and guarantee the right to legal requirements OSH coordination and safety management. DESIGN forms part of the detailed design documentation for the technical description of the works, the itemized budget priced and unpriced. Main tasks and schedule of the contractor: content, implementation plans set out in the contract to make the draft documentation, preparing itemized budget priced and unpriced. Purchase the full implementation of the necessary permits - if necessary; Making implementation documentation. 15) provides that, subject to the relevant Call for proposals and specifications; The budget to be applied on the basis of a special mark to be specified list of items provided by the Contracting Authority (Customer), or for items not included in the items used in accordance with TERC-VIP (or equivalent) budget maker software system. Without requiring the winning bidder to be royalty to give the author the right to intellectual property which is the result of all the tasks carried out as a result of this process. 23.) Government Regulation Section 5 (5)) of all plans and documents to be prepared for the Hungarian language. The expected number of copies to be delivered Plans and Documentation: - Export plan, budget priced 4 for example. print + digital delivery (editable format)

landscape. szerz.mód about -KEOP-2014-4.10.0 / F bearing the code "Local governments and their institutions to develop building energy from renewable energy sources combined with the convergence region" within the framework of carrying out tender on construction works construction

Bocfölde Község Önkormányzata | Published June 17, 2015
Winner
EVO-KOMPLEX Kft.
cpvs
45310000

Bocfölde Municipality "Local governments and their institutions to develop building energy combined with renewable energy sources in the convergence regions' EEOP 2014-4.10.0 / F-coded construction completion of construction within the framework of applications submitted for the tender construct works on. Bocfölde School: 471 m2 facade insulation 10cm EPS sheet 42 m2 plinth insulation of 10 cm XPS sheets are controlled, 65 pcs nyílsázárócsere boiler replacement condensing boiler heating modernization of the DHW system is installed 12kW V solar system for detailed quantitative values ​​contained in the technical description and unpriced budget proposals .

"In the framework of a contract for the construction of sewers in the village Bagod" - Results of the procedure

Önkormányzati Társulás Zalaegerszeg és környéke csatornahálózat és szennyvíztisztítótelep fejlesztésére | Published November 21, 2014
Winner
Hydrocomp Mélyépítő Kft.
cpvs
45232400, 45232411, 42120000, 42122220, 71240000

"In the framework of a contract for the construction of sewers in the village Bagod" The proposed S-1-0 Bagod channel on the south side of St. Stephen Kossuth Lajos utca street. - Deak F. u. section extending between the D110 / waste HDPE pressure pipe replacement to serve (no. 201 plan). The proposed gravity sewer recipient of the St. Stephen's Street. corner formed NA 200 / KGPVC nipple, No. 8. tisztítóaknájába must be connected to the sewage discharge conduit Kossuth utca, Deák F. u from the east branch and the remaining channel 10 was planned. végaknájába to be connected D63 / HDPE waste water in the discharge line to Deák Ferenc street. The rákötésekkel ensure the proposed settlements lying to the north and east of the channel effluent drainage areas. The SZ-1-1 channel signal designed to ensure the existing gravity Széchenyi street Upstream channel free of the channel C-labeled 1-0. The channel W-1-2 provides végaknája marked channel in the gravitational field Green Street to connect the future of the planned network. sewer construction: D 200 / KG PVC 540 m D 150 / KG PVC 95 m D 110 / HDPE pressure pipe 4 m útátfúrás D 200 / KG-PVC, 67 m, D 150 / KG PVC 75 meter shaft construction 22 pieces restoration and commissioning into service. A detailed description of the documentation.

Contract amendment - "Bagod Municipality KEOP-2015-5.7.0" building energy development priority of public buildings, "under a tender submitted for the tendering facility are entitled to carry out construction works construction."

Bagod Község Önkormányzata | Published November 11, 2015
Winner
SZABAU INVEST Kft.
cpvs
45421100, 45321000

completing applications submitted for the tender construct the framework of "building energy development priority of public buildings" in Agod Municipality KEOP-2015-5.7.0 building-construction works. School Doors and windows replacement of 175 m2 flat roof insulation 110 m2 facade insulation 962 m2 Attic Ceiling Insulation 869 m2 Basement Ceiling Insulation 82 m2, gym and windows replacement 142 m2 flat roof insulation 0 m2 facade insulation 846 m2 Attic Ceiling Insulation 539 m2 Basement ceiling insulation 0 m2 Kitchen Doors and windows replacement 47 m2 flat roof insulation 0 Attic insulation Facade m2 349 m2 262 m2 Basement Ceiling insulation Ceiling insulation 0 m2 A detailed quantitative values ​​are unpriced technical specifications and budget proposals.

Letenye 8868, Issue 3 under Freedom Square, 398 topographical number of real estate developed an integrated customer service (steering box) complete building construction works, roof insulation and carrying out works.

Zala Megyei Kormányhivatal | Published June 10, 2015
Winner
Kanizsa Produkt Bau Kft.
cpvs
45262700, 45261400, 45310000, 45350000, 45261410, 45312311

Zala County Government Office "Providing equal access to public services: accessibility", 398 topographical number of real estate developed an integrated customer service desired by SIOP-3.3.1-12/2 with code call frame to achieve 8868 Letenye, Liberty Square No. 3 below (steering box) complete building construction works, roof insulation and carrying out works. Quantity: a) are occupied by real governments window areas of comprehensive, complex accessibility construction works for completion: ramp construction, disabled toilets design and - in order to accommodate the work stations - internal alterations (existing wall demolition, construction) etc. b.) 1 barrier-free design of cars waiting place in accordance with the authorization plan documentation be maintained. c.) the building's flat roof heat and waterproofing of renovating and making lightning protection installation works.

Contract award of Zala County Government Office, Kosztolanyi D. u. No. 10. CONSTRUCTION

Zala Megyei Kormányhivatal | Published February 11, 2015
Winner
SZABAU Invest Építőipari és Ingatlanforgalmi Kft.
cpvs
45000000, 09331000, 45262630, 45331110, 45350000, 45421132, 42511110, 71245000

Traditional construction method, built unprotected building 8900 Zalaegerszeg, Kosztolányi street No. 10. (U .: 2404/0 / A / 1-16.) Below. The inner courtyard there is a third wing, which is connected to the főszárnyhoz two bridges. The building subsequent thermal insulation of the poor thermal insulation capacity and front walls of the flat roof of heat and water insulation of the attic floor and the high roof heat insulation, replacement, resulting in outdated and front doors and energy saving, upgrading the lighting system with energy-efficient luminaires by replacing the outdated lighting, renewable energy utilizing solar system construction, and completion of all of these and all associated ancillary works necessary. These include in particular, but not limited to the following items: • On completion of transfer work areas of work, such as: the preparation and delivery Delivery # documentation. # Execution completion of the restoration of the staging area for the intended / planned state. Completion of the course # Test run • Technical leadership responsibilities and professional, careful construction management staff and equipment to ensure • on-site quality assurance (advance quality planning, quality education, while implementing continuous quality control, final quality control after each working part is finished for the working parts, working parts consecutive quality coordinating, quality control and documentation of materials used) to carry out work areas, • the fieldwork defense architectures, equipment and establishment, acquisition, on-site to ensure and guarantee the right to legal requirements OSH coordination and safety management. DESIGN forms part of the detailed design documentation for the technical description of the works, the itemized budget priced and unpriced. Main tasks and schedule of the contractor: content, implementation plans set out in the contract to make the draft documentation, preparing itemized budget priced and unpriced. Purchase the full implementation of the necessary permits - if necessary, preparation of documentation Implementation. 15) provides that, subject to the relevant Call for proposals and specifications; The budget to be applied on the basis of a special mark to be specified list of items provided by the Contracting Authority (Customer), or for items not included in the items used in accordance with TERC-VIP (or equivalent) budget maker software system. Without requiring the winning bidder to be royalty to give the author the right to intellectual property which is the result of all the tasks carried out as a result of this process. 23.) Government Regulation Section 5 (5)) of all plans and documents to be prepared for the Hungarian language. The expected number of copies to be delivered Plans and Documentation: - Export plan, budget priced 4 for example. print + digital delivery (editable format) Contracting fix that entrepreneurial type of contract with a lump sum. The conditions include the use of reserve funding agreement which is part of the tender documentation draft. The detailed technical specifications and the draft contract in the tender documentation. Bidder shall attach to the tender notice, of the main budget priced unpriced work are not being released as part of the tender documents, which do not have the opportunity to work to expand the Bidder. Under Regulation 23) Government. § 26 (6) accept everything with equivalent products.