Call +44 800 9755 164

Public tenders for construction in Tolcsva Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

TSzM - Sárazsadány designs under the ÉMOP-2.1.1 / Project ID No. 14-2014-0001 F-- Part 1: Construction bicycle motocross track built Earth

Sárazsadány Község Önkormányzata | Published November 6, 2015
Winner
Four Road Kft.
cpvs
45000000, 45100000, 45111200

"Sárazsadány designs under the ÉMOP-2.1.1 / Project ID No. 14-2014-0001 F" in the following sub-tender possibilities: Part 1: Construction bicycle motocross track built Earth Part 2: High-altitude construction of park development, Part 3: Skill Bikes academic track construction Part 4: construction work accessible to disabled skill-developing playground Volume: Part 1: Earth built bicycle motocross track design: Earth built skill and motocross track design, which is the BMX and Mountain biker utilized, too. The maximum height of 3 m uploads. Course Structure BMX track: Length: 256, 00 m Track width: 6.00 m - 20 cm thick compacted humus - 18 cm thick gravel drainage layer - 1 layer. geotextile - Variable Spreading thick compacted earth fill GEOTEXTIL 1644 m2 humic topsoil, soil drawal of charge Mechanically, 18% terephajlásig, in any soil, transport, 50.0 m up to 474 m 3 Humuszterítés 20 cm thick mechanically, additional horizontal hand surface 50 m up to 2409 m2 1644 m2 Compress any compression class mechanical strength, high surface compactness degree: 95% 1041 m3 preparation BMX track earthworks mechanical strength, power engineering, slope training Production of 562 m3 road with Internal mechanical power 646 m2 Excavated earth Putting vehicle rolled 1021 m3 smoothing the surface of the earthwork, mechanical strength, 3.0 m width greater than 1135 m2 Soil preparation layer line installations over 3.00 m width, ungraded gravel THK 0/32 P-TT 295 m3 of natural grain gravel Landfill training 831 m3 Part 2: High-altitude park developer execution: 30 pieces include experiences from the adventure park, the landscape matching wooden elements are largely built, which is complemented by the other elements of a total active fleet covers. Building works: - Holder piles installation, alapbetonozása - Wire Rope System is installed - the establishment receiving station - placing Developer tasks, size settings according to the task queues Part 3: Construction Skill bike academic career: The reconstituted track are placed on their track parts and components that the cycling of learning an indispensable tool. The valley-side loading pages must be for a potentially led out by the frost protection layer of water erosion Bicycle academic career crushed stone felületerősítéssel: Length: 223.50 m Track width: 4.00 m - 4 cm thick AC-8 wearing course - 5 cm thick AC-11 to 18 cm Ckt thick. - 20 cm thick gravel drainage layer - 1 layer of geotextile - variable thick compacted earth fill GEOTEXTIL Spreading 1,250 m2 humic topsoil, soil drawal of charge Mechanically, 18% terephajlásig, in any soil, transport, 50.0 m up to 300 m 3 Humuszterítés 20 cm thick mechanically, additional hand-m horizontal surface up to 50 m2 in 1500

TSzM - Sárazsadány designs under the ÉMOP-2.1.1 / Project ID No. 14-2014-0001 F-- Part 3: construction work for school Skill bike path

Sárazsadány Község Önkormányzata | Published November 9, 2015
Winner
Four Road Kft.
cpvs
45000000, 45100000, 45111200

"Sárazsadány designs under the ÉMOP-2.1.1 / Project ID No. 14-2014-0001 F" in the following sub-tender possibilities: Part 1: Construction bicycle motocross track built Earth Part 2: High-altitude construction of park development, Part 3: Skill Bikes academic track construction Part 4: construction work accessible to disabled skill-developing playground Volume: Part 1: Earth built bicycle motocross track design: Earth built skill and motocross track design, which is the BMX and Mountain biker utilized, too. The maximum height of 3 m uploads. Course Structure BMX track: Length: 256, 00 m Track width: 6.00 m - 20 cm thick compacted humus - 18 cm thick gravel drainage layer - 1 layer. geotextile - Variable Spreading thick compacted earth fill GEOTEXTIL 1644 m2 humic topsoil, soil drawal of charge Mechanically, 18% terephajlásig, in any soil, transport, 50.0 m up to 474 m 3 Humuszterítés 20 cm thick mechanically, additional horizontal hand surface 50 m up to 2409 m2 1644 m2 Compress any compression class mechanical strength, high surface compactness degree: 95% 1041 m3 preparation BMX track earthworks mechanical strength, power engineering, slope training Production of 562 m3 road with Internal mechanical power 646 m2 Excavated earth Putting vehicle rolled 1021 m3 smoothing the surface of the earthwork, mechanical strength, 3.0 m width greater than 1135 m2 Soil preparation layer line installations over 3.00 m width, ungraded gravel THK 0/32 P-TT 295 m3 of natural grain gravel Landfill training 831 m3 Part 2: High-altitude park developer execution: 30 pieces include experiences from the adventure park, the landscape matching wooden elements are largely built, which is complemented by the other elements of a total active fleet covers. Building works: - Holder piles installation, alapbetonozása - Wire Rope System is installed - the establishment receiving station - placing Developer tasks, size settings according to the task queues Part 3: Construction Skill bike academic career: The reconstituted track are placed on their track parts and components that the cycling of learning an indispensable tool. The valley-side loading pages must be for a potentially led out by the frost protection layer of water erosion Bicycle academic career crushed stone felületerősítéssel: Length: 223.50 m Track width: 4.00 m - 4 cm thick AC-8 wearing course - 5 cm thick AC-11 to 18 cm Ckt thick. - 20 cm thick gravel drainage layer - 1 layer of geotextile - variable thick compacted earth fill GEOTEXTIL Spreading 1,250 m2 humic topsoil, soil drawal of charge Mechanically, 18% terephajlásig, in any soil, transport, 50.0 m up to 300 m 3 Humuszterítés 20 cm thick mechanically, additional hand-m horizontal surface up to 50 m2 in 1500

"Interactive pilgrim village museum - Host rest area building construction (Part 1) as well as gastronomic service building and building construction (Part 2) under the ÉMOP-2.1.1 / F ID No. 14-2014-0001 project"

Bodrogolaszi Község Önkormányzata | Published September 25, 2015
Winner
Polgári Építőipari Kereskedelmi és Szolgáltató Kft.;
cpvs
45000000, 45262210, 45261400, 45113000

„Interaktív falumúzeumhoz zarándok - pihenőhely fogadó épületének kivitelezése (1. rész), valamint gasztronómiai épület és kiszolgáló épületének kivitelezése (2. rész) az ÉMOP-2.1.1/F-14-2014-0001 azonosító számú projekt keretében” Mennyisége: 1. rész: Interaktív falumúzeumhoz zarándok - pihenőhely fogadó épületének kivitelezése az ÉMOP-2.1.1/F-14-2014-0001 azonosító számú projekt keretében Az új kiszolgáló épület építése a környező, falusias beépítettség figyelembe vételével, a szomszédságában lévő román stílusú műemlék templomra tekintettel, a hagyományos formák és színek alkalmazásával történik, az érvényes rendezési terv előírásai alapján. Az épülő épület az idegenforgalmat szolgálja, csónakon vagy bakancsos turistaként érkező családi, baráti társaságok színvonalas kiszolgálására szolgál, nem minősül közhasználatú építménynek. Az épület földszintes, kontyolt nyeregtetővel és piros színű hagyományos cserépfedéssel, világos tört fehér homlokzatvakolattal készül. A telek gyakorlatilag vízszintes, tájolási adottságai jók. Az épület a gáton kívül, hullámtérben épül, de egy magasabb fekvésű területen, ezért a mértékadó árvízszintre való tekintettel lett a padlószint meghatározva, afölött 1,0 m-el, ez gyakorlatilag a gát korona szintje is. A település érvényes rendezési tervében a telek műemléki környezetben van, övezeti besorolása, vízparti üdülőterület. 2. rész: Gasztronómiai épület és kiszolgáló épületének kivitelezése az ÉMOP-2.1.1/F-14-2014-0001 azonosító számú projekt keretében - Gasztronómiai épület kivitelezése: Az épület egy gasztronómiai célokat szolgáló, lábakon álló kerti pavilon, amiben különböző kerti építménynek számító, hagyományos népi módszereket használó funkció épül bele, úgymint: • kemence, • lekvárfőző, • füstölő • gyümölcsaszaló. Az épületen kívül, helyszínrajzon jelöltek szerint készül egy szabadtéri tűzhely, szalonnasütés, bográcsolás céljára, ami szintén kerti építménynek számít. - Gasztronómiai épület kiszolgáló épületének kivitelezése Az új kiszolgáló épület építése a környező beépítettség figyelembe vételével, a telken meglévő és épülő épületekhez való igazodással történik, az érvényes rendezési terv előírásai alapján. Az épülő épület az idegenforgalmat szolgálja, családi, baráti társaságok színvonalas kiszolgálására szolgál, nem minősül közhasználatú építménynek. Az épület földszintes, kontyolt nyeregtetővel és piros színű hagyományos cserépfedéssel, világos okkersárga homlokzatvakolattal készül. A tetőszerkezet összeépül az építendő gasztronómiai épület tetőszerkezetével. A telek gyakorlatilag vízszintes, tájolási adottságai jók. A pontos mennyiségeket és műszaki leírást a dokumentáció tartalmazza.

TSzM - Interactive pilgrim village museum - Host rest area building construction (Part 1) as well as gastronomic service building and building construction (Part 2) under the ÉMOP-2.1.1 / Project ID No. 14-2014-0001 F

Bodrogolaszi Község Önkormányzata | Published November 5, 2015
Winner
Polgári Építőipari Kereskedelmi és Szolgáltató Kft.
cpvs
45000000, 45262210, 45261400, 45113000

„Interaktív falumúzeumhoz zarándok - pihenőhely fogadó épületének kivitelezése (1. rész), valamint gasztronómiai épület és kiszolgáló épületének kivitelezése (2. rész) az ÉMOP-2.1.1/F-14-2014-0001 azonosító számú projekt keretében” Mennyisége: 1. rész: Interaktív falumúzeumhoz zarándok - pihenőhely fogadó épületének kivitelezése az ÉMOP-2.1.1/F-14-2014-0001 azonosító számú projekt keretében Az új kiszolgáló épület építése a környező, falusias beépítettség figyelembe vételével, a szomszédságában lévő román stílusú műemlék templomra tekintettel, a hagyományos formák és színek alkalmazásával történik, az érvényes rendezési terv előírásai alapján. Az épülő épület az idegenforgalmat szolgálja, csónakon vagy bakancsos turistaként érkező családi, baráti társaságok színvonalas kiszolgálására szolgál, nem minősül közhasználatú építménynek. Az épület földszintes, kontyolt nyeregtetővel és piros színű hagyományos cserépfedéssel, világos tört fehér homlokzatvakolattal készül. A telek gyakorlatilag vízszintes, tájolási adottságai jók. Az épület a gáton kívül, hullámtérben épül, de egy magasabb fekvésű területen, ezért a mértékadó árvízszintre való tekintettel lett a padlószint meghatározva, afölött 1,0 m-el, ez gyakorlatilag a gát korona szintje is. A település érvényes rendezési tervében a telek műemléki környezetben van, övezeti besorolása, vízparti üdülőterület. 2. rész: Gasztronómiai épület és kiszolgáló épületének kivitelezése az ÉMOP-2.1.1/F-14-2014-0001 azonosító számú projekt keretében - Gasztronómiai épület kivitelezése: Az épület egy gasztronómiai célokat szolgáló, lábakon álló kerti pavilon, amiben különböző kerti építménynek számító, hagyományos népi módszereket használó funkció épül bele, úgymint: • kemence, • lekvárfőző, • füstölő • gyümölcsaszaló. Az épületen kívül, helyszínrajzon jelöltek szerint készül egy szabadtéri tűzhely, szalonnasütés, bográcsolás céljára, ami szintén kerti építménynek számít. - Gasztronómiai épület kiszolgáló épületének kivitelezése Az új kiszolgáló épület építése a környező beépítettség figyelembe vételével, a telken meglévő és épülő épületekhez való igazodással történik, az érvényes rendezési terv előírásai alapján. Az épülő épület az idegenforgalmat szolgálja, családi, baráti társaságok színvonalas kiszolgálására szolgál, nem minősül közhasználatú építménynek. Az épület földszintes, kontyolt nyeregtetővel és piros színű hagyományos cserépfedéssel, világos okkersárga homlokzatvakolattal készül. A tetőszerkezet összeépül az építendő gasztronómiai épület tetőszerkezetével. A telek gyakorlatilag vízszintes, tájolási adottságai jók. A pontos mennyiségeket és műszaki leírást a dokumentáció tartalmazza.

Sárazsadány the framework of the implementation ÉMOP-2.1.1 / Project ID No. 14-2014-0001 F: construction work accessible to disabled capacity building playground

Sárazsadány Község Önkormányzata | Published October 19, 2015
Winner
Four Road Építő és Szolgáltató Kft.
cpvs
45000000

Wheelchair accessible playground implementation of capacity-building: A wooden playground implementation of appropriate European Union standards, purchase items, swing, swing swing, seesaw, slide tunnel, balancing beams, purchase and installation of handicapped swing. Building works: Spreading GEOTEXTIL 250 m2 humic topsoil, soil drawal of charge Mechanically, 18% terephajlásig, in any soil, transport, 50.0 m to 50 m 3 Humuszterítés 20 cm thick mechanically, additional manual work on a horizontal surface 50 m up to 250 m2 mirror without making compression, additional mechanical strength hand on a flat surface soil classes I-IV. 250 m2 expansion coupon notch lower than 3.00 m thickness of 100 m3 any compression compression class mechanical strength, high surface compactness degree: 95% to 50 m3 of earthworks smoothing rolled (mirror and shoulder) on the surface, mechanical strength, 3.0 m Excavated width of more than 250 m2 of land vehicle loading of 100 m3 to 100 m3 Landfill training in the exact quantities and specifications contained in the dossier. The 310/2011. (XII. 23.) of the Government Decree. § 26 (6) laid out view of the contracting authority points out that if the object of the procurement is clear and understandable definition required the particular make and model, frequency, type of thing, process, activity, person, patents or reference to the marks, to name only a clear definition of the nature of the subject, and in addition to the term "or equivalent" is understood in all cases. Contracting draw attention to, things to equivalent megajánlása equivalence for the tenderers must demonstrate its offer.

Finding information on the subject Sárazsadány designs under the procedure ÉMOP-2.1.1 / Project ID No. 14-2014-0001 F

Községi Önkormányzat Sárazsadány | Published September 25, 2015
Winner
Four Road Kft.;Four Road Kft.;Four Road Kft.;
cpvs
45000000

"Sárazsadány designs under the ÉMOP-2.1.1 / Project ID No. 14-2014-0001 F" in the following sub-tender possibilities: Part 1: Construction bicycle motocross track built Earth Part 2: High-altitude construction of park development, Part 3: Skill Bikes academic track construction Part 4: construction work accessible to disabled skill-developing playground Volume: Part 1: Earth built bicycle motocross track design: Earth built skill and motocross track design, which is the BMX and Mountain biker utilized, too. The maximum height of 3 m uploads. Course Structure BMX track: Length: 256, 00 m Track width: 6.00 m - 20 cm thick compacted humus - 18 cm thick gravel drainage layer - 1 layer. geotextile - Variable Spreading thick compacted earth fill GEOTEXTIL 1644 m2 humic topsoil, soil drawal of charge Mechanically, 18% terephajlásig, in any soil, transport, 50.0 m up to 474 m 3 Humuszterítés 20 cm thick mechanically, additional horizontal hand surface 50 m up to 2409 m2 1644 m2 Compress any compression class mechanical strength, high surface compactness degree: 95% 1041 m3 preparation BMX track earthworks mechanical strength, power engineering, slope training Production of 562 m3 road with Internal mechanical power 646 m2 Excavated earth Putting vehicle rolled 1021 m3 smoothing the surface of the earthwork, mechanical strength, 3.0 m width greater than 1135 m2 Soil preparation layer line installations over 3.00 m width, ungraded gravel THK 0/32 P-TT 295 m3 of natural grain gravel Landfill training 831 m3 Part 2: High-altitude park developer execution: 30 pieces include experiences from the adventure park, the landscape matching wooden elements are largely built, which is complemented by the other elements of a total active fleet covers. Building works: - Holder piles installation, alapbetonozása - Wire Rope System is installed - the establishment receiving station - placing Developer tasks, size settings according to the task queues Part 3: Construction Skill bike academic career: The reconstituted track are placed on their track parts and components that the cycling of learning an indispensable tool. The valley-side loading pages must be for a potentially led out by the frost protection layer of water erosion Bicycle academic career crushed stone felületerősítéssel: Length: 223.50 m Track width: 4.00 m - 4 cm thick AC-8 wearing course - 5 cm thick AC-11 to 18 cm Ckt thick. - 20 cm thick gravel drainage layer - 1 layer of geotextile - variable thick compacted earth fill GEOTEXTIL Spreading 1,250 m2 humic topsoil, soil drawal of charge Mechanically, 18% terephajlásig, in any soil, transport, 50.0 m up to 300 m 3 Humuszterítés 20 cm thick mechanically, additional hand-m horizontal surface up to 50 m2 in 1500

"Bodrogolaszi, King Mátyás György Dózsa, CERKOM, Kossuth Kossuth street and road reconstruction" project

Bodrogolaszi Község Önkormányzata | Published August 12, 2015
Winner
MP Konzorcium (MENTO Környezetkultúra Kft. és Polgári Építőipari Kft.)
cpvs
45000000

"Bodrogolaszi, King Mátyás György Dózsa, CERKOM, Kossuth Kossuth street and road reconstruction" construction on the project. King Matthias Street: The renovated road length 227 meters, width of 2.90 meters. Dózsa Street: the renovation path length of 553 meters and a width of between 0 + 000-0 + 423 segments of 3.50 m, between sections 0 + 423 to 0 + 553 m of 3.10. CERKOM street: the renovation path length of 399 meters and a width of between 0 + 000-0 + 092 segments of 2.80 meters, between 0 + 092-0 + 247 segments of 3.10 meters between sections 0 + 247 to 0 + 399 2, 90 meters. Rákóczi street: the renovation path length of 262 meters and a width of 2.70 meters. Kossuth utca: The renovated road length 303 meters, width of 3.00 meters. For your information the estimated value of a contract for a total of 72 million net, - Ft.

2. NO. Contract modification of a contract - Tolcsva World Heritage cellars for tourist purposes in connection with the development and rehabilitation of street Tolcsva Village area of ​​civil engineering works

Tolcsva Község Önkormányzata | Published December 16, 2015
Winner
POLANT Konzorcium
cpvs
45000000

In addition to the area of ​​rehabilitation builder it is intended to create a public space, a place where major events, public programs can be maintained, while smaller community life from the cellar bushes is more harmonious, orderly, balanced the space next to that effect in the life of the town everyday use the festive days, the peaceful pastime, a place worthy cultural space, it would be a greater cohesion and supportive space for small groups. To do this, the existing technical state of public places, roads, public lighting system, surface water drainage, the existing terrain conditions, transport possibilities between the spaces and levels must be improved. The whole investment is a fundamental principle of the right, style, color, texture, quality fit, but it also reflects the uniqueness So the natural stone, wood, or the elaborate wrought metal define the look. 06.23 u: Outdoor stage and street, water connection of tangible property would build two buildings: the first is a water block street is like a basement made of the same style head rest structural design of the building design documentation detailing is attached. An open-air stage, plan according to location, style and design, the space surface settlement with partial covering of the building affected areas existing accession to the local public road along the lower section of the Arany János road drainage ditch in poor condition, must be covered again on the road top section 23.6 and the parcel number of existing public spaces along the road is not open or covered ditch next to the road, the free and unregulated flow of surface water following the natural slope of the terrain, ditches washed into the Ady Endre Street. In these places next to the road surface drainage troughs These materials are planned lined betongerendával raised will be put into concrete cube made of stone. The 6.23 topographical planned number sanitary partial accessibility of solved, but the resulting terrain, roads natural slope of the barrier-free approach is not suitable and designed for 43/2 plot numbers spittoon block is not disabled toilet, it can be made approach unobstructed. Technically formulated and measurable, quantitative, precise budget proposals contain exact details of individual plants and artifacts produced. The planned stage floor area: 92.99 m2. 43/2 and 23/6 HRSZ street, sanitary Building Services: A plot numbers 43/2 and 23/6 for the parcel number planned sanitary water piping installation: The facility is connected to the municipal drinking water systems be built. The building demand for water from the toilet and hand washing use: approx. 0.1 m3 per day. 1.5 l / sec. The domestic hot water (DHW) supply will not be. The need for sanitary hot water is provided by electric water heater with a locally positioned. The communal sanitation facilities in the settlement of the wastewater volume of approx .: 0.1 m3 / day. The sewage system has led to soil basic cable network KGPVC material PVC and PE pipe interiors of the network is planned. Outside the building connected to the existing sewer system (including 6.23% V 0.5 A csatornahálózatoz building, outside the building ... one inch slope of 1.3% to the front. General The pipes must be installed, due to the heat stress without causing harmful tágulásból . must be insulated against the piping of water incursion. Vertical layout of the proposed sewer pipeline elevation layout of the terrain geodetic height differences and existing of the planned pipeline on the ground level approximately parallel. The tüzivízhálózat water requirement includes the safety-fire plan chapter. Heating in the construction works will not be. Cooling demand no gas demand is not inner space of the premises and WCk ventilation in the plan is solved by an individual extractor fans these fans have a presence and humidity sensor, such as the power supply room with single air change number and provide local exhaust fan using the sanitary planned floor space.... 21.97 m2, and 32.49 m2. Construction of parking and access routes into Tolcsva town Arany János utca opens onto a service road, which should be on the left side of the cemetery road connection at the mid-AA area is a steel truss column that ÉMÁSZ network, these replacement is not resolved, so the parking lots of them taking into account the location must be placed. A total of 28 car parking spaces must be established to ensure the cemetery for those coming from cars in the parking lot paving housing would be built. The lead-in path length of 45 m. 4. Provides Power

CONTRACT MODIFICATION No 1 on a contract - Tolcsva World Heritage cellars for tourist purposes in connection with the development and rehabilitation of street Tolcsva Village area of ​​civil engineering works

Községi Önkormányzat | Published November 30, 2015
Winner
POL-ANT Konzorcium
cpvs
45000000

The area in this sense the life of the village next to the everyday use of the festive days, the peaceful pastime, a place worthy cultural spaces, promoting greater cohesion and small groups would map. To do this, the existing technical state of public places, roads, public lighting system, surface water drainage, the existing terrain conditions, transport possibilities between the spaces and levels must be improved. So the natural stone, wood, or the elaborate wrought metal define the look. 06.23 u: Outdoor stage and street, water connection of tangible property with two buildings would be built: Structural design of the supplied documentation detailing plans are. An amphitheater, according to plan, place, style and design, the space surface settlement with partial covering of these materials lined betongerendával raised will be put into concrete cube made of stone. The proposed parcel number 43/2 water Disabled toilet block, no, no approach can be made accessible for people. Technically formulated and measurable, quantitative, precise budget proposals contain exact details of individual plants and artifacts produced. The planned stage floor area: 92.99 m2. 43/2 and 23/6 HRSZ street, sanitary Building Services: A plot numbers 43/2 and 23/6 for the parcel planned number of plumbing sanitary sewer installation: The facility is connected to the municipal drinking water systems be built. The building demand for water from the toilet and hand washing use: approx. 0.1 m3 per day. 1.5 l / sec. The domestic hot water (DHW) supply will not be. The need for sanitary hot water is provided by electric water heater with a locally positioned. The waste water quantity: approx .: 0.1 m3 / day. The interiors PE pipe network is planned. Within the 0.5% csatornahálózatoz building, outside the building ... 1.3 1% slope to the front. General requirements - The pipes must be installed to tágulásból the heat caused by harmful voltages are not created. - To be protected against the incursion of water pipes. Altitude layout of the proposed pipeline is approximately parallel to the ground level. The fire water network, water requirement of the safety-fire plan includes chapters. Heating will not be in the works. There is no cooling demand. Gas is not required. Interior, rooms and toilets in the plan, solve unique ventilation with extractor fans. The power supply is a single-room air change number and provide local exhaust fan can help. The sanitary planned floor area: 21.97 m2 and 32.49 m2. Construction of parking and access routes into the parking space would be built of stone paneling. The lead-in path length of 45 m. 4. Network Power Service to replace: the work involved in both the private and public space serves as an economic and tourism, tourism-related interests. You must be performed by four wooden poles and six concrete columns and installation of replacement units and 32 retail distribution 724 m underground cable hálózatkiváltás Within the framework of the entrepreneur. Public Lighting: we want energy-efficient backlight design view of the above, taking into account the financial possibilities of the sight and investment requirements laid down. A total of 29 pieces of the installation must be carried out within the candelabra lighting design itself. The planned landscaping, a clear description of the environmental arrangement works: Contracting draw attention to, things to equivalent megajánlása equivalence for the tenderers must demonstrate its offer.
  • 1