Information regarding a contract for 3 Waste Monitoring Station building construction, and waste-3 related monitoring and research laboratory supply and construction of the necessary construction of installations subject award notice

Tokaj AltEnergia Nonprofit Kft. | Published October 26, 2015
Winner
Swietelsky Magyarország Kft.
cpvs
45000000, 45231100, 45231110, 45255110, 45111000, 45214610

A contract for 3 Waste Monitoring Center building carrying (gázgyűjő wells, gas system pipes, gas regulator stations, gas collection ridge lines, condensate drain tank, gas handling container unit, depógáz kiln establishment) and related three pieces of waste monitoring and research laboratory supply and construction of the necessary construction of installations. Contracting the long-term aim that the municipal waste (non-hazardous waste) to be determined on the basis of data obtained by the test results, information from wastes obtained from energy efficient method of selection of the most modern and most efficient recycling technology to the test sites, the optimal location by specifying the optimum use of energy, for energy production. In order to achieve the above objectives, the present procedure under the Contractor is responsible 3 Waste Monitoring Station (Debrecen, Nyíregyháza, Godollo) building construction (gázgyűjő wells, gas system pipes, gas regulator stations, gas collection ridge lines, condensate drain tank, gas handling container unit, the establishment of depógáz kiln) and 3 waste related monitoring and research laboratory supply and construction of the necessary installations building. Implementation of the Waste Monitoring Stations 3 spot on the body of waste gas collection system with a total of 4234 m of gas service pipe and gas collecting 451 fm construction of main pipeline will be implemented. The task will be set out in detail in the tender documents, with particular attention as part of the tender documentation, tender plans, quantification, measurement site plan drawings, blueprints are laid out in a line. The Contracting Authority points out that:. According to Government Decree No 23) § 26 paragraph (6) shall meet "equivalent" products. - During the Tender used in the works "equivalent" product which is the technical part of the tender documentation, tender plans, waste monitoring station technical description and budget Supplementary Regulations understood right products.

3 contract to Waste Monitoring Station building construction, as well as 3 associated with waste monitoring and research laboratory supply and construction of the necessary installations building.

Tokaj AltEnergia Nonprofit Kft. | Published July 3, 2015  -  Deadline July 20, 2015
cpvs
45000000, 45231100, 45231110, 45255110, 45111000, 45214610

A contract to 3 Waste Monitoring Center building carrying (gázgyűjő wells, gas system pipes, gas regulator stations, gas collection ridge lines, condensate drain tank, gas handling container unit, depógáz kiln establishment) and related 3 waste monitoring and research laboratory supply and construction of necessary construction of installations.

Wine Museum II. KÉ landscape construction schedule. (Tokaj)

Tokaj Város Önkormányzat | Published June 17, 2015
Winner
ÉPSZER Zrt.
cpvs
45200000, 45212314

Subject: Lump Sum business (construction) contract - the "establishment of the World Heritage town of Tokaj Wine Museum" project (ÉMOP-2.1.1 / B-09-2009-0028) II. the pace of building construction works Quantity: Tokaj, József Attila u. 9 (u .: 379) restoring the original eighteenth listed building. c. particular designs. Under renovation as protected monuments, transformation. The XVIII. In pigs century and was built for the purpose of cooking brandy, part basement, ground floor + I floor building (Beerhouse) restoring the building's original map of restoring the system. The context of tangible projects previously under KE-19853/2013 number of works subject procedure was conducted, which resulted in the implementation process is underway. Subject of the public procurement procedure referred basement and ground-floor building is not affected districts designated work areas covered. Basement: 203.49 m2 Ground ~ ~ 102.04 m2 The exact amounts included in the annexed unpriced budget documentation. 306/2011 of the material works. Or works related to cultural monuments by government decree. (XII.23.) Of Section 15 (1).

The establishment of bus bays Bodrogkeresztúri road - the first contract modification

Tokaj Város Önkormányzat | Published November 27, 2015
Winner
BODROG BAU Építő és Szolgáltató Bt.
cpvs
45000000

The object of the procurement of the PPA. Works according to Section 7 (3). The contract: the design of bus bays Bodrogkeresztúri road Quantity: Two pairs of bus bay and the related design and construction of pedestrian crossings. More details in the documentation.

The establishment of bus bays Bodrogkeresztúri road

Tokaj Város Önkormányzat | Published November 11, 2015
Winner
Bodrog Bau Építő és Szolgáltató Bt.
cpvs
45000000

The object of the procurement of the PPA. Works according to Section 7 (3). The contract: the design of bus bays Bodrogkeresztúri road Quantity: Two pairs of bus bay and the related design and construction of pedestrian crossings. More details in the documentation.

Tokaj suburban bike path (TOP-3.5.0-09-11- "improving regional accessibility" cycle path network development) Law No. 1 contract award procedures change

Tokaj Város Önkormányzat | Published November 16, 2015
Winner
Lakmé Kft.
cpvs
45233162

Tokaj outskirts of the bike path (TOP-3.5.0-09-11- "improving regional accessibility" cycle path network development) to carry out construction and related subjects procurement process works, the attached licensee (Borsod-Abaúj-Zemplén County Government Office of Transport Inspectorate of building permits BOT / 02 / 117-6 / 2013) on the basis of the technical description, and according to the construction plan documentation accompanying unpriced budget. The project's main features: bi-directional 2x1 suburban stretch of road near Tokaj advanced road bike lanes and a length of 1,453 m.

Tokaj suburban bike path (TOP-3.5.0-09-11- "improving regional accessibility" cycle path network development) Law No. 2 contract award procedures change

Tokaj Város Önkormányzat | Published December 14, 2015
Winner
Lakmé Kft.
cpvs
45233162

Tokaj outskirts of the bike path (TOP-3.5.0-09-11- "improving regional accessibility" cycle path network development) to carry out construction and related subjects procurement process works, the attached licensee (Borsod-Abaúj-Zemplén County Government Office of Transport Inspectorate of building permits BOT / 02 / 117-6 / 2013) on the basis of the technical description, and according to the construction plan documentation accompanying unpriced budget. The project's main features: bi-directional 2x1 suburban stretch of road near Tokaj advanced road bike lanes and a length of 1,453 m.

Tokaj outskirts of the bike path (TOP-3.5.0-09-11- "improving regional accessibility" cycle path network development) subject procurement process

Tokaj Város Önkormányzat | Published September 16, 2015
Winner
Lakmé Kft.
cpvs
45233162

Tokaj outskirts of the bike path (TOP-3.5.0-09-11- "improving regional accessibility" cycle path network development) to carry out construction and related subjects procurement process works, the attached licensee (Borsod-Abaúj-Zemplén County Government Office of Transport Inspectorate of building permits BOT / 02 / 117-6 / 2013) on the basis of the technical description, and according to the construction plan documentation accompanying unpriced budget. The project's main features: bi-directional 2x1 suburban stretch of road near Tokaj advanced road bike lanes and a length of 1,453 m.

MBH Recycling and RDF power plant design concept and allows information on the preparation of the schedule subject award notice

Tokaj AltEnergia Nonprofit Kft. | Published December 16, 2015
Winner
TECHNOPLUS Környezetvédelmi és Technológiai Fejlesztő Kft.
cpvs
71220000

Achieving the objectives of the project goals is needed: • Set up required for power generation activity, operation and construction process of licensing itinerary • commencement and conduct of the individual approval procedures necessary technical-professional levels and determining the detailed definition of required documentation content • Service model fuel from waste-based energy production variants, in accordance with the (local) in terms of energy sales. The proposed feladatnak- version of the RMT in respect of feasibility - the presentation of the following areas should be covered: • the authority to produce electricity energy official permission to carry out productive activities. • required for energy production facilities to implement power industry construction permit (the electrical work, production supply, private line and direct line construction, operation, start using, to survive and to remove the building authority as authorizing specific building types of building authority permit required by this Act) • IPPC permit the use of the environment (the cogeneration plant location, planned technology should be determined on the basis of data capacity, the need for an environmental impact assessment be carried out) • Official authorization for the efficient operation of power generation and transmission facilities in operation • Energy production economy and efficiency of at least proof of payback term (approved) calculation and determination of the suppliers and consumers of conditions supporting. And • any authorization procedure, which is necessary for the proposed investment in the energy-producing RTM into its implementation and operation. The task will be to provide details of the documentation.

Tokay II. Rákóczi Primary School, Primary School of Art Energy Modernization

Tokaj Város Önkormányzat | Published October 10, 2014
Winner
Dream Way Global Kft.
cpvs
45300000

The EEOP 2014-4.10.0 / D construction "building energy combined with the development of local governments and their institutions of renewable energy sources in the region of convergence" in accordance with the requirements of the Tender Tokaji II. Rákóczi Primary School, Primary School of Art Energy Modernization: Creating Solar System: Polycrystalline solar panels: power: 250 Wp, total power: 50 KW Window Replacement 2490 m2 facade insulation 570 m2 140 m2 Plinth insulation insulation Cabinets

Modernization of Tokaj introductory trip to North City street lighting

Tokaj Város Önkormányzat | Published December 8, 2014
Winner
SAG HUNGARIA Elektrotechnikai Létesítményeket Tervező és Szerelő Kft.
cpvs
45315300

The object of the procurement of the PPA. Works in accordance with Section 7 (3). The process and the contract: Tokaj City North introductory trip to the modernization of public lighting Volume: 0.4 kV public lighting network breakdown, construction and light arms, and columns -Bodies installation. Installed power: 14x87 + 53x69 = 4875 W W be Disarmament: 10x87 = 1218 + 2x174 W power change WA: 3657 W Specifications: 0.4 kV underground cable: - Supply voltage: 0.4 kV - Power sex: three-phase current 50 Hz - Cable type wire cross section: NYY-J 4x16 mm2 - candelabra type: 8m conical steel column - Luminaires: 14 x 80-watt and 53 60-watt LED - Track Length: underground cable 544 m - Shock protection: low voltage reset hálózatnál More details in the documentation.

Tokaj Museum Tokaj under Bethlen G. út No. 7. refurbishment of part of the museum's basement conference on the development of a subject bortrezor award notice

Tokaj Város Önkormányzat | Published September 28, 2015
Winner
Múzeum Konzorcium
cpvs
45000000

World Heritage listed building standing core area - land area of ​​664,00 m2 - existing buildings gross floor area of ​​313,90m2 - built-present: 47.30% - Building height: 9.60 m, condominium renovation works are listed: Cellar: In addition to the electrical network of basement renovation will see electrical construction plan ground floor: - Replacing century wooden door - According doors and windows renovation of consignation - internal doors and windows renovation of consignation according to - existing - in addition to the purity painting of white falfelületű premises restorer supervision doorway large poor condition XX - by original wooden causal restoration of wood restorer necessary improvements in the doorway doors resulting from the demolition of plaster damage, in addition to painting restoration painting restoration vakolatleverésnél supervision of supervision - by the wooden staircase leading upstairs renovation of wood restorer. Floor: - original Baroque and XIX. Reconstruction by century joinery wood restorer - according to the exchange hall backyard window overlooking consignation - exterior and interior of existing windows and doors Renovation consignation according - White falfelületű rooms cleanliness Painting - by existing attic leading wooden staircase renovation of wood restorer - improving window in the foreground breakdowns arising from plaster and paintwork damage and by improving existing leaks and cracks restorer - by improving painted walls ablakbéleteknél wood restorer after the restoration work. Attic: - According consignation replacement of windows - the repair roofing and wood trim dyeing - purity white painting of surfaces - tile roofing replacement, roof insulation of the general: facade renovation, tinning exchange