Call +44 800 9755 164

Public tenders for construction in Tarcal Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Waste-treatment plant construction work

Abaúj-Zempléni Szilárdhulladék Gazdálkodási Önkormányzati Társulás | Published February 24, 2015
Winner
Tokaj Konzorcium
cpvs
45222100, 45213250, 45111291, 45233127, 71245000, 71326000

Within the framework of a contract for the "development of municipal solid waste management systems' performance of construction tasks are EEOP 1.1.1. / 2F / 09-11-2013-0001 the" whole building Abaúj-Zemplén Solid Waste Management System "program subject project FIDIC Red According to the book (second edition 2005 Hungarian) conditions.

Bodrog Kisfaludi museum collections, and traditional craftsmen Station - a statement issued on the subject building design and construction contract award notice

Bodrogkisfalud Község Önkormányzata | Published August 19, 2015
Winner
R+F Konzorcium
cpvs
45000000

BREAKDOWN OF EXISTING BUILDING A demolition area, the building is demolished the building to be demolished in the small northeastern land border page, 2.0-3.5 m front garden, back garden of about 4.0-5.0 m. The purpose of the building demolished buildings are not protected. The main characteristics and dimensions of the building in the west half of the building ground floor + loft, two-level high in the eastern half of the hall. Wall thickness: 50-55 cm Tight Distances: 4, 00 m height: 2, 70 m of the building materials and construction of traditional timbered roof structure built on a fafödémmel. The building of existing materials and structures (which will be fully demolished) as follows: foundation - stone strip foundation equal to the walls, pillars: - small solid brick pillars load-bearing walls - mud piled crop connective walls 50-55 cm thick slab: - lower wood-beamed ceiling and the upper side deszkázattal, stukatúr plaster roof - fafödémmel a built-empty roof cladding - ceramic grooved tile facade windows - wooden windows and doors jack: - reinforced concrete floor tinker structures: - galvanized sheet metal flashings insulation: - not be found, slab agyagtapasztás waterproofing: - floor: not found in floor coverings - PVC, concrete finishing wall coverings - looking plaster and stone installation and connector types of utilities, gas connection status and position of the boundary has not been introduced into the building. The building has two small, made of solid brick built chimney is. The building was formerly the electrical connections will be abolished. DESCRIPTION OF PLANNED WORKS The planned construction of the building destined Current Designation: residential building that will be demolished. The building is a classic permanent exhibition of local history and temporary exhibitions. The planned washrooms served by 20 women and 40 men visitors, the standard is met. Floor-plans Basement: storage room Ground floor: Entrance hall, exhibition spaces, a toilet, wash basins Attic: II. attic for storage to be built in phases and not to carry out regular administrative work. The exact quantities and the detailed technical description contained in the dossier.

N ° 1. CONTRACT MODIFICATION Bodrog Kisfaludi museum collections and traditional craftsmen Station - issuing building design and construction proposal

Bodrogkisfalud Község Önkormányzata | Published November 25, 2015
Winner
Rodia Pro Kft.;Four Road Kft
cpvs
45000000

Bodrog Kisfaludi museum collections, and traditional craftsmen Station - the development of the exhibition building ÉMOP-2.1.1 / 14-2014-0001 F-identification number of "Featured tourist attractions - development and services" as part of a project called Volume: BREAKDOWN OF EXISTING BUILDING A demolition area, to be demolished The building is to be demolished building a small site in the north eastern side of the border, 2.0-3.5 m front garden, back garden of about 4.0-5.0 m. The purpose of the building demolished buildings are not protected. The main characteristics and dimensions of the building in the west half of the building ground floor + loft, two-level high in the eastern half of the hall. Wall thickness: 50-55 cm Tight Distances: 4, 00 m height: 2, 70 m of the building materials and construction of traditional timbered roof structure built on a fafödémmel. The building of existing materials and structures (which will be fully demolished) as follows: foundation - stone strip foundation equal to the walls, pillars: - small solid brick pillars load-bearing walls - mud piled crop connective walls 50-55 cm thick slab: - lower wood-beamed ceiling and the upper side deszkázattal, stukatúr plaster roof - fafödémmel a built-empty roof cladding - ceramic grooved tile facade windows - wooden windows and doors jack: - reinforced concrete floor tinker structures: - galvanized sheet metal flashings insulation: - not be found, slab agyagtapasztás waterproofing: - floor: not found in floor coverings - PVC, concrete finishing wall coverings - looking plaster and stone installation and connector types of utilities, gas connection status and position of the boundary has not been introduced into the building. The building has two small, made of solid brick built chimney is. The building was formerly the electrical connections will be abolished. DESCRIPTION OF PLANNED WORKS The planned construction of the building destined Current Designation: residential building that will be demolished. The building is a classic permanent exhibition of local history and temporary exhibitions. The planned washrooms served by 20 women and 40 men visitors, the standard is met. Floor-plans Basement: storage room Ground floor: Entrance hall, exhibition spaces, a toilet, wash basins Attic: II. attic for storage to be built in phases and not to carry out regular administrative work. The exact quantities and the detailed technical description contained in the dossier.

CONTRACT MODIFICATION Aldo Jesus' statue environment-related construction under the ÉMOP-2.1.1. / F ID No. 14-2014-0001 project

Tarcal Község Önkormányzata | Published November 25, 2015
Winner
Szivárvány-Ép Építőipari és Szolgáltató Kft.
cpvs
45112711, 71400000, 45233200, 45233228, 35261000

„Áldó Jézus szobor környezetéhez kapcsolódó kivitelezés az ÉMOP-2.1.1/F-14-2014-0001 azonosítószámú projekt keretében” Mennyisége: A falu fölé magasodó, 176 m mBf magasságú, jellegzetesen tagolt, mesterséges felszínű dombtetejére kerül az Áldó Krisztus szobor, ami a település egyik meghatározó tájképi eleme lesz. Nyertes Ajánlattevő feladata: • a településről a szoborhoz vezető útvonalak kialakítása, • a rendezetlen, elhanyagolt felszínek rendezése, • a szobor környezetének esztétikus kialakítása • a fejlesztéshez szükséges elektromos hálózat és a közvilágítás kiépítése, • fák kitermelése - 12 db • fák fenntartása, fák metszésével - 20 db • Aszfalt burkolat gépjármű forgalomra bevágásban - 961,40 m2 • Aszfalt burkolat gépjármű forgalomra feltöltésben - 370,50 m2 • Kockakő burkolat gépjármű forgalomra bevágásban és eredeti terepszinten - 202,40 m2 • Kockakő burkolat gépjármű forgalomra feltöltésben - 78 m2 • Terméskő burkolat gyalogos forgalomra feltöltésben - 174,5 m2 • Terméskő burkolat gépjármű forgalomra feltöltésben - 20,5 m2 • Stabilizált gyepburkolat feltöltésben - 55 m2 • Szórt burkolat gyalogos forgalomra feltöltésben - 175,2 m2 • Kő szegély - 1460 m • Fém szegély - 62,1 m • Beton lépcső keresztúri kő burkolattal - 338 fm • Akácpalló lépcső - 43,2 m • Támfalépítés - 138,8 fm • Piknikasztalok elhelyezése mikroteraszokon - 4 db • Padok építése részletrajz szerint - 10 db • Lépcsőkorlát építése szoborhoz vezető lépcső két oldalán - 93 m • Térhatároló korlát építése - 65 m • Kivehető parkolásgátló oszlop - 4 db • Sziklák elhelyezése szobor talapzata körül zúzottkő ágyazatra - 30m3 • Sziklák elhelyezése térhatárolásra zúzottkő ágyazatra - 20m3 • Fa információs tábla elhelyezése, alapozással - 5 db • Fa információs tábla elhelyezése település kijelölt pontjain, alapozással - 2db • Gabion rendszerű hulladékgyűjtők terv szerinti egyedi kialakítással - 9 db • Vágott kő lámpaoszlop - 34 db • IP alapú térkamera rendszer kiépítése - 5 db kamerából álló rendszer • gyümölcsfa liget telepítése, növénybeültetés az alábbiak szerint: o 18 db díszfa o 96 db gyümölcsfa o 14 db szőlő o 1837 db lombhullató cserje o 1957 db évelő o 3120 db hagymás A pontos mennyiségeket és a részletes műszaki leírást a dokumentáció tartalmazza.

Result Information - Licensing Preparation and implementation plans Tarcal region - I-V section

Tarcal Község Önkormányzata | Published April 1, 2015
Winner
PK-TERV Kft.;PK-TERV Kft.;PK-TERV Kft.;PK-TERV Kft.;PK-TERV Kft.
cpvs
71500000

Tarcal settlements "Licensing and preparing construction plans Tarcal region - I-V Part "Government Decision 1826/2014 in order to support the functions of each municipality transfers of appropriations - headline unique identifier (XII.23.). If the performance of design tasks in relation to which the expectations and quantities are detailed below 350,562 within the framework program: the street provided stormwater drainage, as well as the necessary electrical and communications network to replace existing underground cables juice. (Licensing and construction plan preparation.) The settlement of ownership of the affected area and work on integrated task of ensuring the design is not included. II. Part One: Community Center Renovation: a survey of the existing building is needed and planned restructuring of the entire building, supplying tent roof, renovation, multi-purpose community Kieselbach makeover. (Approval of the design.) The settlement of ownership of the affected area and work on integrated task of ensuring the design is not included. III. Part One: Planning on Urban bike path next to the main road in double figures, about 3.3 km long. (Approval of the design.) The settlement of ownership of the affected area and work on integrated task of ensuring the design is not included. In doing so, asphalt carpet, padkarendezés and the drainage system renovation of planning is required. (Preparation of construction plans.) The question of ownership of land planning and integrated work on the design task of ensuring not included. Reviewed the technical condition of the existing ditches. The affected area of ​​ownership and work on integrated planning of ensuring the design task is not included. Depending on each section with respect elkészítendőek portion of the road construction, public works and construction work areas, the water rights necessary for the approval of the design.

A contract cellar underneath the Bodrogkeresztúr technical renovation of village hall, barrier-free parking in the framework of the development ÉMOP-2.1.1 / Project ID No. 14-2014-0001 F

Bodrogkeresztúr Községi Önkormányzat | Published June 10, 2015
Winner
Arm Investrade Kft.
cpvs
45000000

A contract cellar underneath the Bodrogkeresztúr technical renovation of village hall, barrier-free parking in the framework of the development ÉMOP-2.1.1 / F ID No. 14-2014-0001 project. The general contractor will design plans and related budgets itemized basis of the performance of the construction works, the mayor's office Bodrogkeresztúr southern and northern part of the renovation basement and parking lot barrier-free design, tender documents indicated below.

Bodrogkeresztúr_Ravatalozó renovation and expansion, modification of the contract

Bodrogkeresztúr Községi Önkormányzat | Published September 9, 2015
Winner
Szatmár Aqua Építőipari Fővállalkozási Korlátolt Felelősségű Társaság
cpvs
45215400, 45210000, 45453100

Subject: Lump Sum business (construction) contract - "Developing the quality of Funeral Service Bodrogkeresztúr" subject within the framework of the existing building renovation and expansion project mortuary Quantity: indoor floor space of the building's foyer expanded during the renovation. The upgrade affects the external and internal appearance, making the building more economical operation of accessibility of, and aesthetic appearance. Carried out major tasks: • existing building complete interior and exterior renovation, • central épülettestről high roof removal, with high roof covering • Flat-roofed building parts • New roof construction made of old zártszelvényből canopy in place, instead • The main entrance stairs to design accessible main entrance ramp, • barrier-free bathroom design , • Replacing the power supply and drinking water network of the building sub-parameters: • number of floors: ground floor • heights: ground-floor height of 2.55 m, 5.34 m • eaves height + 3.4 m, respectively. • ridge height 5.47 m + 4.88 m + 5.18 m, respectively. 8.45 m • roof profiles: hipped gable roof, a half gable roof, pitched roof, gable • Gross floor area: 173.2 m2 • useful area: 127.43 m2 • land area: 661 m2 • Property built of 26, 2% • mounting method: free • resistant building height: 4.25 m Winning bidders on the basis of the indicated plans regardless of the assessed value from the duty to carry out all the tasks set out in full in the Documentation. A detailed technical description included in the tender documentation and its annexes (technical documentation, specifications, construction plans, budget summaries).

Bodrogkeresztúr_Ravatalozó renovation and expansion-conference award

Bodrogkeresztúr Községi Önkormányzat | Published July 8, 2015
Winner
Szatmár Aqua Építőipari Fővállalkozási Korlátolt Felelősségű Társaság
cpvs
45215400, 45210000, 45453100

Subject: Lump Sum business (construction) contract - "quality development Bodrogkeresztúr Funeral service" within the framework of existing subjects mortuary building renovation and expansion project Amount: indoor floor space of the building's foyer expanded during the renovation. The upgrade affects the external and internal appearance, making the building more economical operation of accessibility of, and aesthetic appearance. Carried out major tasks: • existing building complete interior and exterior renovation • Central épülettestről high roof removal, with high roof covering • Flat-roofed building parts • New roof construction made of old zártszelvényből canopy in place, instead • The main entrance staircase design accessible main entrance ramp, • barrier-free bathroom design , • replacement of water mains and building part of the network parameters: • number of floors: ground floor • heights: ground-floor height of 2.55 m, 5.34 m • eaves height + 3.4 m, respectively. • ridge height 5.47 m + 4.88 m + 5.18 m, respectively. 8.45 m • roof profiles: hipped gable roof, a half gable roof, pitched roof, gable • Gross floor area: 173.2 m2 • useful area: 127.43 m2 • land area: 661 m2 • property built in: 26, 2% • mounting method: free • resistant building height: 4.25 m winning bidder on the basis of the indicated plans to independently estimate from the duty to carry out all the tasks set out in full in the Documentation. A detailed technical description included in the tender documentation and its annexes (technical documentation, specifications, construction plans, budget summaries).

2. CONTRACT MODIFICATION Bodrog Kisfaludi museum collections, and traditional craftsmen yard - building exhibition planning and design of object

Bodrogkisfalud Község Önkormányzata | Published December 7, 2015
Winner
Rodia Pro Kft.;Four Road Kft
cpvs
45000000

Bodrog Kisfaludi museum collections, and traditional craftsmen Station - the development of the exhibition building ÉMOP-2.1.1 / 14-2014-0001 F-identification number of "Featured tourist attractions - development and services" as part of a project called Volume: BREAKDOWN OF EXISTING BUILDING A demolition area, to be demolished The building is to be demolished building a small site in the north eastern side of the border, 2.0-3.5 m front garden, back garden of about 4.0-5.0 m. The purpose of the building demolished buildings are not protected. The main characteristics and dimensions of the building in the west half of the building ground floor + loft, two-level high in the eastern half of the hall. Wall thickness: 50-55 cm Tight Distances: 4, 00 m height: 2, 70 m of the building materials and construction of traditional timbered roof structure built on a fafödémmel. The building of existing materials and structures (which will be fully demolished) as follows: foundation - stone strip foundation equal to the walls, pillars: - small solid brick pillars load-bearing walls - mud piled crop connective walls 50-55 cm thick slab: - lower wood-beamed ceiling and the upper side deszkázattal, stukatúr plaster roof - fafödémmel a built-empty roof cladding - ceramic grooved tile facade windows - wooden windows and doors jack: - reinforced concrete floor tinker structures: - galvanized sheet metal flashings insulation: - not be found, slab agyagtapasztás waterproofing: - floor: not found in floor coverings - PVC, concrete finishing wall coverings - looking plaster and stone installation and connector types of utilities, gas connection status and position of the boundary has not been introduced into the building. The building has two small, made of solid brick built chimney is. The building was formerly the electrical connections will be abolished. DESCRIPTION OF PLANNED WORKS The planned construction of the building destined Current Designation: residential building that will be demolished. The building is a classic permanent exhibition of local history and temporary exhibitions. The planned washrooms served by 20 women and 40 men visitors, the standard is met. Floor-plans Basement: storage room Ground floor: Entrance hall, exhibition spaces, a toilet, wash basins Attic: II. attic for storage to be built in phases and not to carry out regular administrative work. The exact quantities and the detailed technical description contained in the dossier. Contracting draw attention to, things to equivalent megajánlása equivalence for the tenderers must demonstrate its offer.

Information on Profit-Bodrogkeresztúr, József Eötvös Elementary School Modernization

Bodrogkeresztúr Községi Önkormányzat | Published September 28, 2015
Winner
ARM Invest Trade Kft.
cpvs
45100000

Subject: Renovation of primary school technical content of the tender documentation. Quantities: Putting placement of the building, enclosing the mass does not change during upgrading. ARCHITECTURAL DESCRIPTION Placement - Place Building, overall weight is not changed during the upgrade. Major specifications of the plan on the ground floor level of the floor height ± 0.00, the outer sloping terrain varies between -0.05 and -0.40 m compared to this. The institution currently involves 161 students, the number of teachers 15. According to OTÉK calculation of required toilets are as follows: - 15 main female headcount one toilet bowl, 40 men headcount 1 wc + 1 urinal in primary schools for planning szavány (IEC 24203 -2) as follows: - 10 subsidiaries 1wc cup headcount, number of employees must be 40 boys 1 + 2 toilet urinal. Taking into account the stringent requirements of the standard, modified Plumbing female teachers and male toilet 1-1, 8 subsidiaries toilet, and 2 toilets boy is 4 urinals. The planned internal restructuring of the load-bearing structure is not affected, it can be done without a building permit. The proposed changes to the building of the central wing of the building, starting from the design of the modernization program carried out in the next modernization and expansion work: · New water block is made of the existing site, based on the calculations described in the preceding paragraph. The front roof support structure independent from the building suggest constructed so that the Government Decree 312/2012 on the construction permit procedure No.1. Pursuant to Annex also will be feasible without carrying a separate building permit procedure. The planned building renovations are in addition to those listed in the preceding paragraph shall be the central wing has carried out renovation work in the following: Instead of 2 x 70 kW will be equipped with modern and efficient gas-fired condensing boiler. • The premises falburkolatait floor and be part of the total floor area of ​​buildings to replace the breakdown of old coatings. (Where the floor level permits, and the condition of the existing pavement correct, there's the current cover is not removed. • To replace the worn interior doors modern, wooden interior doors. • Review of shock protection point of view, part of the building electrical system, and the necessary repairs, interventions must be made. (This is presumably require replacement of the vast majority of the existing power grid.) • The heating system should be redesigned completely for the current system to replace elbontásával.Az all radiator. • Perform a full field of building part the painting work. TERM STRUCTURAL DESCRIPTION (the design documentation specific structural design section is made, therefore, only be held in the building structures brief statement of) a smaller amount of ground work will be required during the landscaping as interior finishes, final landscaping levels of development of intervention is necessary. The foundation status referring to major cracks appropriate descend on the building is not detected. - Under the new building parts C10 quality concrete strip foundation under the columns basic point is made. The existing walls, small cracks are detected in some places - although sag resistance does not pose a problem - investigation and require repairs. - The new skirting the walls (in the front stairs) precast concrete formwork elements are made from, C12 quality concrete pouring. - The front roof pillars supporting beams are made of wood, 15 × 15 cm cross section. Slabs - téglaboltotzatos ceiling of the existing building, as well as béléstestes-beams and wood-beamed ceilings that are in good condition. - New ceiling is not made during the procedure. Wreaths, triggering - The middle wing 15cm thick walls kipótlásánál over the holes in them with a high element S Porotherm lintels are built duplicated. Stairs - reinforced concrete stairs at the building exterior are made. - The front stairs are made of C12 grade concrete monolith, élvédőkkel, non-slip and frost resistant ceramic coating. The roof structure is in good condition but must be inspected during construction, and the need for reinforcements to be done. The wood materials to be installed must be provided with treatment against fungal and insect pests and fire retardant treatment prior to use. BUILDING CONSTRUCTION DESCRIPTION The flue gas condensing boilers are lightweight and do not constitute a chimney. The roof should examine the potential to repair, reinforcement times

No. 1 Amendment No. EEOP a contract to 1.1.1. / 2F / 09-11-2013-0001 of "completing Abaúj-Zemplén Solid Waste Management System" in the subject

Abaúj-Zempléni Szilárdhulladék Gazdálkodási Önkormányzati Társulás | Published December 28, 2015
Winner
Tokaj Konzorcium
cpvs
45222100, 45213250, 45111291, 45233127, 71245000, 71326000

Within the framework of a contract for the "Development of municipal solid waste management systems" to perform construction tasks EEOP No. 1.1.1. / 2F / 09-11-2013-0001 of "completing Abaúj-Zemplén Solid Waste Management System" program related projects in the FIDIC Red According to the book (second edition 2005 Hungarian) the conditions detailed description of the technical conditions of the tender specifications and the requirements of the Principal III of the work to be performed. and Volume V contains. The main volumes of the works are as follows: The planned facilities include: - 110 pieces of separate collection of 85 islands settlement locations are as follows: Bodrogkeresztúr, Sátoraljaújhely, Tokaj. - 1 mechanical pretreatment (30,000 tons / year capacity) and selective sorting hall (3500 tons / year capacity) Bodrogkeresztúr - 1 car wash building Bodrogkeresztúr - 1 social-office building Bodrogkeresztúr - 1 compost 3,300 tonnes / year capacity, Bodrogkeresztúr Composting Operation: The pavement slope of 1: 1.5 inclined. The composting plant concrete cover 6330 m2. Waste sorting and mechanical handling major quantities hall • Structural design: Net area: Ground floor: - 2206.81 m2 production hall steel hair concrete floor (44.41 m2 social areas inside containers installed) - bálatároló 887.35 m2 steel concrete covering all the hair net 3,094.16 m2 Floor: Description of technology related to the waste treatment technology, the following additional facilities and activities planned: - social facilities - transport and routes - Storage and warehousing - leachate handling - cleaning gyűjtőedényzet - Development of disinfection • Selective sorting plant - feed conveyor - gun belt - sorting belt - Magnetic Separator - transferring tape Mechanical treatment plant (the processing line at least 15 t / h of input material must processing capacity to have) the mechanical preparation of the following phases are: Receiving incoming waste Place the waste shredder machine: Chop (shredding) Magnetic Separation ( sorting separation) Rostálásos Deposition (sieve) Specific Gravity (Air Screening, légszeparátor) Optical sorting (choosing PVC will be built in optical sorting) fine grinding 0-30 mm fraction Fuel tömörítőse walking floor version collection, conveyance of different materials from the storage containers. The preparation of machine bases, supply, delivery, installation, commissioning, control building, personnel training, work and fire protection contractor responsible for the education of the machines. • Road construction, retaining walls, paving the road manager of the hall surrounded by asphalt paving an area of ​​2,850 m2 • Utilities (Water Supply, Waste Water Treatment); Lightning protection; Electric energy supply; Machinery, equipment and energy supply of road lighting; Existing, converted 0.4 kV network; Existing old network with a hub makeover; Hall south-west side lighting makeover; 0.4 kV and public lighting network; Power networks; Lighting network; Electric shock protection; Road and pavement; Ditches and pools; Curbs, gutters; Leaky; Channels; Car Wash building mines supplying the gépjűrműpark grooming and maintenance tasks in accordance with Environmental regulations. The wash water is led out of the room in the middle of a grid extending gutter of the building. The connecting building between the two buildings for the workers we designed a sink for thermo-toilets. Social-office building categorized as "E, especially dirty plants' waste-processing, according to the standard. The kitchen has a rinser dishwasher, microwave connectors, respectively. Other household electrical appliances connections are built. (Coffee maker, kettle, etc.). 3 + 1 design waste yard Bodrogkeresztúr 0172/31, 1372/4 Sárospatak Tokaj 3654 (will only asset purchases), and Sátoraljaújhely 11021/28 hrsz-on. 110 pcs island developing waste collection contractor shall also contribute to the documentation as specified during trial run will be conducted by the operator. The conditional amount of documentation and usability of the draft contract will be issued as part of which will be issued during the procurement procedure details.

Purchase of Interior Mobilia Bodrogkeresztúr for Local Government under the number ÉMOP-2.1.1 / F project 14-2014-0001

Bodrogkeresztúr Községi Önkormányzat | Published July 3, 2015
Winner
Majoros és Társa Kft.
cpvs
39154000

"Obtaining Interior Mobilia Bodrogkeresztúr for Local Government under the number ÉMOP-2.1.1 / 14-2014-0001 D project 'The quantity to be purchased: - tourist information desk (180x60x80-110cm, 1.o.tölgy, varnished, chest, doors, built-in lighting, partially glazed work surface) - 1 - takeaway publications scaffolding (80x20x150cm 1.o.tölgy, varnished) - 2 - the local premiere of oak shelving products (110x40 (+10) x185cm) - 1 - local products exhibition oak shelving (70x20x80cm) - 2 - wicker basket - 1 Oak, varnished furniture - exhibition térképasztala (100x100x80cm) - 1 - glass showcase with a safety lock and internal lighting (120x60x185cm) - 4 pieces - store-specific chest of presentation (150x50x110cm) - 6 pieces - framed wall boards (70x100cm) - Visitors to 6 pieces of Exhibition Space furniture - wall shelving (175x40x80; OAK) - 2 - tables (200x100cm, oak) - 2 - stackable cushioned chairs - 21 pieces - pad (h45 + 45cm 15fm oak wall next to a built-) - 1 - Kitchen furniture (437 + 107x60x90cm, oak color varnished pine branches and door front, top shelf, patinated metal handles, foot board, built-in coolers) - 1 The furnishing is mainly an individual-style structures, mobíliákat that They include a description of the current export detailed drawings. Typically, they are made of Class 1, butt-free zemplén Oak veneer with oak, medium oak surface treatment Milesi thin glaze, hinges and wrought záruk, vintage, antique be. Production spot verification must take place prior to measurement. The glass display cases provide a unique built-in lighting, these should be discussed with the pick points during the production of electricity in the building szakkivitelezővel and director of the exhibition team. The unique construction carpentry Teams detail the exact design of the courses of study given by m = 1: 1 sample should elkészteni arches below.

Bodrogkeresztúr Municipality public buildings energy modernization. 1 no. contract modification

Bodrogkeresztúr Községi Önkormányzat | Published November 5, 2015
Winner
ARM Invest Trade Kft.
cpvs
45200000

68 (u 133) Nyitnikék under existing day-care nursery because of history, location foregoing, the planned reconstruction is not covered by the building permit process. The conversion and renovation ideas for the leaders involved in the design Bodrogkeresztúr Village Mayor's Office of leegyeztette. Planning program renovation of the building should be designed in such a way that it is more favorable to the building use and the resulting change the maximum to serve higher demand arising in connection with the operation, at the same time meet the tender "," Environment and Energy Operational Programme Kepo + 2015 + 5.7.0 Public Buildings call for priority development of energy-building "in standards. Functional design of the kindergarten hosszfalas design of streets parallel and perpendicular to the street made gabled ridge, "U" shaped single-storey building. Getting there - on foot or by car - from the Kossuth Lajos utca. The building has several entrances, there is a floor height lines of the sidewalk (+ - 0.00) compared to 30 cm higher (+0.30) made. The courtyard entrance areas about which we can get into the building through szélfogóin. The interior hallway above the open space. Basic data • Level number: downstairs Form • Roof: hipped gable roofs, "U" shaped roof topographical layout • Number of sites: 133 u. • Ground floor line: +0.30 -0.00 • + levels: Level Description of the existing pavement reconstruction planned for all obsolete and worn exterior wooden doors (with window ledges) must be replaced within the framework of the reconstruction. At the same time the base also get additional thermal insulation, as well as warming the camp ceilings also leszigeteljük. The new wall and födémrétegződéseket, as well as other points of the planned state of the art description specified. Structural description of existing state capitals in the main body of the World Cup. wreath was constructed. The walls are made of 10 cm thick. Floors: The existing building was covered with wood-beamed ceilings above the ground floor slab. 15 cm ballast made. Floor: Building interiors of laminate flooring. The roof structure was brick red clay surface cserépfedést. Windows: Type and custom-sized wooden windows and doors can be found in the building. Plasters: A load-bearing walls, partitions and wall surfaces were smoothed, plastered plaster. The existing stone facade coloring pasztelsárga slick dusty plaster, painted light gray cementsimítású legs and dyed brown-looking wood structures. Heat and water insulation: thermal insulation of the existing building is not made. Water and energy supply, heating, sewage treatment: The main power supply on the renovations to the existing central heating is not affected. Demolition and conversion work Dismantling • Surface-mounted pipeline decommissioning • Rainwater drainage channels • The tornácnál breakdown cold flooring • Concrete substrates demolish the porch • The existing pavement demolition • The Staircase partial demolition • A technically justified locations - plaster táskásodás, wall divorced renders, leázás, etc. other. - The plaster crushing • Preparation of the porch floor with preparing • Pavement concreting • Cold floors (frost-proof floor plate) porch • Water vapor or after removing the decommissioning • Plaster repair these locations • External műanyagredőnyök • Exterior doors and windows, demolition • Kava repair window replacement because of it • Plaster Repair window and door replacement place a vapor barrier existing padlásfödémnél • Plinth wall thermal insulation, surfacing • Attic Ceiling insulation of the proposed layer order according to installation • Heat-insulating-glazed wooden windows and doors (exterior doors and windows) • Installation of external műanyagredőnyök • Surface-pipe installation • External térlehatároló facade thermal insulation, coloring • External térlehatároló Installing facade thermal insulation, coloring • Rainwater drainage channels, construction of Restoration work Primer: New foundation is complete. 15 cm compacted kavicságyazat necessary. Walling: New load-bearing masonry is complete. Ceiling: New intermediate or roof slab is complete. Cover Chair: The existing roof will be converted. Shell: the roof plane existing clay tile roofing will be renovated. Insulation: The ceiling above the ground floor brackish

Bodrogkeresztúr Municipality public buildings energy modernization. 2 sz.szerződésmódosítás

Bodrogkeresztúr Községi Önkormányzat | Published November 13, 2015
Winner
ARM Invest Trade Kft.
cpvs
45200000

68 (u 133) Nyitnikék under existing day-care nursery because of history, location foregoing, the planned reconstruction is not covered by the building permit process. The conversion and renovation ideas for the leaders involved in the design Bodrogkeresztúr Village Mayor's Office of leegyeztette. Planning program renovation of the building should be designed in such a way that it is more favorable to the building use and the resulting change the maximum to serve higher demand arising in connection with the operation, at the same time meet the tender "," Environment and Energy Operational Programme Kepo + 2015 + 5.7.0 Public Buildings call for priority development of energy-building "in standards. Functional design of the kindergarten hosszfalas design of streets parallel and perpendicular to the street made gabled ridge, "U" shaped single-storey building. Getting there - on foot or by car - from the Kossuth Lajos utca. The building has several entrances, there is a floor height lines of the sidewalk (+ - 0.00) compared to 30 cm higher (+0.30) made. The courtyard entrance areas about which we can get into the building through szélfogóin. The interior hallway above the open space. Basic data • Level number: downstairs Form • Roof: hipped gable roofs, "U" shaped roof topographical layout • Number of sites: 133 u. • Ground floor line: +0.30 -0.00 • + levels: Level Description of the existing pavement reconstruction planned for all obsolete and worn exterior wooden doors (with window ledges) must be replaced within the framework of the reconstruction. At the same time the base also get additional thermal insulation, as well as warming the camp ceilings also leszigeteljük. The new wall and födémrétegződéseket, as well as other points of the planned state of the art description specified. Structural description of existing state capitals in the main body of the World Cup. wreath was constructed. The walls are made of 10 cm thick. Floors: The existing building was covered with wood-beamed ceilings above the ground floor slab. 15 cm ballast made. Floor: Building interiors of laminate flooring. The roof structure was brick red clay surface cserépfedést. Windows: Type and custom-sized wooden windows and doors can be found in the building. Plasters: A load-bearing walls, partitions and wall surfaces were smoothed, plastered plaster. The existing stone facade coloring pasztelsárga slick dusty plaster, painted light gray cementsimítású legs and dyed brown-looking wood structures. Heat and water insulation: thermal insulation of the existing building is not made. Water and energy supply, heating, sewage treatment: The main power supply on the renovations to the existing central heating is not affected. Demolition and conversion work Dismantling • Surface-mounted pipeline decommissioning • Rainwater drainage channels • The tornácnál breakdown cold flooring • Concrete substrates demolish the porch • The existing pavement demolition • The Staircase partial demolition • A technically justified locations - plaster táskásodás, wall divorced renders, leázás, etc. other. - The plaster crushing • Preparation of the porch floor with preparing • Pavement concreting • Cold floors (frost-proof floor plate) porch • Water vapor or after removing the decommissioning • Plaster repair these locations • External műanyagredőnyök • Exterior doors and windows, demolition • Kava repair window replacement because of it • Plaster Repair window and door replacement place a vapor barrier existing padlásfödémnél • Plinth wall thermal insulation, surfacing • Attic Ceiling insulation of the proposed layer order according to installation • Heat-insulating-glazed wooden windows and doors (exterior doors and windows) • Installation of external műanyagredőnyök • Surface-pipe installation • External térlehatároló facade thermal insulation, coloring • External térlehatároló Installing facade thermal insulation, coloring • Rainwater drainage channels, construction of Restoration work Primer: New foundation is complete. 15 cm compacted kavicságyazat necessary. Walling: New load-bearing masonry is complete. Ceiling: New intermediate or roof slab is complete. Cover Chair: The existing roof will be converted. Shell: the roof plane existing clay tile roofing will be renovated. Insulation: The ceiling above the ground floor brackish
  • 1