Public tenders for construction in Szentendre Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Szentendre, solar street construction road construction pótmunkáinak results

Szentendre Város Önkormányzata | Published May 29, 2015
Winner
Pilis-2003 Építőipari Korlátolt Felelősségű Társaság
cpvs
45000000

Szentendre, solar street construction road construction pótmunkáinak subject of a contract Szentendre, solar street pótmunkáinak execution of road construction along the road to the Pataksor u. and the Sun u. wooden fence boards in the corner it becomes necessary to produce a line of the fence parallel based on a retaining wall, otherwise the absence thereof, the landscaping of the fence boards come under the waist of land, which would result in szétrohadását fence.

Szentendre, gooseberry travel kindergarten construction of additional works construction craftsmanship

Szentendre Város Önkormányzata | Published November 20, 2015
Winner
ARCHIBONA Kft.
cpvs
45000000

Szentendre Gooseberry No. u.66., HRSZ.11094 four foglalkoztatós property under construction kindergarten building additional assembly work construction. The proposed building gross floor area: 1,023.74 m2 of planned building overall building height of 4.25 m was found during construction, the completion of unforeseen (the plans and the budget may have missed) extra work was necessary that this project implementation, construction of the kindergarten building are indispensable, without which this project is not feasible. These tasks include: repair is not possible, therefore lubricated seal against an inner side water pressure should be applied and the protection of an interior wall or floor coverings must be provided. The floor construction is necessary to build a 100 EPS v = 6 cm insulation, edge insulation and the placement of the remaining existing building basement cellar end closure, v = 30 cm zsalukőfal drainage plate, adapted to the terrain built peremgerendába Develop borders. The paved terraces before leaving employers structural design of complex, manual excavation of gravel filling fagykizáró, World Cup. plate base and cover design to build the assembled ceiling bracket engine mounting lower the truss mounts his, cold-rolled steel with the building lightning protection system is now agreed and approved in accordance with existing regulations regulations scheduled for the existing steel structures, steel frame Elements, steel frame reinforcement structures, bulkheads host higher structures . The structural steel frame based on the development of nodes supporting fittings, building plans prepared by the structural engineer and attached. The static design 2015 October 07, I sent a lot of points with the finished steel structural frame is further confirmation of design cards, which are primarily the skeleton of steel pillars in and truss of local nodal development of product designs, these small steel parts (diaphragms) which will be required to weld the existing structures.

Szentendre, gooseberry travel kindergarten building construction craftsmanship

Szentendre Város Önkormányzata | Published July 24, 2015
Winner
ARCHIBONA Kft.
cpvs
45000000

Szentendre Gooseberry No. u.66., Property under HRSZ.11094 four foglalkoztatós kindergarten building construction assembly construction. The planned gross floor area of ​​the building: 1,023.74 m2 of the overall structure proposed building height: 4.25 m The utilities are located on the property. The building is made of the nature of light steel frame construction mode raster-located building. A basis point is statically appropriately sized steel pillars are steel trusses. The building is made of steel outer shell painted surface vértezetes insulated panels, according to the facade design portrait and landscape design. The higher pitched roof cladding panel is made, and the flat roof structural steel plate portions invested in thermal insulation made from PVC waterproofing lágyfedéses. The building is a modern structure building physical characteristics, structural design nodes are made of leak-free and hőhíd-. The structure is made from the inside of total concealment. The interior partitions are made and the facade walls is mounted on drywall system. Accessibility affect the building's ground floor. The construction of the building construction started, but because of extraordinary termination of the construction contract for construction has not been completed, there is a 45% readiness. The previous contractor went down to the work area. The selected contractor responsible for this procurement full completion of construction. Details of the documentation.

Szentendre, gooseberry travel kindergarten building construction design modifications AF

Szentendre Város Önkormányzata | Published June 3, 2015  -  Deadline June 2, 2015
cpvs
45000000

Szentendre, gooseberry travel kindergarten building construction design engineering subjects contract for construction-assembly

Construction work

Szabadtéri Néprajzi Múzeum | Published October 17, 2017  -  Deadline November 17, 2017
cpvs
45000000, 45212313, 45233160, 77300000, 45300000, 45310000, 45330000, 45340000

Construction of the Transylvania region using the necessary original materials, with the creation of a related external area, without planning, under the framework of a business framework agreement.

The total amount of the framework agreement to be concluded is HUF 4,000,000,000.

It houses a folk monument building of 130 buildings.

5 moving water projects (streams).

internal roads asphalt 1400 m macadam 1 750 m.

fence 2 160 m.

landscape utility building water m gas 950 fm channel 1 200 fm electricity 2 400 fm + pipeline replacement according to ELMŰ not more than 2 000 fm.

On one of the city's cafes there is a café.

This is primarily due to the following aspects:

The reconstructed buildings do not have original materials,

- non-structural elements (doors, windows, etc.) have to be corrected to repair the existing original material and to replace them in partial replacement, the adhesion is allowed only when replacements are used, only the same material as the original can be used,

- the presentation of the differences in the country is a primary objective, therefore every typing must be avoided, attention must be paid to the preservation of individual details,

- requiring the use of modern crafts technologies for new materials (stiffening, wall structures, shingles, fittings, drawn joists, etc.)

- For facade (non-enclosed) surfaces, please apply local materials (stone, tiles, brick surfaces, etc.)

- Ensure adequate dryness of built-in new wood, avoid large deformation and cracking after installation.

Szentendre, gooseberry travel kindergarten building construction design contract modification

Szentendre Város Önkormányzata | Published November 13, 2015
Winner
ARCHIBONA Kft.
cpvs
45000000

Szentendre Gooseberry No. u.66., Real estate under construction building kindergarten foglalkoztatós HRSZ.11094 four-fitting design. The planned gross floor area of ​​the building: 1,023.74 m2 of the overall structure proposed building height: 4.25 m The utilities are located on the property. The building is made of lightweight design character mode raster-located steel framed building. The statically appropriately sized section steel pillar bases are steel trusses. The building is made of steel outer shell painted surface vértezetes insulated panels, according to the facade design portrait and landscape design. The higher pitched roof cladding panel is made, and the flat roof structural steel plate portions invested in thermal insulation made from PVC waterproofing lágyfedéses. The building is a modern structure building physical characteristics, structural design nodes are made of leak-free and hőhíd-. The structure is made from the inside of total concealment. The interior partitions are made and the facade walls can be mounted on drywall system. Accessibility affect the building's ground floor. The construction of the building construction started, but because of extraordinary termination of the construction contract for construction has not been completed, there is a 45% readiness. The previous contractor went down to the work area. Selected in this procurement contractor responsible for the full completion of construction. Details of the documentation.

Szentendre suburban railway underpass renewal and modernization construction contract modification

Szentendre Város Önkormányzata | Published January 25, 2016
Winner
TÉR Kivitelező Kft
cpvs
45000000

In order to achieve the appropriate homogeneous overall picture and color quality for all surface and surface samples must be presented to and approved by the designer during construction.
Details of the documentation.

construction and installation, purchase of equipment related to the implementation of the program for children with 6 Skansen

Szabadtéri Néprajzi Múzeum | Published February 8, 2016
Winner
BK Filmstúdió Kft.
cpvs
39154000, 39154100, 45262000

construction and installation, purchase of equipment related to the implementation of the program for children with 6 Skansen

construction and installation, purchase of equipment related to the implementation of the program for children Open Air Museum

Szabadtéri Néprajzi Múzeum | Published February 17, 2016
Winner
BK Filmstúdió Kft.
cpvs
39154000, 39154100, 45262000

construction and installation equipment purchases associated with implementing the program for children with 6 Skansen

Prefabricated steel structure construction 397 m2 floor area and 5 m high structure (warehouse building).

Szentendre Szabadtéri Néprajzi Múzeum Közalapítvány | Published May 22, 2015
Winner
Borzsa-Bau Kft.
cpvs
45000000

Prefabricated steel structure construction 397 m2 floor area and 5 m high structure (warehouse building).

Construction Szentendre suburban railway underpass renewal and modernization results

Szentendre Város Önkormányzata | Published November 16, 2015
Winner
TÉR Kivitelező Kft
cpvs
45000000

Szentendre suburban railway underpass renewal and modernization construction of Planning area: The planning area directly to the south side of the underpass and 2:55 m, 3:00 m north side bar. Applied Materials: Stairs, ramps: If the load carrying capability inadequate 15 cm thick new World Cup. stair structure is produced. The stairs and ramps get busy ramp surface white anti-slip coating - on the basis of advice from the manufacturer Mapei Parking System HE coating. Floor surface: The surface must be divided into visual layout of the plans. After Cost-effectiveness should be considered in terms of the current cleaning and surface preparation advice from the manufacturer on the basis of the entire surface using Mapecoat Mapei TNS Urban white. Surface sidewalk: Non-slip surface broom secure, highly wear-resistant concrete, equal to the underpass white coating of surface and color. Handrails, railings, information boards: The surfaces are fitted with anti-graffiti coating. Walls, wall coverings: The surfaces are fitted with anti-graffiti coating. On the basis of advice from Mapei company because of cracks in the surface MAPEI Elastocolor Rasante SF proposed deal with Elastocolor Net Elastocolor Pitturával and colored. Ceiling: The existing structure 100x100x3 mm hollow sections in galvanized steel electrical conduit and fixture and protective cover assembly is made. Based on preliminary discussions of the products used for side wall can be used here as well. Mapi Wallgard Anti Graffiti Barrier. Lighting: The electrical wires beneath the hollow sections, are protected from those leading. It is important to note that the original concept is that every new structure - floors, ceilings, stairs, railing ... - was the same color fehérbetonból designed two types of textures: the walking surfaces broom secure surface, non-slip, high abrasion resistance fehérbetonnal, on a vertical surface mirror-smooth surface. In order to achieve the appropriate homogeneous overall picture and color quality for all surface and surface samples must be presented to and approved by the designer during construction.

Szentendre Quail Street and the surrounding area IA. schedule for road construction and drainage; Sztaravodai road culvert profit Makeover

Szentendre Város Önkormányzata | Published February 15, 2016
cpvs
45000000

Szentendre Quail Street and the surrounding area IA. Sztaravodai rate Quail Walk up the road to the 11224/3 u-u-long section Estates road construction and drainage; Sztaravodai road culvert makeover
Sztaravodai road to the Quail Walk up to 11224/3 u-u-long section Estates road construction and drainage; Sztaravodai road culvert makeover
2 x single carriageway lane
Number of lanes: 2 * 1
Housing width of 6.00 m (2 x 3.00 m)
Stabilized berm 1.00 m wide
Sidewalk width: min. 1.50 m (with a special edge to the boundary of 2.00 m)
Distance: 0 + 139.55 - 342.66 km section between 203.11 m 0+
Roadway structure:
4 cm thick. AC 11 asphalt concrete wearing course
6 cm thick. AC 22 asphalt binder layer
20 cm thick cement stabilization signal Ckt
Min. 20 cm thick. sandy gravel layer of frost protection
Pavement Structure Course:
3 cm thick asphalt walkway marked AC 8
15 cm thick. CKT sign of stabilization with cement
Min. 15 cm thick. sandy gravel layer of frost protection
Drainage:
The quail is left of the logging system infiltration gyephézagos concrete elements built into the drainage ditch ensures becsatlakozásnál with the existing road Sztaravodai intermittent watercourse introduction. The sediments in three locations is planned hordalékfogós catching work of art.
TUBOSIDER Spire T150-1400 / 1.5 galvanized steel pipe culvert paved ditch 4-4 m long culvert on both sides
0 + 229 culverts DN 300
0 + 208.30 culvert DN 300
0 + 186.35 culvert DN 300
The Dove Street estuaries of the planned trench side of a gully hordalékfogós Develop an extension of a 15-meter D 300 KG PVC pipe enters into the open ditch Quail Street.
0 208.30 + car driver
0 + 229,00 vehicle driver

Details in the documentation.
Estimated value: 30 net HUF 150 000th

Members buds Street Nursery (2000 Szentendre, Bimbo u. 8-10.) Modernization of the energy complex construction craftsmanship

Szentendre Város Önkormányzata | Published May 27, 2015
Winner
ARCHIBONA Kft
cpvs
45000000

8-10.) Complex energy modernization of building construction contract for subjects 8-10.) The construction of complex energy modernization of building renovation aimed primarily at improved thermal insulation of the outer structure, as well as modern and innovative architectural solutions for producing renewable energy, reducing CO2 emissions by architectural, engineering and it includes electrical solutions. The upgrade affects the outer parts of the building, the interior parts - except for the electrical work - remain intact. (Plaster coverings, heating system, etc.). These succinctly: The outer walls are given additional thermal insulation, windows and doors of the existing outdated same place Subsequent heat and electricity-generating solar panels are constructed. The tin structures are renewed. Since the bridge structure remains intact, so no building permit obligation von behind. The southern facade in front of the ground floor and second-floor windows of employing 3-aisle structural shell as a so-called two-stage high. "Klímafal" is that collects solar energy in winter, all the windows in the south facade exterior aluminum blinds get blind. The western wall of the building next to the exit to the yard so-called 2x3 meters. green paneled facade is made by employers heat exchanger ventilation fans will be built in order to better ventilation. It is an aesthetic space stone instead of concrete sidewalks around the building. The north terrace on the ground floor will also get a new layer order, where water and heat insulation will be adequate. The part of the boiler room and cellar. Ensuite hőszegetelt the warehouse can get the existing windows, pierced fémajtókra the current existing, recently replaced the combustion turbo intake of fresh air from the outside due to boiler is no longer needed. Will be demolished on the west side of the building has been disused high steel chimney. The interior spaces will be replaced with luminaires using LEDs are világószerkezetei. All these construction changes do not entail authorization. Partial reconstruction - structures Solutions: Foundations of the foundation is not affected by the renovation. Vertical load-bearing structure of the existing static vertical load-bearing structures are not affected by the renovation. Here, the planned parapetfalak 25cm YTONG P4 this are the new windows it. Northern longitudinal side of the balcony below the YTONG wall with 2 steel beams I220 challenge made kiváltásról detailed description of the structural plans. The walls of the Dryvit 3cm layer remains. The basement ceiling slabs above the ground floor and are not affected by the renovation. The lintels lintels are not affected by the renovation. Wreaths wreaths does not affect the existing renovation. Partitions Partitions are not affected by the renovation. Roof of the building north-south central axis of the west, insulated floor space of the existing bituminous waterproofing central axis east of the thermal insulation of new waterproofing slope of 1% in the same direction as introduces the eaves on the east side foil sheets of rain water into the PVC waterproofing layer to glue at least 10cm inch range. The parapets will be glued to the edge of line tin foil structure. The layer thickness should not be too large, so the bottom is almost twice as polystyrene pur foam insulation thermal insulation capacity, 5cm for polystyrene and PVC slope identical to the existing slope of the roof edges dropper solution. The exception under the form of doors on the north terrace kisbelmagasságú, only accessible from the courtyard steel metal warehouse door. (See plans) The surface is powder coated in any other insulated plastic doors and windows insulated glazed-a 2 layers. (Requirements:. Uw = 1.3 W / m2K, glazing Ug = 1.0 W / m2K The outer side of the consignation anthracite colors, golden oak wood decor foil inside of the windows above the first floor staircase 70cm high with the exception of plastic windows, armrest aranytörgy dekorfóliás made. The doors and windows after behelyzésük be wrapped around the water and air tightness in order to falcsatlakozásoknál EPDM foil. coverings The new kava plaster and in the same way in wet places kerámiaburkolata, if possible, the same type of ceramic, such as the original, or your best like. The upstairs built terrace associated laminate employing parquet floor of the built-in balcony floor height of the two casing at the junction enclosure relay the floor with colored accommodate the lam. Parquet. Before needed an external base of the outer bottom wall plaster spalling repair the insulation. Exterior cladding, heat insulation Where there is an existing Dryvit 3cm, there is an exception at 10cm EPS

Vujicsics Tihamér Music School (Szentendre, Danube Promenade 16) Roof Repair and Overhaul safe escape route design and construction craftsmanship

Szentendre Város Önkormányzata | Published July 29, 2015
cpvs
45000000

Szentendre Danube Promenade No 16. The building involved rebuilding the main parameters: Land u. 1815 Installation Mode: The building consists of free-standing importance in the areas of Monuments, not monuments, Szentendre Hesed and architectural value Regulatory Plan under the Local Defence classifies the building. Building levels: basement (268.36 m2) floor (249.65 m2) 1st floor (243.72) second floor (172.9m2) layout Land area: construction plans and made part of the budget documentation Based on 1314 m2 proposals that include building and strengthening work on the renovation and replacement of the roof covering, as well as escape routes. The present proposals, as envisaged in the plans - a part - it contains the pace. These works are as follows: Note: At this rate the "dome" structure of the reconstruction is realized. After exploring the need for funds after confirmation by the fund over the relevant sections of the floor slab above the roof structure after conversion of a World Cup. It is tying drive existing wood floor structure. The above has been adjusted to the electrical and mechanical design as well.

Gooseberries Szentendre travel kindergarten AF

Szentendre Város Önkormányzata | Published May 15, 2015  -  Deadline June 2, 2015
cpvs
45000000

Szentendre, gooseberry travel kindergarten building construction design engineering subjects contract for construction-assembly

DDOP framework 2.1.1 / B-12-2012-0015 identification number of projects in Pecs Royal Serbian Orthodox Church and the Regional Centre for Religious Art Collection the renovation, expansion and construction of the chapel and bell tower - No. 1. contract modification

Budai Szerb Ortodox Egyházmegye | Published February 25, 2015
Winner
BRANAU ÉPÍTŐIPARI KFT.
cpvs
45453100, 45232151, 45262690, 45311200, 45331100, 45321000, 45422100

DDOP framework 2.1.1 / B-12-2012-0015 identification number of projects in Pecs Royal Serbian Orthodox Church and the Regional Centre for Religious Art Collection the renovation, expansion and construction of the chapel and bell tower. Quantity: The technical content of 09-9 / 4152-14 / 2012th based on the information registration number valid building permit and the construction plan documentation included. Background: The Diocese for the beginning of 2005 gave a mandate to the center of Pécs church and church art collection building design. Registration historic buildings marked the regulation does not exist, is the only archaeological site under protection. The official site of the full title deed under the Royal Serbian Diocese of property, archaeologically protected lakóház- yard and three farm building was located on it. No. 15 18 597 u. regarding property under the new chapel bell-tower building. Design tasks: The contractor responsible for carrying out the technical content provided on the basis of a valid building permit and construction plans and permits. The archaeological expertise necessary to perform the tasks prior to contractor must provide the necessary time and financial conditions, as well as for specialized tasks should be subject to archaeological institutions authorized to perform the tasks contract. A collection of exhibition space will be renovated premises of the proposed functional architecture and associated specialist mechanical and electrical safety transformations. Floor plan of the building Arche type breakdown of (Sole-Naos-pronaosz-exonartex), while the interior is shaping (archaic cabin and síkmennyezet) and external shaping (archaic Sheet-closing action-store belts) mass archaic (distributed mass and articulated cornice) is a historical quote appearance follows. The detailed technical specifications included in the detailed design architect. The gallery is also the chapel lobby level split toronyalj indoor hallways can be approached as a participant in the liturgy choir members, through the firewall steel staircase with wood paneling along the driveway. The two-storey tower covered saucer and tower room and the open belfry pronounced element of the composition. The building is a mixture of archaic and modernist design, with an emphasis displaying the orthodox elements, endeavoring to use the simple clean shapes. The facade of the chapel liturgical space typically traditional plaster wall architecture, masonry brick cornice with decorative stone and brick paneling, interior and exterior wood doors and windows.

EMI Construction Limited Liability Company for information on procurement contracting "Home warmth of programs related to software development" adopted by the outcome of Nonprofit Innovation for Quality Control

ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published September 25, 2015
Winner
Serpentarius Software Kft.
cpvs
72212517

The object of the contract: Home heat-related programs in software engineering. On one occasion, for a maximum of five key user training site. The amount of the contract: 2 module, as follows: Module 1: Reporting and reporting tasks associated with providing reports Queries: 48 and 54 / B. Reporting under § KMR (HSMS) preparation. Developing and submitting Settlement processing interface, operation of: providing portal on the possibility of submission of accounts, creating accounts processing surface replacement of household appliances, windows and doors replacement and boiler replacement scheme. Direct and indirect interfaces construction (Finance): Treasury Electra - preparation of individual and group references to export files, HST E-data integration, import Treasury extract individual and group backfill, used by Contracting source system or other kötváll, supplier bank modules export-import developing solutions in order to meet the unique dictated by the Contracting Authority, tight deadlines. Reports related commitments: commitments related to cash flow and payment-related changes in non-analytical records, query reports to ensure the possibility of appropriation of resources per year (prior to completion of the necessary reconciliation). Module 2: Financial Module: Proper controls, in order to avoid duplications building routines. (Matching Statuses required). The changes ensure that cashflow commitments without the possibility of registration. Fixing Claims management tasks associated with the system. (Integrating Year Change Setting Status required function Also: -.. To provide analytical statements relating to invitations to tender each taking inventories of preparation - Management application management system with access to external actors (experts, involvement of auditors) - commitments as well as modifications of records (appropriations ERA boiling year, the amount of the initial commitment, the date, the amount of modification of commitment, time and timing of aid disbursement application identification number and applicants master data is acknowledged, the time and the unused grant applications the financial closure of amount) - the legislation in force of public finances is compatible function - preparing the voucher card for each item, the required electronic signatures group and unique by providing - transfers and preparation of related ancillary sections (group and individual) - transfers and preparation of related ancillary sections (group and individual) - transfers and preparation of related ancillary sections (group and individual) - EFT Treatment ( group and individual) - ERA order handling - Posted in preparing accounting software for the (source system), xml export - setting up a specific commitment management in respect of certain appropriations - Management reports parametric grant opportunity maceration - the existence of Bank account verification algorithms - to achieve continuous process with each individual status management

"The Ferenczy Museum of Szentendre heating modernization construction of a heat pump system - CHOP 3.3.3-11-2011-0025 - works"

Ferenczy Múzeum | Published May 20, 2015
cpvs
45112000, 45200000, 45350000, 45331000

The Ferenczy Museum, 1052/1 hrsz.-U geothermal investment in 2000 Szentendre, Kossuth Lajos utca 5 of 69 kW heating capacity during heat pump system is designed. The system comprises: Geothermal heat pump 1; 18 pieces of vertical ground probes; Additional items (hot water tank, circulating pumps, controls, etc). geothermal heat pump is designed for medium and high temperature level is equipped with a compressor, it allows the economical application. The IVT Greenline D70 type of investment - will be applied to a heat pump - or equivalent. Probe according to their placement on the layout plan 2000 Szentendre, No. 1 Roman rampart public. , hrsz. property during 1053-U is going to happen. As indicated in the site plan 100 m deep, 150 mm diameter holes 18 pieces, each 7.0 meters in distance are made. Collector holes deepening performed hydraulic drilling equipment. The holes will be built 40x3,7 mm PE100 pipe single collector loop, which approx. Base temperature of 12 ° C using the transfer medium circulates through the loop pipeline here. The loops are surrounded by a special insulation slurry in the wellbore. The horizontal section of vertical probes bind manifold, and connected to the primary side of the heat center heat pump. The heat pump is used only for electrical power, air pollution, so the operation runs. The heat pumps are sound insulated, so noise is minimal. Provided care in the preparation of the necessary legislation for the holes drilling mud proper storage, handling, disposal of any surplus. Detailed conditions contained in the tender documents.

"Czóbel Museum Renovation"

Ferenczy Múzeum | Published October 7, 2015
Winner
KŐ-MED Építő és Díszítő Korlátolt Felelősségű Társaság
cpvs
45262690, 45310000

Contractor shall supply the Szentendre Czóbel Museum Renovation construction tasks of construction building usable area: Ground floor: 253.35 m2 basement: 44.71 m2 supply of architectural and structural discipline-specific building-construction tasks - necessary demolition work - roof and roof renovation - existing doors and windows renovation, installation of new windows - foundation reinforcement - Renovation of the yard drainage system - street entrance staircase - improving internal linings renovation of the building electrical supply industry-specific construction tasks in normal and stable power system, distribution system renovation, lighting and capping network renovation of wiring loads (lighting, heating) placing , fire alarm systems, presence detection system design of the available gross margin rate 40.000.000.- Ft. Detailed conditions contained in the tender documents.

Gardening garden renovation

Magyar Alkotóművészeti Közhasznú Nonprofit Korlátolt Felelősségű Társaság | Published October 7, 2015
Winner
Boróka Kertépítő Bt.;Boróka Kertépítő Bt.;Boróka Kertépítő Bt.
cpvs
71421000

Landscaping, Garden Renovation Part 1: Galyatetői Creative House Fence and gate construction work • Pedestrian Gate construction 60x40x3, 40x20x3, 20x20x2 iron material, 2 hinges, door handle, lock, 2 100x100x4 column csúcsdísszel 1 • Car crawlers construction of 2x2 pieces of 160 U beam, 60x40x3, 20x40x3, 20x20x2 iron material, six adjustable hinges, door stop, sliding lock, handle, lock, csúcsdísszel 1 • Fence poles construction of 100 straight, 16 double támaszos, four corner pieces, 40x40x3 ferrous material, welded nuts huzalfeszítőnek • Paint primer rust black zomácfestékkel • Fence poles welding, transport, based on tree cutting, grinding, felling • Limbing alpine technology, felling • Raking and cleaning • Twigs grinding, removal of fences demolition of demolition, construction works (new fence into the street boundary public areas bordering) • Existing fence 145, 0 m • Machine excavation to build a fence tracks, rocks, stumps picking • Hand excavation to build a fence trace 145.0 fm • Curbing tipping (100x25x8 cm natural elements) fence route of setting concrete, concrete support on 145.0 fm • Precast columns in concrete , staining of enamel paint • 8 x 150 cm plastic plated wire braid of roads feszítődróttal 145.0 fm • Escaping rubble removal of about 6.0 m3 House sidewalk, gutter, sidewalk around the stair cutting wet cutter • House • Pavement 76.0 fm foundation, concrete 5 cm thick in iron netting 92.0 m2 • 92.0 m • Pavement formwork concrete drainage ditch full of concrete construction demolition improve curb 92.0 m • Pavement kertkaputól 23.0 m2 • Footsteps • Drain concreting 6 4 Pavement, parking, barbecue • Edge works building parking and barbecue around, putting in concrete 145.0 fm • "...