Public tenders for construction in Szeged Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Szegedi Tudományegyetem | Published July 15, 2016
Winner
Ferroép Fővállalkozó és Szerelőipari Zrt.
cpvs

construction work

Construction work

Szeged Megyei Jogú Város Önkormányzata | Published September 23, 2017  -  Deadline October 4, 2017
cpvs
45000000, 45112700, 45212100, 45212200, 45212300

In the framework of a contract with a subcontracts contract, the general construction of the green building reconstruction project entitled "The development of the green city in the Liget district of Szeged, TOP-6.3.2-15-SG1-2016-00001".

Drinking-water treatment plant construction work

„Szeged-Algyő” Ivóvízminőség-javító Önkormányzati Társulás | Published July 13, 2016
cpvs

Drinking-water treatment plant construction work

Drinking-water treatment plant construction work

„Szeged-Algyő” Ivóvízminőség-javító Önkormányzati Társulás | Published May 7, 2016  -  Deadline May 19, 2016
cpvs

Drinking-water treatment plant construction work

Drinking-water treatment plant construction work

„Szeged-Algyő” Ivóvízminőség-javító Önkormányzati Társulás | Published April 7, 2016  -  Deadline May 18, 2016
cpvs

Drinking-water treatment plant construction work

Engineering design services for the construction of civil engineering works

Szeged Megyei Jogú Város Önkormányzata | Published March 24, 2016
cpvs

Engineering design services for the construction of civil engineering works

Construction work

Szeged-Csanádi Egyházmegye | Published October 4, 2017
Winner
Market Építő Zrt.
cpvs
45000000, 45110000, 45210000, 45212200, 71220000

Entrepreneurship contract for the design and implementation of the "Szeged Youth Center and additional project elements" project.

The pace is 8,000-seat stadium and the main venues in the main building

Stadium net floor area:

Serving (main) Building Facilities:

Ground floor: 1 216.84 m²

First floor: 929.48 m²

II. floor: 688.16 m²

III. floor: 192,03 m²

Server building total: 3 026.51 m²

Built in total: 1,038.57 m²

The stadium is in total: 4 065.08 m² net

Other construction parts

Lift: 2 Unobstructed 630 kg / 8 persons

2 truck lifts 1 000 kg

Guests + Press Room: 8136 people

Security staff: 40 people

The total number of people in the stadium is 8176

The MLSZ "A" or "A" a football stadium in accordance with the UEFA "CLASS" Category 4 requirements, designed to accommodate spectators with a minimum of 8,000 ft.

(with related infrastructure and road network)

Of the transverse metal supporting structures, the east and west stands are 21.50 m long, and the north and south are 14.50 m wide

B rhythm: Covered Event Center

The facilities are: sports hall, basketball court.

The ground-floor ground before the building serves as a venue for crowd events, and the service of the optional stage set up there is also the backdrop of the building: storage rooms, dressing rooms.

Gross built-in space: 1 981.84 m²

net floor area:

1 884.04 m²

First floor: 539.11 m²

II. em: 408,70 m²

total: 2 789.31 m²

Number of viewers: 78 fixed + 304 mobile = 384 people

Building height: 11.39 m.

(related infrastructure and road network)

The covered event hall main spindle spacing is 30 m.

C Rate: Existing Accommodation Building Conservation

Basic data:

Gross built-in area: 801.67 m²

Net level areas:

cellars: 514.13 m²

Ground floor: 568,03 m²

floor: 529.42 m²

floor: 529.42 m²

attic: 136,04 m²

total: 2 277.04 m²

D: Basic Renovation of an Existing Porta Building

The planned work is not a building permit.

Basic data:

Gross built-up area: 155.27 m²

Net area:

ground floor: 127.84 m²

(related infrastructure and road network)

E: Breakdown of existing buildings, utilities and roads

During demolition of asbestos-containing building structures, there is a risk that a significant amount of asbestos fibers will enter the air.

Volume of buildings to be dismantled: 11 459 lm³

G: Electricity generating and construction

No dismantling plan has been drawn up for the dismantling of unknown lines within existing boundaries within existing boundaries, which have not been in operation for decades. They have to be dismantled by the constructor when they are in the new building.

H pace: Road construction work

The traffic link of the facility is on the existing traffic link to the 5th. in the 166 + 964 km section of the national highway (Dorozsmai út) on Tűzoltó utca - south service street signal lanes node 54124 and road no. the access road to the 0 + 509 km section of the tunnel must be solved through the Dealer.

F stroke:

Centerpath grassy, ​​+ Training courses,

Center Court

Firefighter size: 105 x 68 m

Livestock covered area: 110 x 70 m

Artificial rainfall surface:

Along the line: 4.95 m

Baseline: 5.00 m

Optional Quantity: Section II.2.11.

L01 / 2012 Keretmegállap. vill.energ. design and construction of the XXIV networks. ELJ. TEE

EDF DÉMÁSZ Hálózati Elosztó Kft. | Published March 23, 2015
Winner
ELEKTROGLOB Kft.
cpvs
45231400, 71323100

. Construction works on the medium and low voltage power distribution in DEMASZ Network Ltd, owned by EDF distribution network design and construction of one work package: Work Package B: the sum of the estimated £ 400 million

Ordering the University of Szeged context of certain construction investment framework agreement procedure

Szegedi Tudományegyetem | Published January 18, 2016
Winner
Genév Kft.
cpvs
45210000

Enterprise-building contract of the University of Szeged in some building renovation-construction works of fulfillment, Acting framework agreement procedure. Estimated value of 18 months net worth HUF 400 million building construction work, which the contracting authorities may be different from + 30%. In all cases the aim jókarbantartói construction activity, which is the meaning of legislation: The term "jókarbantartó activity," the contracting 191/2009. By execution (IX.15.) Government Decree § 2 d) understand. d) jókarbantartó activities of the existing building, parts of works kármegelőzésére, kárelhárítására, maintenance, restoration, renovation, repair, making it suitable for proper and safe use and construction-assembly work for this and maintain operational safety.

Construction work for electricity power lines

EDF DÉMÁSZ Hálózati Elosztó Kft. | Published July 28, 2015  -  Deadline August 31, 2015
cpvs
71323100

EDF DÉMÁSZ execution of design and construction works on medium and low voltage electricity in Power Distribution Ltd. owned distribution networks of "A" group of products.. EDF DÉMÁSZ Network Distribution Ltd. are crucial works, planning, installation and fault elimination product group "B" . EDF DÉMÁSZ Network Distribution Ltd. at normal priority works, design, engineering and product malfunction prevention group "C" stand-alone design works.

Hódmezővásárhely, Ady E. út 14.sz. building under renovation and interior makeover, complete construction of the building's construction levels above the ground floor in respect of installation of an elevator and barrier-free.

Csongrád Megyei Kormányhivatal | Published September 25, 2015
Winner
Vad Sándor e. v.
cpvs
45100000, 45262700, 45210000, 45300000, 45313100

Below ground + 3 floors, flat-roofed building renovation and interior makeover, complete construction of the building's construction levels above the ground floor in respect of installation of an elevator and barrier-free: The 6800, Ady E. út 14. (23 Id.).

Construction work

Szeged Megyei Jogú Város Önkormányzata | Published September 26, 2017  -  Deadline October 26, 2017
cpvs
45000000, 45210000

The complex modernization of Szeged, Agyagos Street Bölcsőde (Southern Regional Methodological Bölcsőde).

Construction work

Szeged Megyei Jogú Város Önkormányzata | Published October 24, 2017  -  Deadline November 9, 2017
cpvs
45000000, 45210000

The complex modernization of Szeged, Agyagos Street Bölcsőde (Southern Regional Methodological Bölcsőde).

Construction work

Szeged Megyei Jogú Város Önkormányzata | Published November 4, 2017  -  Deadline November 13, 2017
cpvs
45000000, 45210000

The complex modernization of Szeged, Agyagos Street Bölcsőde (Southern Regional Methodological Bölcsőde).

L01 / 2012 Keretmegállap. vill.energ. design and construction of networks XXIII. ELJ. TEE

EDF DÉMÁSZ Hálózati Elosztó Kft. | Published March 2, 2015
Winner
;;Kábel Team Kft. - Kalipron Kft. konzorcium;Észak-Budai Tervező, Szerelő és Szolgáltató Zrt.;ELEKTROGLOB Kft.;ELEKTROGLOB Kft.;ELEKTROGLOB Kft.
cpvs
45231400, 71323100

EDF DEMASZ construction of medium and low voltage electrical energy owned Power Distribution Ltd. relating to the distribution network of design and construction works - seven work packages. B1 WP: The estimated £ 50 million B3 work packages: the sum of the estimated £ 50 million of C1 / 3 work packages: The estimated 7millió £ C2 / Work Package 1: The estimated £ 7millió C3 / Work Package 1: The estimated £ 7millió C3 / Work Package 3: The estimated £ 7millió C4 WP: The estimated £ 7millió

L01 / 2012 Keretmegállap. vill.energ. design and construction of networks XXI. ELJ. TEE

EDF DÉMÁSZ Hálózati Elosztó Kft. | Published November 21, 2014
Winner
JUKO Építőipari és Szolgáltató Kft.;Omexom Kft. MVM OVIT Zrt. Konzorcium;;;;ELEKTROGLOB Kft.
cpvs
45231400, 71323100

EDF DEMASZ construction of medium and low voltage electricity owned Power Distribution Ltd. relating to the distribution network of design and construction works - 9 work packages. B1 WP: The estimated £ 50 million B4 Work Package: The estimated £ 25 million a C1 / 1 WP: The estimated 7millió £ C1 / Work Package 2: The estimated £ 7millió C3 / Work Package 2: The estimated £ 7millió C4 WP: The estimated £ 7millió

Production of construction and construction plans required the licensee Dialysis Center and Department of Genetics Advisory convert the building

Szegedi Tudományegyetem | Published May 15, 2015
Winner
Duna-Tisza Ingatlanfejlesztő Kft.
cpvs
71220000

Planning (Enterprise) contract required the Department of Genetics Advisory Dialysis Centre and convert the building to prepare export plans, which include the preparation of construction plans licensee in respect of the lift. Quantity: Number of copies: Licensed plan: 3 for example. Eg 2 + electronic storage media. Unpriced budget and implementation plan: eg 5 + 2 eg electronic media. Priced budget: eg 1 + 1 electronic media for example. The contractor must take at least a weekly basis based on personally involved in the implementation plans, together with industry-specific design for each case of cooperation meetings and other tasks set within the management of the designer's own headquarters must be met to the extent necessary.

L02 / 2015/20003094 MV-LV network design, construction and eliminating trouble VII. s. TEE procedure

EDF DÉMÁSZ Hálózati Elosztó Kft. | Published December 2, 2016
Winner
DÉLVILL Kft.
cpvs
45231400

construction of medium and low voltage power distribution in EDF DÉMÁSZ Network Ltd. owned distribution networks of related design and construction works. - VII Framework contract basis. No. Procedure:
C4 WP: Independent design works

Information on the amendment of the contract, general construction contract to implement a project called "Cathedral of Szeged tourist attraction development" of works

DÓM Fejlesztő- és Turisztikai Szolgáltató Szervezet | Published November 11, 2015
Winner
"K+W Dóm" Konzorcium (Kalotherm Építőipari Zrt. és West Hungária Bau Kft.)
cpvs
45000000, 45210000, 45212314, 45212360, 45212361

General construction contract to implement the project "Development of the Cathedral of Szeged tourist attraction" works "of carrying out construction works for the subject procurement process Consideration:. 1,673,785,835, 451,922,175 HUF + VAT, EUR Total: Total: 2,125,708,010 HUF

Construction L04 / 2012 meters Local activities VI. TEE (based on keretmegállípodás)

EDF DÉMÁSZ Hálózati Elosztó Kft. | Published November 11, 2015
Winner
SMHV Kft. (név változtatás történt, korább SIMÓ Villamossági Kft.);JUKO Építőipari és Szolgáltató Kft.;SZINARON Kft;ELEKTROGLOB Kft.
cpvs
51112100

Construction of small consumer EDF DÉMÁSZ Network Distribution Ltd. Meter area of ​​local activities. Baja region's first work package 2 Békéscsaba 0.531 million HUF 0.578 HUF m 3 of WP region Kecskemét region WP 1.022 million HUF 4 million HUF 1.038 Szeged region WP