Public tenders for construction in Pocsaj Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Sewage plant access road

Pocsaj-Esztár Víziközmű Beruházási Tárulás | Published December 16, 2015
Winner
Civis-Teodolit Kft.
cpvs
45000000

Sewage plant construction access road Pocsaj large village south-west end of the Ady Endre Street, (293;. 071/4 and 071/7 u) 145.1 m length

NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar VIII. Part No. 3 contract modification

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45000000

VIII. Part One: City Council Létavértes field bus stops construction of bus station, renovation of housing, 2. utasperon urban zone, 2. utasperon outskirts, at the following locations: Létavértes, Árpád tér, bus stop, parkolósáv and sidewalk reconstruction (89 m2 of asphalt, 189 m2 of concrete, 109 m2 of concrete blocks pavement), 1110 m2 housing one layer of asphalt pavement construction equalization, Létavértes, Oradea Street, 4807th j. Vámospércs-Pocsaj s. logging road on the left side under the 19 + 078 km utasperon trenches and sidewalks access, right of the 19 + 149 km trench 22.5 m utasperon and sidewalk construction, Létavértes Exchange, Garden, outskirts, in 4807 j. Vámospércs-Pocsaj s. the left side of the 24 + 276 km trench utasperon right side of the 24 + 354 km trench utasperon by logging road construction. The subject of this public procurement is carried out directed.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar" V.rész No. 4. amendment

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45221250, 71220000, 45213315

Part V: Hajdúbagos Village area of ​​Municipality bus stops rebuilt in the following seven pieces utasperon reconstruction of four locations, 1 round of bus and bus bay construction, as follows: Hajdúbagos, leading to Hosszúpályi 4809th j. Sáránd-Létavértes s. by logging road on the right side of the 3 + 279 km utasperon trenches and construction of sidewalk access, passengers awaiting placement, Hajdúbagos, leading to Hosszúpályi 4809th j. Sáránd-Létavértes s. according to the left side of the logging road 637 km + 3, 3 + right side of the trench utasperon 703 km, connecting walkways and construction of passenger awaiting placement, Hajdúbagos, High Street, the 48,104th j. the left side by logging access road to the 0 + 658 km trench on the right side of the 0 + 712 km trench reconstruction of passenger platforms, passenger lounges in placing sidewalk access, Hajdúbagos, High Street, the 48,104th j. the left side by logging access road to the 277 km + 1, 1 + on the right side of the cross section of 366 km Reconstruction of passenger platforms, passenger lounges in placing sidewalk access, Hajdúbagos, High Street, the 48,104th j. surrounding access road 2 + 000 km section of the bus turning design, construction of bus bay, passengers awaiting disposal, road access full track expansion device 112 m2 area, turning the asphalting of a leveling layer + 400 m2 surface. The passenger lounges made of wood, Alsóregmec-made structures. The object of preparing an export plan of turning this bus procurement. For full specifications of the documentation.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar" Part X No. 1. contract modification

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321

Part X: Installing the area Mikepércs Municipality existing bus shelters 2 passengers waiting at bus stops placing the following locations: 47th c. Debrecen and Szeged right side of the main road by logging 9 + 188 km section of wooden passenger waiting placement, No. 47. 10 + on the left side under existing logging 359 km section of passengers awaiting demolition of Debrecen, Szeged's main road, a new passenger waiting placement. For full specifications of the documentation.

„ÉAOP-3.1.4./A-11-2012-0001 Értől az óceánig komplex közösségi közlekedés fejlesztése Biharban tárgyú projekt kivitelezési feladatainak ellátása” XII. rész 2. sz. szerződés módosítás

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
45000000, 44212321, 45213315, 71220000

XII. Part One: Local Government area of ​​Nagykereki as follows: The bus bay bus platform and bus turning one piece construction of bus passenger waiting platform and the development of 48,115 j. 0 + 536 kmsz design of the road on the left side, 1 bus bays in the 48,115 j. developing road on the right side kmsz 0 + 495 and 1 round and bus passengers waiting on the platform Bajcsy Zsilinszky street next to the train station. Utasperon construction: Nagykereki station: 132 pcs L-30 platform component installation, construction of 113 m2 housing Viacolor In addition to the preparation and implementation of public procurement, the present acquisition of water rights, as well as communications regulatory approvals, the construction plans. Further, it warns that the replacement of communications networks is now subject to authorization. For full specifications of the documentation.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar" VIII. Part No.4 contract modification

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45000000

VIII. Part One: City Council Létavértes field bus stops construction of bus station, renovation of housing, 2. utasperon urban zone, 2. utasperon outskirts, at the following locations: Létavértes, Árpád tér, bus stop, parkolósáv and sidewalk reconstruction (89 m2 of asphalt, 189 m2 of concrete, 109 m2 of concrete blocks pavement), 1110 m2 housing one layer of asphalt pavement construction equalization, Létavértes, Oradea Street, 4807th j. Vámospércs-Pocsaj s. logging road on the left side under the 19 + 078 km utasperon trenches and sidewalks access, right of the 19 + 149 km trench 22.5 m utasperon and sidewalk construction, Létavértes Exchange, Garden, outskirts, in 4807 j. Vámospércs-Pocsaj s. the left side of the 24 + 276 km trench utasperon right side of the 24 + 354 km trench utasperon by logging road construction. The subject of this public procurement is carried out directed.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar" IX. No. 3 sub-contract modification

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45221250

IX.rész: construction field Kismarja Municipality utasperon station 319 + 80 to 320 + 43 sections between HANTA stop utasperon construction: the left side of the track 63 meters long platform construction. 3 m at the end of the platform to ensure a level difference of 30 cm kifuttatásának, SK + 30 platform construction. Loading of stairs, filling the construction of the embankment of the consolidated utasperon execution. Guardrail construction of the entire length of the platform and the end of the maturity of the platform. Indoor waiting room appropriations bus costs 2 pieces with 2 x bus waiting to municipal road design, the Island Bus várótól street 1.5m wide pavement construction 329fm. Kismarja station Utasperon construction of the station I-II. Dodger between 66 m long platform construction, 3-3 today at the beginning and at the end of the platforms 30 cm difference in height kifuttatásának insurance, since SK + 30's platform will be implemented. Over the rail of 30 cm height of the platform will be provided along the length of 60 m. The edge of the platform II. c. vágánytól 1.55 m from the start. The subject of this public procurement is carried out directed. For full specifications of the documentation.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar 'XI. 4 Part no. contract modification

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
45213315, 44212321, 71220000, 45221250

XI. Part One: Local Government area of ​​Monostorpályi bus stops construction site one passenger awaiting placement, bus bay 2, 2 utasperon construction, development of bus turning at the following locations: Monostorpályi, Létai road 4809th j. Sáránd-Létavértes s. logging road on the right side under the 11 + 680 km of existing trenches stop at passengers waiting for placement, bicycle construction, 153.5 m2 area of ​​concrete pavement stone. Monostorpályi, Létai road 4809th j. Sáránd-Létavértes s. the left side by logging road, the 12 + 158 km trench bus bay, utasperon and 30 m footpath connections and passenger waiting building on the right side of the 12 + 236 km trench bus bay, utasperon, 28 m length of sidewalk and passenger waiting building, Monostorpályi, Petofi Square, bus turning design, 46 m2 widening overall structure of the existing pavement asphalting 332 m2 surface layer 1, the construction of bus bays and utasperon, passengers awaiting construction, Monostorpályi, Kossuth street, 48105th j. the left side by logging access road to the 0 + 974 km trench utasperon, bicycle, sidewalk connections and gateways (149 m2) Building and Construction passengers waiting on the right side of the 1 + 056 km section utasperon construction. The passenger lounges unique masonry construction. The travel Létai bus bays, bus and preparing the Petofi Square Round export plan are the subject of this procurement. For full specifications of the documentation.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar" I.rész in respect of amendment No. 3

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45221250, 71220000, 45223300, 34940000, 45213315

Part I: territory Pocsaj Municipality of 11 buses stop construction of six places, bus turning design, the following seven locations: the left side by logging Berettyoujfalu-Pocsaj road linking the 22 + 995 km trench utasperon right side of the 23 + 048 km trench utasperon relationship building and pavement, Debrecen-Biharkeresztes left side of the road connecting the 26 + 736 km section by logging bus bay and footpath connections utasperon construction, passengers awaiting placement, Vámospércs-Pocsaj s. the left side of the road 33 + 426 km section by logging utasperon and sidewalks access, right of the 33 + 348 km section utasperon construction, Vámospércs-Pocsaj s. logging road on the right side under the 32 + 438 km utasperon trenches, construction of sidewalks connection, passengers awaiting placement in the left part of the 32 + 514 km utasperon trenches and construction of sidewalk access, passengers awaiting placement, Vámospércs-Pocsaj s. the right side of the road 31 + 948 km section between utasperon as logging and construction of sidewalk access on the left side of the 31 + 779 km section utasperon construction of bus bays and passenger awaiting placement, Pocsaj, High-u and Petofi street, 537/5. ú hrsz.-way road building (427 m2 and 108 m2 of asphalt concrete pavement 165 m2, 87 m recessed edge, "K" hem 120 meters) bus stop turning and design, Vámospércs-Pocsaj s. logging road on the left side under the 30 + 637 km utasperon trenches and sidewalks access, the right side of the right side of the 30 + 509 km section of 40 m2 utasperon and sidewalk construction. In the area of ​​settlement utasvárókat wooden, made Alsóregmec be placed. Pocsaj-Esther Price railway station - the railroad tracks, published and next to be incorporated into 396 pieces L-30 reinforced concrete peronelemet - space between the peronelemek built 834 m2 Viacolor cover - the existing natural stone cladding flush installation, profiling of 1031 m2 - the former surface AC-11 j. 4 cm thick asphalt pavement construction in (41 m3) implementation plans in the streets of Debrecen and the High Street, 31 + 779 km buszöbölhöz built trenches is the subject of public procurement.

NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar I.rész second contract modification

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45221250, 71220000, 45223300, 34940000, 45213315

Part I: territory Pocsaj Municipality of 11 buses stop construction of six places, bus turning design, the following seven locations: the left side by logging Berettyoujfalu-Pocsaj road linking the 22 + 995 km trench utasperon right side of the 23 + 048 km trench utasperon relationship building and pavement, Debrecen-Biharkeresztes left side of the road connecting the 26 + 736 km section by logging bus bay and footpath connections utasperon construction, passengers awaiting placement, Vámospércs-Pocsaj s. the left side of the road 33 + 426 km section by logging utasperon and sidewalks access, right of the 33 + 348 km section utasperon construction, Vámospércs-Pocsaj s. logging road on the right side under the 32 + 438 km utasperon trenches, construction of sidewalks connection, passengers awaiting placement in the left part of the 32 + 514 km utasperon trenches and construction of sidewalk access, passengers awaiting placement, Vámospércs-Pocsaj s. the right side of the road 31 + 948 km section between utasperon as logging and construction of sidewalk access on the left side of the 31 + 779 km section utasperon construction of bus bays and passenger awaiting placement, Pocsaj, High-u and Petofi street, 537/5. ú hrsz.-way road building (427 m2 and 108 m2 of asphalt concrete pavement 165 m2, 87 m recessed edge, "K" hem 120 meters) bus stop turning and design, Vámospércs-Pocsaj s. logging road on the left side under the 30 + 637 km utasperon trenches and sidewalks access, the right side of the right side of the 30 + 509 km section of 40 m2 utasperon and sidewalk construction. In the area of ​​settlement utasvárókat wooden, made Alsóregmec be placed. Pocsaj-Esther Price railway station - the railroad tracks, published and next to be incorporated into 396 pieces L-30 reinforced concrete peronelemet - space between the peronelemek built 834 m2 Viacolor cover - the existing natural stone cladding flush installation, profiling of 1031 m2 - the former surface AC-11 j. 4 cm thick asphalt pavement construction in (41 m3) implementation plans in the streets of Debrecen and the High Street, 31 + 779 km buszöbölhöz built trenches is the subject of public procurement.

A contract -. NOGPOP 3.1.4 / A-11-2012-0001 Ocean Értől the complex development of public transport supply additional construction related projects in Bihar execution tasks corrections

Pocsaj Nagyközség Önkormányzata | Published August 24, 2015
cpvs
45221250, 34940000

. NOGPOP 3.1.4 / A-11-2012-0001 Ocean Értől the complex development of public transport, according to the additional supply of construction related projects in Bihar execution tasks as follows: Part I: Pocsaj 4808 marked 26 + 736 km road section left the site plan by the need to build additional sidewalks to maintain longitudinal fall under the standard. Build sidewalks: 40 m2 paving the planned structure and 48 m garden edging 4807 marked way 30 + 509 km section better.The (Petofi u 3) The built additional sidewalk 8 m2 and 12 meter margin 32 + 514 km with plenty of built additional pavement 23 m2 34 m Pocsaj and hem, Market u + 426 33 92 4807j left side of the pavement to be built additional 15 m2 to 18 + 348 km fm edge 33 jobb.o. The built additional pavement 15 m2 and 18 m edge of the area covered with crushed stone base uncertain origin, which falhasználható road fund as a form to an average of 10 cm thick Ckt-4 cement stabilization equalization must be the road fund established after the preliminary profiling and compacting. Asphalt must be measured before the start of the Alpine ruggedness, minimum value of 80 N / mm2 of the bus turning pavement width of 3.5 meters of 10.25 meters lekerkítő rays (axis). Develop career structure is as follows: - Existing alapprofilozás, Compression - 10 cm Ckt-balancing layer 4 - 6 cm C-16 main road fund - 5 cm C-11 graphite coating II. Part One: Kismarja be between the sidewalk and the street Island road sign constructed between 4808 bilateral garden trim width of 1.5 meters, next to the state road berm 1.5 meters followed. The 320 meter length sidewalk. The existing filling site to be constructed on the embankment widening layered hijacking after the step of, and compression (degree of compactness upper 50 cm TRQ 95%) of the prepared mirror must be constructed on the sidewalk, the following track structure. - 10 cm gravel sub-base - 15 cm Ckt cement stabilization - 4 cm asphalt wearing course AC-11 III. Part One: Létavértes Based on the attached site plan the amount of átépítetendő sidewalks will be as follows: - Before Provider house 380 m2 - behind the bus Waiting platform 46 m2 - Oradea street pavement accession of 10 m2 - Total: 436 m2 - Garden edging 15 m of sidewalks, the following path structure to be built: - floating thick (10 cm) 4 Ckt-leveling - 3 cm thick bedding finomzúzalék - 6 cm thick stone space to accommodate the rain water falling in the zone: not found, so it is necessary to solve the construction of infiltration wells. The szikkasztókutakat be designed using the following elements: - 20 cm kulékavics filter layer - 2 100/50 kútgyűrű - 1 100/60 shaft reducers - 1 water swallow up cover against the infiltration wells plugging the kulékavics filter pad fluid permeable geotextile be surrounded. IV. Part One: Monostorpályi Petofi Square bus round the track being used and turning and positioning of the platform to redesign trapped in a form that the platform was moved in front of the Mayor's Office and the lekerítő rays have been modified so that the articulated bus find out advice. The attached notice only the budget surplus quantities included. Passengers waiting to be within the scope of the local government, which contributed to the Mayor's Office, according to the minutes. Peroni phone rain shaft should be stressed levels. 4809 marked road 2.2 km 11 + 680 No Right 2.3) + 12 4809 236 km road sign on the right page 6 m2 no additional construction pavement arises.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar," a contract to No. 1. Change XII. parts with respect

Pocsaj Nagyközség Önkormányzata | Published August 7, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
45000000, 44212321, 45213315, 71220000

XII. Part One: Local Government area of ​​Nagykereki as follows: The bus bay bus platform and bus turning one piece construction of bus passenger waiting platform and the development of 48,115 j. 0 + 536 kmsz developing road on the left side, 1 bus bays in the 48,115 j. developing road on the right side kmsz 0 + 495 and 1 bus passenger waiting platform and turning the Bajcsy Zsilinszky street next to the train station. Utasperon construction: Nagykereki station: 132 pcs L-30 platform installation of batteries, construction of 113 m2 housing Viacolor In addition to this procurement subject to the preparation and execution of the purchase of water rights, as well as communications regulatory approvals, the construction plans. Further, it warns that the replacement of communications networks is now subject to authorization. For full specifications of the documentation.

No. 3 authors. Amendment Pocsaj - Bihar Félegyháza road connecting (Hungary section) to carry out road construction and storm water drainage works

Pocsaj Nagyközség Önkormányzata | Published August 5, 2015
Winner
Nagymester Mélyépítési, Útépítési és Szállítmányozási Kft.
cpvs
45200000

Pocsaj - Bihar Félegyháza link road (Hungary section) execution of road construction and storm water drainage works Main data of the project: Municipal road 5437 m length, 6.00 m wide road surface construction of the proposed road 1 + 571.15 km section of the Core-Main Canal crossing of 24, 00 m clear span bridge for road construction related to the solution drainage on both sides of the road ditch system, moving lighting fixtures based on the design specifications to a separate branch on the basis of design documentation; To perform the necessary work on the construction plans and permits are available. More detailed descriptions contained in the documentation

"Elderly complex home renovation, expansion Esther Gazette" [Project ID: SIOP-3.4.2-11 / 1-2012-0048]

Esztári Református Egyházközség | Published June 12, 2015
Winner
Humán-Ép Ingatlanforgalmazó Kft.
cpvs
45215210

"Elderly complex home renovation, expansion Esther Gazette" [Project ID: SIOP-3.4.2-11 / 1-2012-0048] procurement procedure without notice in the subject documentation (hereinafter: Documentation), according to which, a total of 615.98 m2 useful floor space will be built; the traditional structure, single-storey existing building complex renovation and expansion of the main labor currencies are as follows: o foundation o load-bearing and envelope masonry construction, p slabs, lintels and triggers, partitions, ceilings construction, p roof construction, p sheet metal works, o insulation, o exterior and interior plastering, placing o external and internal doors and windows, P. hot and cold coatings prepare, o painting work, complex building o electric power network, o low-voltage system building (computer, phone, TV), p lightning protection system construction, p establishment and conduct of the approval process, p-channel external and internal water system building, central heating and gas o installation work, o develop internal wiring road parking, outside space and o Preparation of pavement tiles solar system.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar 'No. 2 Contract amendment XIII. parts with respect

Pocsaj Nagyközség Önkormányzata | Published May 29, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45221250

XIII. Part One: Local Government area of ​​Sáránd as follows: 3 bus bay construction, 2-way exchange of waiting following 3 locations: Sáránd, Bagosi streets of New 4809th. Sáránd-Létavértes s. 0 + right side of the road and left of the 0 + 992 km section bus bay, utasperon construction, passengers awaiting placement, sidewalk construction joints, Sáránd, High Street No. 69 by logging 962 km section. in front of bus bays and utasperon, sidewalk construction connection, passengers awaiting placement Sáránd, Debrecen Street, No. 47. Debrecen and Szeged on the right side of the main road 13 + 171 km section by logging, the existing bus stops passenger lounges breakdown of the 13 + 284 km section on the left side, place a new cover new passenger lounges. The passenger lounges made of wood, Alsóregmec-made structures. Utasperon construction: Sáránd station: 264 L-30 platform incorporating elements, construction of 225 m2 Viacolor Jacket 3. Subject preparation bus bay also export this procurement plan. For full specifications of the documentation.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar" IX. No. 2 sub-contract. mode

Pocsaj Nagyközség Önkormányzata | Published May 29, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
45221250, 44212321

IX. section: construction field Kismarja Municipality utasperon station 319 + 80 to 320 + 43 sections between HANTA stop utasperon construction: on the left side of the track 63 meters long platform construction. 3 m at the end of the platform to ensure a level difference of 30 cm kifuttatásának, SK + 30 platform construction. Loading of stairs, filling construction, the consolidated utasperon the embankment construction. Guardrail construction of the entire length of the platform and the end of the maturity of the platform. Indoor waiting room with 2 bus cost appropriation, with 2 bus waiting next to municipal road design, the Island Bus várótól street 1.5m wide pavement construction 329fm. Kismarja station Utasperon construction of the station I-II. Dodger between 66 m platform construction, 3-3 today at the beginning and at the end of the platforms 30 cm difference in height kifuttatásának insurance, since SK + 30's platform will be implemented. Over the rail of 30 cm height of the platform will be provided along the length of 60 m. The edge of the platform II. c. vágánytól 1.55 m from the start. The subject of this public procurement is carried out directed. For full specifications of the documentation.

A contract to No.1. Changing IX. parts with respect

Pocsaj Nagyközség Önkormányzata | Published May 29, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45221250

IX. section: construction field Kismarja Municipality utasperon station 319 + 80 to 320 + 43 sections between HANTA stop utasperon construction: on the left side of the track 63 meters long platform construction. 3 m at the end of the platform to ensure a level difference of 30 cm kifuttatásának, SK + 30 platform construction. Loading of stairs, filling construction, the consolidated utasperon the embankment construction. Guardrail construction of the entire length of the platform and the end of the maturity of the platform. Indoor waiting room with 2 bus cost appropriation, with 2 bus waiting next to municipal road design, the Island Bus várótól street 1.5m wide pavement construction 329fm. Kismarja station Utasperon construction of the station I-II. Dodger between 66 m platform construction, 3-3 today at the beginning and at the end of the platforms 30 cm difference in height kifuttatásának insurance, since SK + 30's platform will be implemented. Over the rail of 30 cm height of the platform will be provided along the length of 60 m. The edge of the platform II. c. vágánytól 1.55 m from the start. The subject of this public procurement is carried out directed. For full specifications of the documentation.

A contract to No. 4. Changing the IP. Part respect

Pocsaj Nagyközség Önkormányzata | Published February 20, 2015
Winner
Debreceni Építő, Szolgáltató és Kereskedelmi Zrt.
cpvs
44212321, 45221250, 71220000

VI. Part One: design implementation Hencida municipality Municipality bus bays 5 bays on the following three locations: Hencida Csokonai street, in the 4812 j. Berettyoujfalu - Pocsaj road connecting the inner section of the road on the left and the right environment 14 + 000 km section of the logging, the Red Army Street, the 4813th j. Hencida-Nagykereki road connecting the inner section of road around the 0 + 916 km section of the left and right sides of the logging, the Kossuth Street, the 4813th j. 0 + 920 km road environment logging left side of the logging. In addition to the bus bay design to make the existing open pits closed by this project will be implemented. In addition to the design, the present procurement and installation of water rights permit the preparation of the construction plans. The detailed technical specification documentation.

A contract to No. 3. Changing the IP. Part respect

Pocsaj Nagyközség Önkormányzata | Published February 20, 2015
Winner
Debreceni Építő, Szolgáltató és Kereskedelmi Zrt.
cpvs
44212321, 45221250, 71220000

VI. Part One: design implementation Hencida municipality Municipality bus bays 5 bays on the following three locations: Hencida Csokonai street, in the 4812 j. Berettyoujfalu - Pocsaj road connecting the inner section of the road on the left and the right environment 14 + 000 km section of the logging, the Red Army Street, the 4813th j. Hencida-Nagykereki road connecting the inner section of road around the 0 + 916 km section of the left and right sides of the logging, the Kossuth Street, the 4813th j. 0 + 920 km road environment logging left side of the logging. In addition to the bus bay design to make the existing open pits closed by this project will be implemented. In addition to the design, the present procurement and installation of water rights permit the preparation of the construction plans. The detailed specifications of the documentation.

No. 1 Part 3 of a contract amendment with respect

Pocsaj Nagyközség Önkormányzata | Published February 20, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Kft
cpvs
45213315, 44212321, 71220000, 45221250

III. parts: construction field Derecske Municipality utasperon as follows: Derecske station: 132 pcs L Installation 30 platform elements, construction of 113 m2 Viacolor housing Derecske Marketplace stop at 132 pcs L Installation 30 platform elements, construction of 113 m2 Viacolor housing The detailed technical specification documentation.