Call +44 800 9755 164

Public tenders for construction in Pocsaj Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

No. 3 authors. Amendment Pocsaj - Bihar Félegyháza road connecting (Hungary section) to carry out road construction and storm water drainage works

Pocsaj Nagyközség Önkormányzata | Published August 5, 2015
Winner
Nagymester Mélyépítési, Útépítési és Szállítmányozási Kft.
cpvs
45200000

Pocsaj - Bihar Félegyháza link road (Hungary section) execution of road construction and storm water drainage works Main data of the project: Municipal road 5437 m length, 6.00 m wide road surface construction of the proposed road 1 + 571.15 km section of the Core-Main Canal crossing of 24, 00 m clear span bridge for road construction related to the solution drainage on both sides of the road ditch system, moving lighting fixtures based on the design specifications to a separate branch on the basis of design documentation; To perform the necessary work on the construction plans and permits are available. More detailed descriptions contained in the documentation

No. 2 authors. Amendment Pocsaj - Bihar Félegyháza link road (Hungarian section) to carry out road construction and storm water drainage works

Pocsaj Nagyközség Önkormányzata | Published January 12, 2015
Winner
Nagymester Mélyépítési, Útépítési és Szállítmányozási Kft.
cpvs
45200000

Pocsaj - Bihar Félegyháza link road (Hungarian section) to carry out road construction and storm water drainage works Main data of the project: Municipal road 5437 m length, 6.00 m wide pavement construction of the planned route 1 + 571.15 km section of the Core Main Channel crossing in 24, 00 m clear span bridge on road construction drainage solution, both sides of the road ditch system, moving lighting fixtures based on the design specifications to a separate branch on the basis of design documentation; To perform the work required for the construction plans and permits are available. More detailed descriptions of the documentation contains

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar" IX. No. 2 sub-contract. mode

Pocsaj Nagyközség Önkormányzata | Published May 29, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
45221250, 44212321

IX. section: construction field Kismarja Municipality utasperon station 319 + 80 to 320 + 43 sections between HANTA stop utasperon construction: on the left side of the track 63 meters long platform construction. 3 m at the end of the platform to ensure a level difference of 30 cm kifuttatásának, SK + 30 platform construction. Loading of stairs, filling construction, the consolidated utasperon the embankment construction. Guardrail construction of the entire length of the platform and the end of the maturity of the platform. Indoor waiting room with 2 bus cost appropriation, with 2 bus waiting next to municipal road design, the Island Bus várótól street 1.5m wide pavement construction 329fm. Kismarja station Utasperon construction of the station I-II. Dodger between 66 m platform construction, 3-3 today at the beginning and at the end of the platforms 30 cm difference in height kifuttatásának insurance, since SK + 30's platform will be implemented. Over the rail of 30 cm height of the platform will be provided along the length of 60 m. The edge of the platform II. c. vágánytól 1.55 m from the start. The subject of this public procurement is carried out directed. For full specifications of the documentation.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar" IX. No. 3 sub-contract modification

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45221250

IX.rész: construction field Kismarja Municipality utasperon station 319 + 80 to 320 + 43 sections between HANTA stop utasperon construction: the left side of the track 63 meters long platform construction. 3 m at the end of the platform to ensure a level difference of 30 cm kifuttatásának, SK + 30 platform construction. Loading of stairs, filling the construction of the embankment of the consolidated utasperon execution. Guardrail construction of the entire length of the platform and the end of the maturity of the platform. Indoor waiting room appropriations bus costs 2 pieces with 2 x bus waiting to municipal road design, the Island Bus várótól street 1.5m wide pavement construction 329fm. Kismarja station Utasperon construction of the station I-II. Dodger between 66 m long platform construction, 3-3 today at the beginning and at the end of the platforms 30 cm difference in height kifuttatásának insurance, since SK + 30's platform will be implemented. Over the rail of 30 cm height of the platform will be provided along the length of 60 m. The edge of the platform II. c. vágánytól 1.55 m from the start. The subject of this public procurement is carried out directed. For full specifications of the documentation.

Work contract - Craft House and exhibition hall construction (HURO 1101/058 / 2.1.3) III. c. amendment

Gyermekeinkért Alapítvány | Published February 6, 2015
Winner
Civis-Bau Kft.
cpvs
45210000

Building renovation and development of infrastructure as follows: Crafts House: Building a traditional masonry construction system. Building the Open Air operated, but the present state of neglect. Job restructuring and renovation of buildings at the same time for a craft activity in the building. Taken into account during the design of the building structure of the holding. Was placed in a craft workshop, an exhibition space, where the distribution made, as well as a social unit. Basic information on the property: area: 2,840.00 m2 Bocskai house built craft area :: 82.96 m2 Built area: 843.53 m2 The property is built in: the size of 29.70% 1446.08 m2 of green areas (50.91% ) Exhibition Hall: The building traditional masonry construction system. The building operated as a granary, but currently neglected. Our job is also a transformation of agricultural activities and presenting an exhibition hall renovation of the building. The building was converted to static system of steel-framed structure pillar. On the ground floor is placed in a reception and exhibit space. Upstairs is an exhibition hall and an office block and social. The floor disabled access approach and developed a new elevator and a staircase arm. Basic information on the property: area: 2,840.00 m2 exhibition hall built Bocskai area :: 199.83 m2 Built area: 843.53 m2 Land built in: the size of 29.70% 1446.08 m2 of green areas (50.91%) The detailed specifications of the documentation.

Work contract -. NOGPOP 3.1.4 / A-11-2012-0001 Értől the ocean complex public transport supply additional construction investment projects in Bihar subject construction tasks

Pocsaj Nagyközség Önkormányzata | Published December 12, 2014
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság;MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság;MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság;MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
45221250, 34940000

. NOGPOP 3.1.4 / A-11-2012-0001 Ocean Értől the complex development of public transport according to supply additional construction investment projects in Bihar subject construction tasks as follows: Part I: Pocsaj 4808 marked 26 + 736 km road section left the site plan by the need to build additional sidewalks to maintain longitudinal fall under the standard. Build a sidewalk: 40 m2 paving the proposed structure, and 48-meter garden edging 4807 marked road 30 + 509 km section better.The (Petofi u 3) to be constructed additional sidewalk 8 m2 and 12 meter margin 32 + 514 km with plenty of built additional pavement 23 m2 and 34 m Pocsaj hem, 92 Market street 4807j 33 + 426 left the pavement constructed additional 15 m2 and 18 m + 33 348 km border jobb.o. The built additional pavement 15 m2 and 18 meter edge of the area covered with crushed stone base uncertain origin, which falhasználható road as a basis, in a format that averages 10 cm thick CKt four cement stabilization settlement to be on the road fund established after preliminary profiling and compression. Asphalt must be measured before the start of the Alps load capacity, minimum value of 80 N / mm2 bus round casing width of 3.5 meters to 10.25 meters lekerkítő rays (axis). Develop career structure is as follows: - Existing alapprofilozás, compression - 10 cm Ckt-balancing layer 4 - 6 cm C-16 main road fund - 5 cm layer of AC-11 Hound II. Part One: Kismarja be between the sidewalk and the street Island road constructed between 4808 marked bilateral garden edgings 1.5 meters wide, next to the state road berm 1.5 meters followed. The pavement length of 320 m. The existing embankment side shall be built in charging widening layered hijacking after stepping of, and compression (degree of compactness upper 50 cm TRQ 95%) thus prepared the mirror to be constructed in the sidewalk, the following course structure. - 10 cm gravel sub-base - 15cm CKt cement stabilization - 4 cm AC-11 asphalt wearing course III. Part One: Létavértes Based on the attached site plan the amount of átépítetendő sidewalks will be as follows: - Before Provider house 380 m2 - behind the bus Waiting platform 46 m2 - Oradea street pavement joining 10 m2 - Total: 436 m2 - Garden edging 15 m of sidewalks in the following course structure to be built - changing thick (10 cm) 4 CKt compensation - 3 cm thick bedding finomzúzalék - 6 cm thick stone space to accommodate the rainfall area near the water can not be found, so it is necessary to solve the construction of infiltration wells. The szikkasztókutakat be constructed using the following elements: - kulékavics filter layer 20 cm - 2 kútgyűrű 100/50 - 100/60 shaft reducer 1 - 1 water swallow the cover against the infiltration wells kulékavics plugging the filter pad fluid permeable geotextile be surrounded. IV. Part One: Monostorpályi Petofi Square bus round the track being used and turning and positioning of the platform redesign pushed in a form that the platform was moved to the Mayor's Office and the lekerítő rays have been modified so that the articulated bus find out advice. The attached notice only the budget in surplus quantities. Passengers waiting to be within the scope of the local government, according to the Mayor's Office contributed to the Protocol. Peroni rain shaft should be increased to a level phone. 4809 marked road 2.2 km 11 + 680 No Right 2.3) + 12 4809 236 km road sign no right 6 m2 additional sidewalk construction arises.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar" I.rész in respect of amendment No. 3

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45221250, 71220000, 45223300, 34940000, 45213315

Part I: territory Pocsaj Municipality of 11 buses stop construction of six places, bus turning design, the following seven locations: the left side by logging Berettyoujfalu-Pocsaj road linking the 22 + 995 km trench utasperon right side of the 23 + 048 km trench utasperon relationship building and pavement, Debrecen-Biharkeresztes left side of the road connecting the 26 + 736 km section by logging bus bay and footpath connections utasperon construction, passengers awaiting placement, Vámospércs-Pocsaj s. the left side of the road 33 + 426 km section by logging utasperon and sidewalks access, right of the 33 + 348 km section utasperon construction, Vámospércs-Pocsaj s. logging road on the right side under the 32 + 438 km utasperon trenches, construction of sidewalks connection, passengers awaiting placement in the left part of the 32 + 514 km utasperon trenches and construction of sidewalk access, passengers awaiting placement, Vámospércs-Pocsaj s. the right side of the road 31 + 948 km section between utasperon as logging and construction of sidewalk access on the left side of the 31 + 779 km section utasperon construction of bus bays and passenger awaiting placement, Pocsaj, High-u and Petofi street, 537/5. ú hrsz.-way road building (427 m2 and 108 m2 of asphalt concrete pavement 165 m2, 87 m recessed edge, "K" hem 120 meters) bus stop turning and design, Vámospércs-Pocsaj s. logging road on the left side under the 30 + 637 km utasperon trenches and sidewalks access, the right side of the right side of the 30 + 509 km section of 40 m2 utasperon and sidewalk construction. In the area of ​​settlement utasvárókat wooden, made Alsóregmec be placed. Pocsaj-Esther Price railway station - the railroad tracks, published and next to be incorporated into 396 pieces L-30 reinforced concrete peronelemet - space between the peronelemek built 834 m2 Viacolor cover - the existing natural stone cladding flush installation, profiling of 1031 m2 - the former surface AC-11 j. 4 cm thick asphalt pavement construction in (41 m3) implementation plans in the streets of Debrecen and the High Street, 31 + 779 km buszöbölhöz built trenches is the subject of public procurement.

NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar I.rész second contract modification

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45221250, 71220000, 45223300, 34940000, 45213315

Part I: territory Pocsaj Municipality of 11 buses stop construction of six places, bus turning design, the following seven locations: the left side by logging Berettyoujfalu-Pocsaj road linking the 22 + 995 km trench utasperon right side of the 23 + 048 km trench utasperon relationship building and pavement, Debrecen-Biharkeresztes left side of the road connecting the 26 + 736 km section by logging bus bay and footpath connections utasperon construction, passengers awaiting placement, Vámospércs-Pocsaj s. the left side of the road 33 + 426 km section by logging utasperon and sidewalks access, right of the 33 + 348 km section utasperon construction, Vámospércs-Pocsaj s. logging road on the right side under the 32 + 438 km utasperon trenches, construction of sidewalks connection, passengers awaiting placement in the left part of the 32 + 514 km utasperon trenches and construction of sidewalk access, passengers awaiting placement, Vámospércs-Pocsaj s. the right side of the road 31 + 948 km section between utasperon as logging and construction of sidewalk access on the left side of the 31 + 779 km section utasperon construction of bus bays and passenger awaiting placement, Pocsaj, High-u and Petofi street, 537/5. ú hrsz.-way road building (427 m2 and 108 m2 of asphalt concrete pavement 165 m2, 87 m recessed edge, "K" hem 120 meters) bus stop turning and design, Vámospércs-Pocsaj s. logging road on the left side under the 30 + 637 km utasperon trenches and sidewalks access, the right side of the right side of the 30 + 509 km section of 40 m2 utasperon and sidewalk construction. In the area of ​​settlement utasvárókat wooden, made Alsóregmec be placed. Pocsaj-Esther Price railway station - the railroad tracks, published and next to be incorporated into 396 pieces L-30 reinforced concrete peronelemet - space between the peronelemek built 834 m2 Viacolor cover - the existing natural stone cladding flush installation, profiling of 1031 m2 - the former surface AC-11 j. 4 cm thick asphalt pavement construction in (41 m3) implementation plans in the streets of Debrecen and the High Street, 31 + 779 km buszöbölhöz built trenches is the subject of public procurement.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar 'No. 2 Contract amendment XIII. parts with respect

Pocsaj Nagyközség Önkormányzata | Published May 29, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45221250

XIII. Part One: Local Government area of ​​Sáránd as follows: 3 bus bay construction, 2-way exchange of waiting following 3 locations: Sáránd, Bagosi streets of New 4809th. Sáránd-Létavértes s. 0 + right side of the road and left of the 0 + 992 km section bus bay, utasperon construction, passengers awaiting placement, sidewalk construction joints, Sáránd, High Street No. 69 by logging 962 km section. in front of bus bays and utasperon, sidewalk construction connection, passengers awaiting placement Sáránd, Debrecen Street, No. 47. Debrecen and Szeged on the right side of the main road 13 + 171 km section by logging, the existing bus stops passenger lounges breakdown of the 13 + 284 km section on the left side, place a new cover new passenger lounges. The passenger lounges made of wood, Alsóregmec-made structures. Utasperon construction: Sáránd station: 264 L-30 platform incorporating elements, construction of 225 m2 Viacolor Jacket 3. Subject preparation bus bay also export this procurement plan. For full specifications of the documentation.

NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar VIII. Part No. 3 contract modification

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45000000

VIII. Part One: City Council Létavértes field bus stops construction of bus station, renovation of housing, 2. utasperon urban zone, 2. utasperon outskirts, at the following locations: Létavértes, Árpád tér, bus stop, parkolósáv and sidewalk reconstruction (89 m2 of asphalt, 189 m2 of concrete, 109 m2 of concrete blocks pavement), 1110 m2 housing one layer of asphalt pavement construction equalization, Létavértes, Oradea Street, 4807th j. Vámospércs-Pocsaj s. logging road on the left side under the 19 + 078 km utasperon trenches and sidewalks access, right of the 19 + 149 km trench 22.5 m utasperon and sidewalk construction, Létavértes Exchange, Garden, outskirts, in 4807 j. Vámospércs-Pocsaj s. the left side of the 24 + 276 km trench utasperon right side of the 24 + 354 km trench utasperon by logging road construction. The subject of this public procurement is carried out directed.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar" VIII. Part No.4 contract modification

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45000000

VIII. Part One: City Council Létavértes field bus stops construction of bus station, renovation of housing, 2. utasperon urban zone, 2. utasperon outskirts, at the following locations: Létavértes, Árpád tér, bus stop, parkolósáv and sidewalk reconstruction (89 m2 of asphalt, 189 m2 of concrete, 109 m2 of concrete blocks pavement), 1110 m2 housing one layer of asphalt pavement construction equalization, Létavértes, Oradea Street, 4807th j. Vámospércs-Pocsaj s. logging road on the left side under the 19 + 078 km utasperon trenches and sidewalks access, right of the 19 + 149 km trench 22.5 m utasperon and sidewalk construction, Létavértes Exchange, Garden, outskirts, in 4807 j. Vámospércs-Pocsaj s. the left side of the 24 + 276 km trench utasperon right side of the 24 + 354 km trench utasperon by logging road construction. The subject of this public procurement is carried out directed.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar," a contract to No. 1. Change XII. parts with respect

Pocsaj Nagyközség Önkormányzata | Published August 7, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
45000000, 44212321, 45213315, 71220000

XII. Part One: Local Government area of ​​Nagykereki as follows: The bus bay bus platform and bus turning one piece construction of bus passenger waiting platform and the development of 48,115 j. 0 + 536 kmsz developing road on the left side, 1 bus bays in the 48,115 j. developing road on the right side kmsz 0 + 495 and 1 bus passenger waiting platform and turning the Bajcsy Zsilinszky street next to the train station. Utasperon construction: Nagykereki station: 132 pcs L-30 platform installation of batteries, construction of 113 m2 housing Viacolor In addition to this procurement subject to the preparation and execution of the purchase of water rights, as well as communications regulatory approvals, the construction plans. Further, it warns that the replacement of communications networks is now subject to authorization. For full specifications of the documentation.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar 'XI. 4 Part no. contract modification

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
45213315, 44212321, 71220000, 45221250

XI. Part One: Local Government area of ​​Monostorpályi bus stops construction site one passenger awaiting placement, bus bay 2, 2 utasperon construction, development of bus turning at the following locations: Monostorpályi, Létai road 4809th j. Sáránd-Létavértes s. logging road on the right side under the 11 + 680 km of existing trenches stop at passengers waiting for placement, bicycle construction, 153.5 m2 area of ​​concrete pavement stone. Monostorpályi, Létai road 4809th j. Sáránd-Létavértes s. the left side by logging road, the 12 + 158 km trench bus bay, utasperon and 30 m footpath connections and passenger waiting building on the right side of the 12 + 236 km trench bus bay, utasperon, 28 m length of sidewalk and passenger waiting building, Monostorpályi, Petofi Square, bus turning design, 46 m2 widening overall structure of the existing pavement asphalting 332 m2 surface layer 1, the construction of bus bays and utasperon, passengers awaiting construction, Monostorpályi, Kossuth street, 48105th j. the left side by logging access road to the 0 + 974 km trench utasperon, bicycle, sidewalk connections and gateways (149 m2) Building and Construction passengers waiting on the right side of the 1 + 056 km section utasperon construction. The passenger lounges unique masonry construction. The travel Létai bus bays, bus and preparing the Petofi Square Round export plan are the subject of this procurement. For full specifications of the documentation.

"NOGPOP 3.1.4. / A-11-2012-0001 Ocean Értől the public transport supply complex construction tasks related projects in Bihar" V.rész No. 4. amendment

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45221250, 71220000, 45213315

Part V: Hajdúbagos Village area of ​​Municipality bus stops rebuilt in the following seven pieces utasperon reconstruction of four locations, 1 round of bus and bus bay construction, as follows: Hajdúbagos, leading to Hosszúpályi 4809th j. Sáránd-Létavértes s. by logging road on the right side of the 3 + 279 km utasperon trenches and construction of sidewalk access, passengers awaiting placement, Hajdúbagos, leading to Hosszúpályi 4809th j. Sáránd-Létavértes s. according to the left side of the logging road 637 km + 3, 3 + right side of the trench utasperon 703 km, connecting walkways and construction of passenger awaiting placement, Hajdúbagos, High Street, the 48,104th j. the left side by logging access road to the 0 + 658 km trench on the right side of the 0 + 712 km trench reconstruction of passenger platforms, passenger lounges in placing sidewalk access, Hajdúbagos, High Street, the 48,104th j. the left side by logging access road to the 277 km + 1, 1 + on the right side of the cross section of 366 km Reconstruction of passenger platforms, passenger lounges in placing sidewalk access, Hajdúbagos, High Street, the 48,104th j. surrounding access road 2 + 000 km section of the bus turning design, construction of bus bay, passengers awaiting disposal, road access full track expansion device 112 m2 area, turning the asphalting of a leveling layer + 400 m2 surface. The passenger lounges made of wood, Alsóregmec-made structures. The object of preparing an export plan of turning this bus procurement. For full specifications of the documentation.

A contract -. NOGPOP 3.1.4 / A-11-2012-0001 Ocean Értől the complex development of public transport supply additional construction related projects in Bihar execution tasks corrections

Pocsaj Nagyközség Önkormányzata | Published August 24, 2015
cpvs
45221250, 34940000

. NOGPOP 3.1.4 / A-11-2012-0001 Ocean Értől the complex development of public transport, according to the additional supply of construction related projects in Bihar execution tasks as follows: Part I: Pocsaj 4808 marked 26 + 736 km road section left the site plan by the need to build additional sidewalks to maintain longitudinal fall under the standard. Build sidewalks: 40 m2 paving the planned structure and 48 m garden edging 4807 marked way 30 + 509 km section better.The (Petofi u 3) The built additional sidewalk 8 m2 and 12 meter margin 32 + 514 km with plenty of built additional pavement 23 m2 34 m Pocsaj and hem, Market u + 426 33 92 4807j left side of the pavement to be built additional 15 m2 to 18 + 348 km fm edge 33 jobb.o. The built additional pavement 15 m2 and 18 m edge of the area covered with crushed stone base uncertain origin, which falhasználható road fund as a form to an average of 10 cm thick Ckt-4 cement stabilization equalization must be the road fund established after the preliminary profiling and compacting. Asphalt must be measured before the start of the Alpine ruggedness, minimum value of 80 N / mm2 of the bus turning pavement width of 3.5 meters of 10.25 meters lekerkítő rays (axis). Develop career structure is as follows: - Existing alapprofilozás, Compression - 10 cm Ckt-balancing layer 4 - 6 cm C-16 main road fund - 5 cm C-11 graphite coating II. Part One: Kismarja be between the sidewalk and the street Island road sign constructed between 4808 bilateral garden trim width of 1.5 meters, next to the state road berm 1.5 meters followed. The 320 meter length sidewalk. The existing filling site to be constructed on the embankment widening layered hijacking after the step of, and compression (degree of compactness upper 50 cm TRQ 95%) of the prepared mirror must be constructed on the sidewalk, the following track structure. - 10 cm gravel sub-base - 15 cm Ckt cement stabilization - 4 cm asphalt wearing course AC-11 III. Part One: Létavértes Based on the attached site plan the amount of átépítetendő sidewalks will be as follows: - Before Provider house 380 m2 - behind the bus Waiting platform 46 m2 - Oradea street pavement accession of 10 m2 - Total: 436 m2 - Garden edging 15 m of sidewalks, the following path structure to be built: - floating thick (10 cm) 4 Ckt-leveling - 3 cm thick bedding finomzúzalék - 6 cm thick stone space to accommodate the rain water falling in the zone: not found, so it is necessary to solve the construction of infiltration wells. The szikkasztókutakat be designed using the following elements: - 20 cm kulékavics filter layer - 2 100/50 kútgyűrű - 1 100/60 shaft reducers - 1 water swallow up cover against the infiltration wells plugging the kulékavics filter pad fluid permeable geotextile be surrounded. IV. Part One: Monostorpályi Petofi Square bus round the track being used and turning and positioning of the platform to redesign trapped in a form that the platform was moved in front of the Mayor's Office and the lekerítő rays have been modified so that the articulated bus find out advice. The attached notice only the budget surplus quantities included. Passengers waiting to be within the scope of the local government, which contributed to the Mayor's Office, according to the minutes. Peroni phone rain shaft should be stressed levels. 4809 marked road 2.2 km 11 + 680 No Right 2.3) + 12 4809 236 km road sign on the right page 6 m2 no additional construction pavement arises.

A contract to No.1. Changing IX. parts with respect

Pocsaj Nagyközség Önkormányzata | Published May 29, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
44212321, 45221250

IX. section: construction field Kismarja Municipality utasperon station 319 + 80 to 320 + 43 sections between HANTA stop utasperon construction: on the left side of the track 63 meters long platform construction. 3 m at the end of the platform to ensure a level difference of 30 cm kifuttatásának, SK + 30 platform construction. Loading of stairs, filling construction, the consolidated utasperon the embankment construction. Guardrail construction of the entire length of the platform and the end of the maturity of the platform. Indoor waiting room with 2 bus cost appropriation, with 2 bus waiting next to municipal road design, the Island Bus várótól street 1.5m wide pavement construction 329fm. Kismarja station Utasperon construction of the station I-II. Dodger between 66 m platform construction, 3-3 today at the beginning and at the end of the platforms 30 cm difference in height kifuttatásának insurance, since SK + 30's platform will be implemented. Over the rail of 30 cm height of the platform will be provided along the length of 60 m. The edge of the platform II. c. vágánytól 1.55 m from the start. The subject of this public procurement is carried out directed. For full specifications of the documentation.

No. 1 Part 3 of a contract amendment with respect

Pocsaj Nagyközség Önkormányzata | Published February 20, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Kft
cpvs
45213315, 44212321, 71220000, 45221250

III. parts: construction field Derecske Municipality utasperon as follows: Derecske station: 132 pcs L Installation 30 platform elements, construction of 113 m2 Viacolor housing Derecske Marketplace stop at 132 pcs L Installation 30 platform elements, construction of 113 m2 Viacolor housing The detailed technical specification documentation.

„ÉAOP-3.1.4./A-11-2012-0001 Értől az óceánig komplex közösségi közlekedés fejlesztése Biharban tárgyú projekt kivitelezési feladatainak ellátása” XII. rész 2. sz. szerződés módosítás

Pocsaj Nagyközség Önkormányzata | Published December 2, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
45000000, 44212321, 45213315, 71220000

XII. Part One: Local Government area of ​​Nagykereki as follows: The bus bay bus platform and bus turning one piece construction of bus passenger waiting platform and the development of 48,115 j. 0 + 536 kmsz design of the road on the left side, 1 bus bays in the 48,115 j. developing road on the right side kmsz 0 + 495 and 1 round and bus passengers waiting on the platform Bajcsy Zsilinszky street next to the train station. Utasperon construction: Nagykereki station: 132 pcs L-30 platform component installation, construction of 113 m2 housing Viacolor In addition to the preparation and implementation of public procurement, the present acquisition of water rights, as well as communications regulatory approvals, the construction plans. Further, it warns that the replacement of communications networks is now subject to authorization. For full specifications of the documentation.

Change No. 2 in respect of a contract to XI.rész

Pocsaj Nagyközség Önkormányzata | Published February 20, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Kft
cpvs
45213315, 44212321, 71220000, 45221250

XI. Part One: Local Government area of ​​Monostorpályi bus stops construction site one passenger waiting position, 2 bus bay, 2 utasperon construction, bus round development of the following locations: Monostorpályi, Létai road 4809th j. Port William-Létavértes s. logging road on the right side under the 11 + 680 km trench existing passenger waiting at stop placement, bicycle storage building, area 153.5 m2 concrete pavement stone. Monostorpályi, Létai road 4809th j. Port William-Létavértes s. on the left by logging road, 12 + 158 km trench bus bay utasperon and 30 meters of sidewalk access and passenger waiting building on the right side of the 12 + 236 km trench bus bay utasperon, 28 m length of pavement and passenger waiting construction Monostorpályi, Petofi Square, bus turning design, 46 m2 broadening entire structure of the existing pavement asphalting 1 332 m2 surface layer bus bay and utasperon construction, passenger waiting construction Monostorpályi Kossuth Street 48,105th j. the left side of the access road by logging in to the 0 + 974 km trench utasperon, bike storage, and sidewalk access gateway (149 m2) building, construction of passengers waiting on the right side of the 1 + 056 km section utasperon construction. The passenger lounges unique masonry construction. The Létai travel bus bays, and the preparation of the Petofi Square bus turning this procurement are subject to an export plan. The detailed technical specification documentation.

3.számú modification of a contract XI. Part respect

Pocsaj Nagyközség Önkormányzata | Published February 20, 2015
Winner
MEZEI-VILL Villamosipari Szolgáltató és Kereskedelmi Kft
cpvs
45213315, 44212321, 71220000, 45221250

XI. Part One: Local Government area of ​​Monostorpályi bus stops construction site one passenger waiting position, 2 bus bay, 2 utasperon construction, bus round development of the following locations: Monostorpályi, Létai road 4809th j. Port William-Létavértes s. logging road on the right side under the 11 + 680 km trench existing passenger waiting at stop placement, bicycle storage building, area 153.5 m2 concrete pavement stone. Monostorpályi, Létai road 4809th j. Port William-Létavértes s. on the left by logging road, 12 + 158 km trench bus bay utasperon and 30 meters of sidewalk access and passenger waiting building on the right side of the 12 + 236 km trench bus bay utasperon, 28 m length of pavement and passenger waiting construction Monostorpályi, Petofi Square, bus turning design, 46 m2 broadening entire structure of the existing pavement asphalting 1 332 m2 surface layer bus bay and utasperon construction, passenger waiting construction Monostorpályi Kossuth Street 48,105th j. the left side of the access road by logging in to the 0 + 974 km trench utasperon, bike storage, and sidewalk access gateway (149 m2) building, construction of passengers waiting on the right side of the 1 + 056 km section utasperon construction. The passenger lounges unique masonry construction. The Létai travel bus bays, and the preparation of the Petofi Square bus turning this procurement are subject to an export plan. The detailed technical specification documentation.