Call +44 800 9755 164

Public tenders for construction in Nagykanizsa Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Community bike rental system to obtain the necessary tools to design, construction and commissioning of the system - Change notice

Nagykanizsa Megyei Jogú Város Önkormányzata | Published September 16, 2015  -  Deadline September 2, 2015
cpvs
34430000, 30162000, 44510000, 48000000, 71320000

Enterprise Contract - Purchase of Community bicycle rental systems required for the development of tools, construction and commissioning of the system

Nagykanizsa "Transport facilities in 2015. Development of the construction works" - Prospectus

Nagykanizsa Megyei Jogú Város Önkormányzata | Published October 26, 2015
Winner
;Tabán-Bau Kft.;Tabán-Bau Kft.;Tabán-Bau Kft.;Tabán-Bau Kft.;Tabán-Bau Kft.;Tabán-Bau Kft
cpvs
45000000, 45233142

Nagykanizsa County Council for "construction works Traffic facilities in 2015. Development of the framework contract agreements, Phase I, 7 Part 1: Nagykanizsa, Constitution street to be renovated sidewalks and drainage ditches Part 2: Nagykanizsa, Kisrác street Varazdin and Nagyrác road and sidewalk reconstruction of part 3 between streets. Nagykanizsa, Dózsa Gy-way street awaiting the construction of a Stop-Shop Business Before Part 4: Nagykanizsa, Kisberki utca 15-21. sidewalk in front renovating Part 5: Nagykanizsa, designation of Gold J. path crossing crosswalk and sidewalk construction Part 6: Nagykanizsa, Nicholas Wood Street, cemetery senior sidewalk renovation of Part 7: Nagykanizsa, walking and bike path (Kisfaludy Csengery street without separation - Forester streets between) the construction Part 1: Nagykanizsa, Constitution Street sidewalk renovation and drainage ditch: The intervention in the planning documents of the 4 + 928.19-5 + 260.00 km no. It means the section between. Intervention relevant section length: 331.81 m Pavement Renovation section in question is the length of the left side: 53.4 m length of the affected Pavement Renovation on the right: 331.81 m Ároktisztítással, Section concerned árokburkolással length of 238 m in the detailed description of the technical documentation contains Estimated value excluding VAT: 15748031 Currency: HUF Part 2: Road and sidewalk renovation of between Nagykanizsa, Kisrác street Varazdin and Nagyrác streets length of the planning process and 301.53 m, initial sections of the Varazdin street of kezdõszelvénytõl 0 + 223 coupons left - the sidewalk separated - a priority while the right wing is built enclosure "K" szegélysor. A detailed technical description contained in the documentation Estimated value excluding VAT: 15514173 Currency: HUF Part 3:. Nagykanizsa, Dózsa road passenger waiting building in front of Stop-Shop Business of the proposed solution, the passengers waiting to stop táblájától east-west direction 11.90 m to be placed within the green area, in parallel to the existing pavement. The concrete base of the island will be available also fits the sidewalk level. The northern side 4.0 m long high priority trim seal the slope. Passengers waiting type: 3 STAR windows, HS-03 (old designation HN-01), cantilevered benches installed. The baseline scenario built structure: - 15cm smoothed vb C35 / 45-XF4-XK2-24 XC4-F2 - 25cm HK frost protection layer - Earth Works E2 = 50 MPa fund the planned public works are not affected. A detailed technical description contained in the documentation Estimated value excluding VAT: 800 000 Currency: HUF Part 4: Nagykanizsa, Kisberki utca 15-21. However, based on a reconstruction of pavement in front of new short section, where 1.50 m width of a ramp will be constructed to ensure a direct link kukatárolóhoz. The existing pavement width of 2.0 m. Pavement renovated track structure: · 2.5 cm thick AC 4 asphalt wearing course · demolition of existing wearing course · Existing pavement rebuilt sidewalk pavement structure: · 2.5 cm thick AC 4 asphalt wearing course · 15 cm CKt base layer · 15 cm gravel sub-base of the detailed technical specifications The documentation contains Estimated value excluding VAT: 677 165 Currency: HUF Part 5: Nagykanizsa, Gold Appointment of J. path crossing crosswalk and sidewalk construction built in the year 2009, roundabout has not been resolved - Transfer of pedestrians - from ezirányból. Both sides connect to an existing sidewalk built. "K" at the roundabout island is bordered to the pedestrian crossing width - 3.0 m - to be broken and sunk back welt closure shall be transferred to the infantry. To ensure a barrier-free transport 2.0 cm difference in height can be built. In addition to the high back hem width 50cm demolition of housing recovery is foreseen. Pavement Contact: - 6 cm concrete shaped stone (gray) - 3 cm NZ 2.5 embedding rtg - 15 cm Ckt4 base layer - 15 cm HK bedding - earthwork E2 = 20 seconds Island (after 20cm to breakdown): - 8cm concrete shaped stone (red) - 3 cm NZ 2.5 embedding layer - 10cm C10-32 / FN base layer - Featured border road next to an existing track lowered pavement 50cm in width - 4 cm AC 11 wearing X-ray - X-ray binding AC 16 7 cm - 20 cm C10-32 / FN base layer of depth The technical specifications as contained in the documentation Estimated value excluding VAT: 1968504 Currency: HUF Part 6: Nagykanizsa, Nicholas Wood Street, cemetery senior sidewalk reconstruction of the beginning of the planning phase, stretching along the cemetery land by the roadside, the end of the design phase, and the Nicholas Fai Street (6804th j Liaison. Street) on the right side by logging. The horizontal alignment of the stairs justify its status to redevelop. Proposed mixed-use pavements (0 + 000 - 0 + 065,33 kmsz): AC 11 wearing j. Wearing layers of connective AC 11 j. FZKA bonding layer of crushed 0/32

Landscape. ELJ. eredm._Nagykőrös City Önkormányzata_Nagykőrös town quality of drinking water - carrying out repair-related investments EEOP 1.3.0 / 09-11-2013-0022 ID No. FIDIC Red Book project construction works according to.

Nagykőrös Város Önkormányzata | Published May 20, 2015
cpvs
45252126, 45262220, 45232453, 45232151, 45223000, 45231113

Nagykőrös town quality of drinking water - carrying out repair-related investments EEOP 1.3.0 / 09-11-2013-0022 ID No. FIDIC Red Book project implementation works by: - ​​iron, manganese and ammonia discharge in providing water purification technology (working in parallel two technological lines) Construction of 3500 m3 / d and 175 m3 / h at peak water demand insurance (raw water tank venting, sender pumps Construction, légtelítő container, iron, and manganese discharge tank, ammonia discharge tanks, ultraviolet disinfection equipment, air compressors, compressor with Légüsttel pneumatic actuation, chlorination equipment with the required safety equipment, building, plumbing and electrical work, rinse nozzle, rinse water of reinforced concrete pool booster pump iron sludge reinforced concrete basin pumping submersible pumps, related to road construction, civil engineering, electrical and mechanical works, control automation, equipment) - water works construction works: (1 ks 240 m foot deep 5/3 sign vízműkút construction of new screening machine housing construction, background color and storage zárkamra reconstruction, reconstruction Booster engine room 2 + 1 Purified water booster pump water works yard swimming lines, facilities, Fountain access the raw water supply system, filtered water pipeline, connecting wire, Flushing water supply, Dekantvíz pressure line, Mosatóvíz fed out and install sewers Drive plumbing disinfection, wastewater small lifting unit plant construction (2 pieces)) - Network reconstruction: 3350 m - Network laundry: 100,000 m in length - to carry out a test run of the trial operation plan and official regulations According to (6 month duration of the test run.) In accordance with the documentation be maintained. The investment is made for the operation of the waterworks. The information given in quantities in excess. Contracting authority does not provide a margin.

Construction site to autistic and has changed the employment of disabled people working to promote the development of - information on the outcome of the proceedings

Nagykanizsa Megyei Jogú Város Önkormányzata | Published February 18, 2015
cpvs
45000000, 45210000

"Site for Autistic and altered working capacity of employment for the promotion of the development of implementation" of the implemented works Description: INSTITUTIONAL interiors CONVERSION, NEW UNIT DEVELOPMENT During the remodeling design of the building is made according to the needs of the new proposed function, covering the following parts of the building: The east wing is not of labor used in the floor plan layout transformation halls, offices, social sub shop will be established. The ground floor area will be built connecting the planned office block. Affected part of the building design will be three entrances: o general entrance - meglévő- the remaining eastern side of the main entrance of the planned sale here or room is also a separate entrance. o for entrance - west wing of the building to be restructured, south access road • Building I and II. floors throughout the level to be restructured, work rooms, offices, social part will be developed here. • Building III. floor is not affected by the conversion. The proposed changes to the supporting structure of the building slightly affects the following locations: • The ground floor area connecting structural walls formed by replacing its intended function. • The existing building structure retention, steel elevator will be installed to replace an existing skylight yard. BUILDING PARTS OF THE RELEVANT CONVERSION COMPLETE RENOVATION OF ELECTRICAL the larger area, the rooms have a significant amount of electric-powered equipment must also be provided with sub-distribution equipment. MEGLÉVŐ- AND NEW BUILDING PARTS PROJECT PROPORTIONAL accessible for batches of about • Building Environment - barrier-free parking • The design of the building more accessible - wheelchair access ramp • entrances and interior doors to improve accessibility • Transport within the building levels között- unobstructed elevator construction • The required service areas, establishment of sanitary • ICT obstacles involved Construction-related core areas: ground floor: 647.46 m2 first floor: 838.48 m2 II. Floor: 842.97 m2 Total: 2,328.91 m2 Sidewalk ramp (south side): 20.4 m2 Ramp (west side): 9.3 m2

Contract award of Nagykanizsa, Park City preparing for social rehabilitation of urban construction plans licensee and the Park City Nursery in respect of the planning framework contract.

Nagykanizsa Megyei Jogú Város Önkormányzata | Published December 2, 2015
Winner
Pannoninsel Kft.
cpvs
71240000

Subject of procurement: Services available on the amount of purchases in Nagykanizsa, preparation of Park City social-purpose urban rehabilitation licensee and construction plans of the Park City Nursery in respect of the Park City Nursery - structural exploration property (each node element of Exploration) - Making survey design (layout, structural elements typical node) - architect modified plan, unpriced budgets - roof repair plan - wood protection expert (supporting structure, roofing) - Soil mechanics - structural reinforcement design documentation

"Transport facilities construction works of the developments of 2015, within the framework of a works contract, Phase I, Section 7," No. 1 subject of a contract amendment

Nagykanizsa Megyei Jogú Város Önkormányzata | Published November 20, 2015
Winner
Tabán-Bau Mezőgazdasági, Építőipari és Kereskedelmi Kft.
cpvs
45000000, 45233142

Nagykanizsa County Council for "construction works Traffic facilities in 2015. Development of the framework contract agreements, Phase I, 7 Part 1: Nagykanizsa, Constitution street to be renovated sidewalks and drainage ditches Part 2: Nagykanizsa, Kisrác street Varazdin and Nagyrác road and sidewalk reconstruction of part 3 between streets. Nagykanizsa, Dózsa Gy-way street awaiting the construction of a Stop-Shop Business Before Part 4: Nagykanizsa, Kisberki utca 15-21. sidewalk in front renovating Part 5: Nagykanizsa, designation of Gold J. path crossing crosswalk and sidewalk construction Part 6: Nagykanizsa, Nicholas Wood Street, cemetery senior sidewalk renovation of Part 7: Nagykanizsa, walking and bike path (Kisfaludy Csengery street without separation - Forester streets between) the construction Part 1: Nagykanizsa, Constitution Street sidewalk renovation and drainage ditch: The intervention in the planning documents of the 4 + 928.19-5 + 260.00 km no. It means the section between. Intervention relevant section length: 331.81 m Pavement Renovation section in question is the length of the left side: 53.4 m length of the affected Pavement Renovation on the right: 331.81 m Ároktisztítással, Section concerned árokburkolással length of 238 m in the detailed description of the technical documentation contains Estimated value excluding VAT: 15748031 Currency: HUF Part 2: Road and sidewalk renovation of between Nagykanizsa, Kisrác street Varazdin and Nagyrác streets length of the planning process and 301.53 m, initial sections of the Varazdin street of kezdõszelvénytõl 0 + 223 coupons left - the sidewalk separated - a priority while the right wing is built enclosure "K" szegélysor. A detailed technical description contained in the documentation Estimated value excluding VAT: 15514173 Currency: HUF Part 3:. Nagykanizsa, Dózsa road passenger waiting building in front of Stop-Shop Business of the proposed solution, the passengers waiting to stop táblájától east-west direction 11.90 m to be placed within the green area, in parallel to the existing pavement. The concrete base of the island will be available also fits the sidewalk level. The northern side 4.0 m long high priority trim seal the slope. Passengers waiting type: 3 STAR windows, HS-03 (old designation HN-01), cantilevered benches installed. The baseline scenario built structure: - 15cm smoothed vb C35 / 45-XF4-XK2-24 XC4-F2 - 25cm HK frost protection layer - Earth Works E2 = 50 MPa fund the planned public works are not affected. A detailed technical description contained in the documentation Estimated value excluding VAT: 800 000 Currency: HUF Part 4: Nagykanizsa, Kisberki utca 15-21. However, based on a reconstruction of pavement in front of new short section, where 1.50 m width of a ramp will be constructed to ensure a direct link kukatárolóhoz. The existing pavement width of 2.0 m. Pavement renovated track structure: · 2.5 cm thick AC 4 asphalt wearing course · demolition of existing wearing course · Existing pavement rebuilt sidewalk pavement structure: · 2.5 cm thick AC 4 asphalt wearing course · 15 cm CKt base layer · 15 cm gravel sub-base of the detailed technical specifications The documentation contains Estimated value excluding VAT: 677 165 Currency: HUF Part 5: Nagykanizsa, Gold Appointment of J. path crossing crosswalk and sidewalk construction built in the year 2009, roundabout has not been resolved - Transfer of pedestrians - from ezirányból. Both sides connect to an existing sidewalk built. "K" at the roundabout island is bordered to the pedestrian crossing width - 3.0 m - to be broken and sunk back welt closure shall be transferred to the infantry. To ensure a barrier-free transport 2.0 cm difference in height can be built. In addition to the high back hem width 50cm demolition of housing recovery is foreseen. Pavement Contact: - 6 cm concrete shaped stone (gray) - 3 cm NZ 2.5 embedding rtg - 15 cm Ckt4 base layer - 15 cm HK bedding - earthwork E2 = 20 seconds Island (after 20cm to breakdown): - 8cm concrete shaped stone (red) - 3 cm NZ 2.5 embedding layer - 10cm C10-32 / FN base layer - Featured border road next to an existing track lowered pavement 50cm in width - 4 cm AC 11 wearing X-ray - X-ray binding AC 16 7 cm - 20 cm C10-32 / FN base layer of depth The technical specifications as contained in the documentation Estimated value excluding VAT: 1968504 Currency: HUF Part 6: Nagykanizsa, Nicholas Wood Street, cemetery senior sidewalk reconstruction of the beginning of the planning phase, stretching along the cemetery land by the roadside, the end of the design phase, and the Nicholas Fai Street (6804th j Liaison. Street) on the right side by logging. The horizontal alignment of the stairs justify its status to redevelop. Proposed mixed-use pavements (0 + 000 - 0 + 065,33 kmsz): AC 11 wearing j. Wearing layers of connective AC 11 j. FZKA bonding layer of crushed 0/32

Community bike rental system to obtain the necessary tools to design, construction and commissioning of the system - results

Nagykanizsa Megyei Jogú Város Önkormányzata | Published November 13, 2015
Winner
Cycleme Bérkerékpár Rendszerek Kft. - Neuzer Kft. közös ajánlattevők
cpvs
34430000, 30162000, 44510000, 48000000, 71320000

Supply and installation of Kerékpárdokkolók 160 Terminals (collection center) supply and installation transport 10 bicycles supply and installation of 80 pieces of GPRS transmitters supply and installation of 80 pieces of lighting equipment purchase of 80 pieces Electronic locks 80 pieces RFID 3000 RFID card reader / writer 2 Notebook the necessary software 3 x Pointing Device (Mouse) 3 x A4 laser printer 2 MPV LCV Procurement of enlargement 1 trailer Purchase of 1 Unit: 1 unit area surveillance point to build 10 Repeater 4 commissioning, training, education, training min. Creating Identity Plan 2 Weeks 1 min. 3 Version 1 for bicycles necessary tools needed 1 set 2 sets of spare parts for bicycles Service Pack 2 sets Test run (trial run) min. 2 Weeks 1

No. 2 amending the treaty conference - a contract "for the social rehabilitation of Park City" in the subject

Nagykanizsa Megyei Jogú Város Önkormányzata | Published November 27, 2015
Winner
Z-Pannon Építőipari Kivitelező és Fővállalkozó Kft. és Szabau Invest Kft. közös ajánlattevők
cpvs
45200000, 45111100, 45111212, 45261400, 45262100, 45311200, 45315000, 45316110, 45330000, 45331210, 45421100, 45213316, 45233162, 45430000, 45431000, 45442100

Rehabilitation of City Park social purpose "Csengery u. 117 / 4-6 renovating residential buildings (24 pc social housing); Nagykanizsa Municipal Swimming pool refurbishment; Park City kindergarten refurbishment; Design and construction of public lighting Forester Street sidewalk; Lighting design and construction of bicycle paths along the street Csengery; Building Surveillance Camera System. The exact amounts included in the tender documentation.

A contract "for the social rehabilitation of Park City" energy - informational amending the contract

Nagykanizsa Megyei Jogú Város Önkormányzata | Published May 22, 2015
Winner
Z-Pannon Építőipari Kivitelező és Fővállalkozó Kft. és Szabau Invest Kft. közös ajánlattevők
cpvs
45200000, 45111100, 45111212, 45261400, 45262100, 45311200, 45315000, 45316110, 45330000, 45331210, 45421100, 45213316, 45233162, 45430000, 45431000, 45442100

Rehabilitation of City Park social purpose "Csengery u. 117 / 4-6 renovating residential buildings (24 pc social housing); Nagykanizsa Municipal Swimming pool refurbishment; Park City kindergarten refurbishment; Design and construction of public lighting Forester Street sidewalk; Design and construction of public lighting of bicycle paths along the street Csengery; Building Surveillance Camera System. The exact amounts included in the tender documentation.

Execution of the contract "Nagykanizsa agglomeration sewerage and sewage treatment plants to develop" subject, EEOP - 1.2.0 / 2F-2008-0004 within the framework of project identification number of the heat pump system .. - information

Nagykanizsai Regionális Szennyvíztársulás | Published April 24, 2015
Winner
SZEA Nagykanizsa Konzorcium (SZABADICS Közmű- és Mélyépítő Zrt. és EuroAszfalt Építő és Szolgáltató Kft.)
cpvs
45315100, 45310000, 45112500, 45221250, 42511110

The object of the procurement: Construction Contract "Nagykanizsa agglomeration sewerage and sewage treatment plants to develop" subject, EEOP - framework 1.2.0 / 2F-2008-0004 identification number of projects heat pump system construction and design, the FIDIC Yellow Book according to the total quantity of gas boilers In order to reduce operation and maintenance for the septic, heating hot water for the production and installation of the wastewater system heat pump system of detailed technical content of the technical documentation 3-5. c. The volumes contain.

A contract to "Park City for social rehabilitation" of energy - informational award

Nagykanizsa Megyei Jogú Város Önkormányzata | Published November 12, 2014
Winner
Z-Pannon Építőipari Kivitelező és Fővállalkozó Kft. és Szabau Invest Kft. közös ajánlattevők
cpvs
45200000, 45111100, 45111212, 45261400, 45262100, 45311200, 45315000, 45316110, 45330000, 45331210, 45421100, 45213316, 45233162, 45430000, 45431000, 45442100

Rehabilitation of Park City social purpose "Csengery u. 117 / 4-6 Reconstruction of residential building (24 rooms and social housing); Nagykanizsai Municipal swimming pool renovation; Park City kindergarten renovation; Design and construction of public street lighting forester sidewalk; Design and construction of public lighting along the bike path Csengery street; Building Surveillance Camera System. The exact quantities are included in the tender documentation.

Reference number 1 amending the contract

SZEPETNEK KÖZSÉGI ÖNKORMÁNYZAT | Published June 26, 2015
Winner
Nawaro Energy Kereskedelmi és Szolgáltató Kft.
cpvs
45310000, 45315000, 71321000, 09331000

"Solar power generation systems Szepetneki at the following locations: Town Hall (70 Petofi u.), Cultural Centre and Kindergarten (61 Petofi u.), Marked with a cross (29 Petofi u.) Cooking Kitchen (Joseph A. u 1). Health center "Main quantities (u 9-11..): The construction task relates to the preparation of the solar power generation system construction drawing, as well as the transportation associated with the system tools and complete turnkey implementation, including the supplement existing electrical network of the building photovoltaic generation equipment capable fed back into the supply network, in isolated operation "NO". Partial / complete replacement of the primary objective of contracting electricity consumption in production facilities and the resulting surplus production sold during the accounting period operating using renewable energy sources. To this end, Contracting photovoltaic power generation system construction of decided. Just licensee inverter system can be installed. Solar-powered system that the solar modules with regard to compliance with the IEC61215 and the requirements of the EN61730 standard: Number of modules: 159 Total installed side DC power: 39.75 kWp Substructure: aluminum sloping roof support structure 40 x 40 module profiles, U toldóprofil U-secondary clamps, V végleszorító Inventors: - 3 phase 3 - 2 Phase 1 For further details and the exact specification contains the technical description part of the documentation.

FIDIC Engineering services in the "agglomeration Nagykanizsa sewerage and sewage treatment plants to develop" subject, EEOP - 1.2.0 / 2F-2008-0004 in the framework of project identification number of the heat pump system ... - information

Nagykanizsai Regionális Szennyvíztársulás | Published April 24, 2015
Winner
Szécsényi Lajos
cpvs
71300000, 71356100, 71631000

The object of the procurement: FIDIC engineering services "Nagykanizsa agglomeration sewerage and sewage treatment plants to develop" subject, EEOP - 1.2.0 / 2F-2008-0004 heat pump system in the context of the identification number of projects for the construction and design of the FIDIC Yellow Book under, under an agency agreement The total quantity (Acting) The functions of the contractor:

Nagykanizsa bicycle traffic network development, development of automated bicycle rental system tied corpus - a statement of award

Nagykanizsa Megyei Jogú Város Önkormányzata | Published July 20, 2015
cpvs
45233220, 45233229

"Development of automated bicycle rental system development corpus of Nagykanizsa bicycle traffic network attached" Description of the implemented works: 1. Construction of Constitution Street passenger waiting area: Waiting area of ​​80 m2: 17,37 m2 Building height: 2.37 m 2 Balaton street (MOL gas station building before) bus bay - the development of bus-stop standard-sized bay 3 Nagykanizsa, Dózsa street (water tower) passengers awaiting refurbishment 4 Nagykanizsa, Park City bus Round pavement construction works 5. Nagykanizsa, Teleki road (hospital Gateway) bus bay upgrading pavement reconstruction. replacement of curbs, building redevelopment occurring Island bike path between Nagykanizsa, Business Incubator House and Water Tower 6, 7, Nagykanizsa, bike docking stations (10) The establishment of the detailed technical specifications of the tender documents include

No. 3 amending the treaty conference - a contract "Park City for the social rehabilitation of" the subject of

Nagykanizsa Megyei Jogú Város Önkormányzata | Published February 8, 2016
Winner
Z-Pannon Építőipari Kivitelező és Fővállalkozó Kft. és Szabau Invest Kft. közös ajánlattevők
cpvs
45200000, 45111100, 45111212, 45261400, 45262100, 45311200, 45315000, 45316110, 45330000, 45331210, 45421100, 45213316, 45233162, 45430000, 45431000, 45442100

Rehabilitation of Park City for social purposes "
Csengery u. 117 / 4-6 renovation of residential buildings (24 pieces of social housing);
Nagykanizsa Municipal Swimming Pool refurbishment;
Renovation of kindergarten Park City;
design and construction of public lighting Forester Street sidewalk;
lighting design and build a bike path along the Csengery utca;
Building Surveillance camera system.
The exact amounts included in the tender documentation.

Magyarszerdahely tourism business works contract furniture barn II. Change sz.szerződés.

Magyarszerdahely Község Önkományzata | Published November 12, 2014
Winner
Profi 2007 Kft.
cpvs
45212100

Magyarszerdahely tourist resting barn construction formulated Building Community Building program is intended server rooms. The building is naturally ventilated cabinets, interior, átszellőzéssel reclaim the premises. The floors are made of cold coverings according to plan, the covered outdoor space téglaburkolatos antifreeze. Lavatories 2.10 m height ceramic tile to be covered, Mediterranean-style colored tiles. The unheated building design. Total floor area is 257 m2. The task of the roof válllakozó export plan, and the lightning protection plan preparation.

Nagykanizsa City Development expander function - Downtown area action plan II. rate "(Museum Square before stipulation, the District Office Square) and the implementation of Nagykanizsa Main Street reconstruction of water supply and sewerage - result

Nagykanizsa Megyei Jogú Város Önkormányzata | Published August 7, 2015
Winner
Szabadics Közmű- és Mélyépítő Zrt.
cpvs
45200000, 34928500, 34996100, 45112723, 45111290, 45231300, 45232332

Within the framework of a contract NYDOP-3.1.1 / B1-13 2013-0006 County's towns, urban regeneration priority project themed "Nagykanizsa City Development expander function - Downtown area action plan II. rate "(Museum Square before stipulation, the District Office Square) and the implementation of Nagykanizsa Main Street reconstruction of water supply and sewage" - to develop uniform quality streetscape reconstruction of the main road. - The creation of a multi-generational park at Eötvös square. - Building Energy-saving lighting stretches of public land affected development Main Street redevelopment: Housing reconstruction, sidewalk and walkway construction, bike path construction design support for the visually impaired transport of curbs Paving: 6580 m2 Main road in the first and second Revitalization (Sabján of streets radius of streets Hunyadi street reconstruction) Eötvös space, playground landscaping; automatic irrigation network construction Erzsébet tér - Convent Street - Ady Endre street, Csengery utca - Deák Ferenc tér, Széchenyi tér - Installation of Eötvös space traffic control equipment; A renewed public areas of energy-efficient street lighting deployment: - masts, disconnecting cables - street lighting columns kandelláberek placement: 68 Public lighting ground cable NYY-J 4x25 mm2: 231.0 m of street lighting ground cable NYY-J 4x16 mm2: 1386.0 meter decorative lighting ground cable, NYY- J 3x2,5 mm2: 157.0 m - the number of heads of LV cable cross-section of material, the actual length of street lighting ground cable NYY-J 4x25 mm2: 250.0 fm Public lighting underground cable NYY-J 4x16 mm2: 1780.0 m

Reference No. 2 of the contract modification

SZEPETNEK KÖZSÉGI ÖNKORMÁNYZAT | Published September 9, 2015
Winner
Nawaro Energy Kereskedelmi és Szolgáltató Kft.
cpvs
45310000, 45315000, 71321000, 09331000

"Solar power generation systems Szepetneki at the following locations: Town Hall (70 Petofi u.), Cultural Centre and Kindergarten (61 Petofi u.), Marked with a cross (29 Petofi u.) Cooking Kitchen (Joseph A. u 1). Health center "Main quantities (u 9-11..): The construction task relates to the preparation of the solar power generation system construction drawing, as well as the transportation associated with the system tools and complete turnkey implementation, including the supplement existing electrical network of the building photovoltaic generation equipment capable fed back into the supply network, in isolated operation "NO". Partial / complete replacement of the primary objective of contracting consumption of electricity generating equipment, and the resulting surplus production sold during the accounting period operating using renewable energy sources. To this end, Contracting photovoltaic power generation system of implementation decided. Just licensee inverter system can be installed. Solar-powered system that the solar modules with regard to compliance with the IEC61215 and the requirements of the EN61730 standard: Number of modules: 159 Total installed side DC power: 39.75 kWp Substructure: aluminum sloped roof support structure 40 x 40 module profiles, U toldóprofil U-secondary clamps, V végleszorító Inventors: - 3 x 3-phase - 2 phase 1 for more details and the exact specification contains the technical description part of the documentation.

Nagykanizsa, 2015 Transportation Facilities II. pace, Informative award

Nagykanizsa Megyei Jogú Város Önkormányzata | Published January 13, 2016
Winner
Rajna Ép-Ker Építőipari és Kereskedelmi Szolgáltató Korlátolt Felelősségű Társaság;Tabán-Bau Kft;Tabán-Bau Kft
cpvs
45000000, 45233142

Invitation: II.1.5) Short description of the contract / object Nagykanizsa Municipality for "Transport facilities construction works of the 2015 development of the framework, Enterprise Contract II. pace, three partially invitation II.2.1) Total quantity or value: Nagykanizsa Municipality for 'framework, II Transport facilities construction works of the 2015 Development of Enterprise Treaty. pace, three parts: Part 1: Nagykanizsa, Constitution Street sidewalk renovation and drainage ditch Part 2: March 15 Square road rehabilitation and rainwater drainage Part 3: Nagykanizsa, Dózsa. Designated pedestrian crossing the street and the building of the northern bus bay pavement reconstruction in detail in parts of the documentation. (if applicable, figures only) Estimated value excluding VAT: 69722130 - Currency: HUF Annex B: Part 1: Nagykanizsa, Constitution street and sidewalk renovation of the drainage ditch intervention in the planning documents of the 4 + 928.19-5 + 260 , 00 km no. It means the section between. Intervention relevant section length: 331.81 m Pavement Renovation section in question is the length of the left side section concerned Pavement Renovation length of 53.4 m on the right: 331.81 m Ároktisztítással, Section concerned árokburkolással length of 238 m in the detailed description of the technical documentation (if applicable , figures only) Estimated value excluding VAT: 15748031 Currency: HUF Part 2: March 15 Square road rehabilitation and construction of storm water drainage purpose of the space March 15 0 + 220.48 - 301.22 km between sections 0 + a Strengthening the current track has been renovated in the beginning stage and the street Gördövényi 0 + 002,00 - 060.19 km between sections 0 + supply of solid surface and the drain rainwater drainage, thereby ensuring better conditions utazáskényelmi the road to the construction site We find trees and maintaining the playground. The Gödövényi street drainage is incomplete, 0 + 057,63 km of trenches located in the existing culvert is damaged, the task can not see it, it has to be demolished. The March 15. space exploration under the existing pavement structure is as follows: 6 cm aszfaltmakadám 15 cm crushed stone base course 20cm local gravel The Gördövényi street of the existing pavement structure: 20 cm crushed stone base course 20cm local gravel A detailed technical description contained in the documentation (if cases, figures only) Estimated value excluding VAT: 12492000 Currency: HUF Part 3: Nagykanizsa, pedestrian crossings designated Dózsa street construction and the northern bus bay pavement reconstruction in Nagykanizsa, Dózsa street and pedestrian crossings and sidewalks connection designated Postakert street intersection construction of the pedestrian section between regulated and safe passage, and Dózsa street Hevesi Sándor utca and Postakert existing bus bay in the north deteriorated pavement structure and recessed edges renovation. The lighting can also be added. Planned sidewalk pavement in case of connection: - 4.0 cm AC 50/70 8 wearing rolled asphalt wearing course - 15 cm Ckt-T2 cementstabilizációs base layer - 25 cm gravel protection and enhancement layer (lmax = 5%) of the bus bay width 3.00 m length: 18,85 m. Planned pavement wearing course replacement in case (Dózsa György utca 50 cm in width) of: - 4.0 cm AC 11 (F) wearing 50/70 Wearing layers of the existing pavement milling on Planned pavement bus bay: - 10 cm precast concrete paving conn "B". Class "F" Laying pattern - 3.0 cm Baggeres ballast layer - 20 cm C12 / 15 soványbeton base layer - 20 cm M% / mechanical stabilization - 50 cm soil replacement granular material (if any) Signboard, traffic control signs, road markings plan, according to . A detailed technical description contained in the documentation (if appropriate, figures only) Estimated value excluding VAT: 3531000 Currency: HUF

Nagykanizsa Tripammer u. U 1, 3475. Funeral home building under renovation and interior decoration works and pavement renovation - informational award

Nagykanizsa Megyei Jogú Város Önkormányzata | Published June 12, 2015
cpvs
45110000, 45310000, 45317000, 45431000, 45432000, 45111000, 45112700, 45215400, 45321000, 45410000, 45450000

3475 u. Funeral home building under renovation and interior decoration works and pavement reconstruction of "the subject of the works implemented description: Ceremonial funeral home RAINWATER facilities construction work, temporary bridge: 8m2 trench Propping dúcolással and breakdown of bilateral horizontal pallózással: 239.4 m2; Trench excavation work: 65.29 m3; Restore the Earth: 27.93 m3; Mirror Generation: 79.8 m2; Compression 16.46 m3; Over and under compression surnames: 36.88 m3; Explained land and demolition rubble of roads means of transport, machine delivery to, landfill fees: 25.73 m3; Soil preparation layer: 8.95 m3; Channel Utility Precast construction and demolition debris monolithic shafts and channels: 0.2 m3; Incorporation of a page muffle plastic sewer pipe trench ground: 24.4 m; Incorporation of a page muffle plastic sewer pipe trench ground rubber ring bindings without fittings: 199.6 m; Plastic and installation of sewer pipe socket piece of land ditch, rubber ring bonded to the outer tube diameter 250 mm: 13 pieces; Plastic and installation of sewer pipe socket piece of land ditch, rubber ring bindings: 3; Concrete pit-bottom positioning element: 5; Factory-built PVC connector: 5; Factory-built PVC connector surplus: 8; Factory-built PVC connector surplus: 9; Placing plastic bottom element inserted rubber ring: 1; Placing plastic bottom element inserted rubber ring: 2; Plastic aknafalcső, absorbing or telescopic tube placement: 1; Placing pre-fabricated plastic clay mines, pre-built compressed gravel ballast: 4 pieces; Placing of additional plastic shafts, positioning cover frame: 3 pieces; Aknahágcsó installation of plastic-coated aluminum or steel ring: 10; Square manhole covers and cast iron fedlapkeret placement: 3 pieces; Making Plaster channel trenches and shafts: 5; Waterproof Test of elfalazással: 133 m; Making Slot drain pipe or manhole walls: 1; Polymer concrete drainage system (channel) placement: 22m; Polymer concrete drainage system (channel) placement of accessories (S-type drainage Twitter): 4 pcs. Demolition of concrete pavement and asphalt concrete road: 10.14 m3; After a pipeline of concrete roadbed Recovery: 8,19m3; demolition and construction of concrete block paving to 10 m2; Making mastic asphalt pavement: 1,95m3 6. Cast Iron Pipe Stand: 2 m; Cast iron pipe rack, DN 125/1000 mm: 4 m