Miskolc Autistic Centre Laundry building construction

Miskolci Autista Alapítvány | Published February 25, 2015
Winner
Jánosik és Társa Kft.
cpvs
45000000

BSc in all sectors of the construction works contracts Miskolc Autistic Centre laundry building. Quantity: 96.65 m2 total useful floor area of ​​buildings of architectural, mechanical and electrical construction, as defined in the technical documentation.

No.1 Contract amendment - "TOP 5.5.0-09-11. carrying out related projects under construction are construction works outside the building Owl "

Miskolc Megyei Jogú Város Önkormányzata | Published November 9, 2015
Winner
Titán Service Kft.
cpvs
45221250, 45110000, 45111200, 45231100, 45233200, 45316213, 45111220, 45111230, 45223210, 45233293

Within the framework of a contract to a "Miskolc, Upper Majláth-terminus of an elevated level of service development in place to stop the building of the rehabilitation of the Owl" called, TOP 5.5.0-09-11. non-completion of construction works related to projects under construction are Owl's building contractor shall: - replacement of street lighting, relocation of existing poles, reinstalling - building demolition - 50 cm thick. earthwork construction - road and pavement construction - Construction of 6 cm square stone cladding - curbs placement - removing traffic control signals and creating new ones - five pieces of steel passenger waiting building - 1 steel 10 támaszos bicycle storage building - plants installation - 377 m2 grassing - street furniture installation Investment During the full implementation ensure the smooth functioning of the electricity flow, the electrical contractor will maintain traffic. Bidder acknowledges that the work area is a multiple construction activity is taking place in coordination with each other so that the construct is required to be based on the use of a site plan of the area. Contracting bidders draws attention to the technical handover date of 30 November 2015 should start with a maximum of 15 days to closing. The deadline for completion (successful technical delivery and acceptance): 12.15.2015. Day. The amounts indicated for information. A detailed and itemized specifications, quantities in the tender documentation.

Information on the outcome of the proceedings - Nekézseny construction of a new parish

Tiszáninneni Református Egyházkerület | Published November 25, 2015
Winner
Juhász László egyéni vállalkozó
cpvs
45212360

Subject: Nekézseny construction of a new parish Quantity: Nekézseny, Széchenyi út 2, 207 u. New parish property under construction, the transformation of existing housing minister melléképületté, garden tool storage building and a covered, open-storage building plans for the construction of export, the final building permit and use of materials and quantities in addition to the unpriced budget. Main quantities: • New housing construction minister: ground 216.06 m2, 14.84 m2 gallery. • Boiler room: 15,10 m2. • Garage: 24.52 m2. • Garden tool storage 12.68 m2. • Indoor hall in the tank: 13.88 m2. • Indoor, outdoor storage: 31.78 m2.

Owl completion of construction works outside the building - Change notice

Miskolc Megyei Jogú Város Önkormányzata | Published August 14, 2015  -  Deadline August 19, 2015
cpvs
45221250, 45110000, 45111200, 45231100, 45233200, 45316213, 45111220, 45111230, 45223210, 45233293

Within the framework of a contract to a "Miskolc, Upper Majláth-terminus of elevated levels of development of the service station building rehabilitation place for the Owl" called, TOP 5.5.0-09-11. carrying out related projects under construction are outside the Owl building construction work

TOP 5.5.0-09-11. related to projects under construction are performing Owl building during construction works full reconstruction - Change notice

Miskolc Megyei Jogú Város Önkormányzata | Published July 15, 2015  -  Deadline July 16, 2015
cpvs
45223200, 45110000, 45262500, 45421110, 45430000, 45231100, 45233251, 45262600

Within the framework of a contract "in Miskolc, Upper Majláth-terminus of developing elevated level of service station building rehabilitation place for the Owl" called, TOP 5.5.0-09-11. related to projects under construction are performing Owl building during construction works full reconstruction

"TOP 5.5.0-09-11. related to projects under construction are in full-scale reconstruction of buildings Owl perform construction works "calls for tenders

Miskolc Megyei Jogú Város Önkormányzata | Published June 24, 2015  -  Deadline July 16, 2015
cpvs
45223200, 45110000, 45262500, 45421110, 45430000, 45231100, 45233251, 45262600

Within the framework of a contract "in Miskolc, Upper Majláth-terminus of developing elevated level of service station building rehabilitation place for the Owl" called, TOP 5.5.0-09-11. related to projects under construction are performing Owl building during construction works full reconstruction

"Within the construction works of St. Francis Hospital and Semmelweis construction of district heating under the EEOP 5.4.0 / ID No. 12-2013-0019 project" No. 2 contract modification

MIHŐ Miskolci Hőszolgáltató Kft. | Published June 10, 2015
Winner
TERRA-21 Közmű- és Mélyépítő Kft.
cpvs
45232000, 45232140, 45232142, 45232100, 45223110, 45231000, 45310000, 45330000, 45350000

A contract to Miskolc, St. Francis Hospital and Semmelweis district heating building construction works within the framework of the EEOP 5.4.0 / Project ID No. 12-2013-0019 Subject: Miskolc, St. Francis Hospital, Semmelweis district heating and building construction works of district heating pipeline construction: 2x1740 m pre-insulated wire, with an average depth of 1.5m, 10 additional substation equipment, construction / installation (expansion tanks, hot water tanks, electric central heating automatic execution, etc), for working drawings, construction plans and tender documents, according to which form part of the tender documentation

Amending the Prospectus supply and construction contract design jobs

Borsodvíz Önkormányzati Közüzemi Szolgáltató Zrt. | Published June 26, 2015
Winner
AG Konzorcium nevében Aquaprofit Műszaki, Tanácsadási és Befektetési Zrt.
cpvs
45232400

Smooth supply of water base in the village of Baskói power cord construction, dam design, energiaellátástávjelzése, building Emőd Adrian-farm distribution network and the replacement of asbestos cement water mains supply material-Zemplén County: small regional town planning and construction process subject to duties under FIDIC Yellow Book. 1. New construction - connecting the supply of plain water base in the village of Baskói 4384 m power cable construction, conversion of 20 m³ storage, remote transmission of energy supply, - Construction of Adrian Emőd-farm distribution network of 343-meter length. 2. Reconstruction works: reconstruction of 11 local distribution network in stages asbestos material part of the ivóvízbekötések partial modernization of: - Alsózsolca 3625 - Ároktő 3715 - Bodrogkisfalud 2235 - Bükkszentkereszt 4170 - Bodrogkeresztúr 3760 - Mezőcsát 8593 - Nyékládháza 6532 - Tarcal 3924 - Tiszakeszi 9360 - Tiszatarján 2055 - 3625 Tokaj - Total: 51,594 lm. It is necessary to carry out design work and trial operation. Detailed technical information contained in the documents relating to the work volume 3, 4 and 5. Contracting Authority points out that the quantities given for information only. Contracting warns that the margin is the value of total amount of the contract is accepted up to 5%, meaning that the maximum value can not exceed 67,514,700 HUF was in accordance with the agreement concluded with the Swiss Fund assistance. The advance will be drawn down in accordance with the contract defined.

"Specifying related projects under the TOP-5.5.0-09-11. No. construct a building construction works outside the Owl" Invitation to tender

Miskolc Megyei Jogú Város Önkormányzata | Published July 31, 2015  -  Deadline August 19, 2015
cpvs
45221250, 45110000, 45111200, 45231100, 45233200, 45316213, 45111220, 45111230, 45223210, 45233293

Within the framework of a contract to a "Miskolc, Upper Majláth-terminus of elevated levels of development of the service station building rehabilitation place for the Owl" called, TOP 5.5.0-09-11. carrying out related projects under construction are outside the Owl building construction work

"In carrying out full-scale reconstruction-related projects under the TOP-5.5.0-09-11. No Owl construction building construction works" contract amendment -Tájékoztató

Miskolc Megyei Jogú Város Önkormányzata | Published November 27, 2015
Winner
Gerixon Tervező és Kivitelező Kft.
cpvs
45223200, 45110000, 45262500, 45262600, 45421110, 45430000, 45231100, 45233251

Within the framework of a contract to a "Miskolc, Upper Majláth-terminus of an elevated level of service development in place to stop the building of the rehabilitation of the Owl" called, TOP 5.5.0-09-11. related to projects under construction are performing Owl building during construction works full-scale reconstruction. The contractor responsible for the Owl building in a complete reconstruction - complete demolition of 700 m2 building ground floor - Strengthening 138 m2 of basement slab, construction material and reinforcement of foundations, thermal insulation, windows and doors, building associated with geothermal heating mechanical and electrical systems - 485 m2 at ground floor: new load-bearing structure and interior partitions construction, skilled labor, complete building engineering and electrical design, barrier-free elevator installation - 373 m2 floor level: a new architecture and interior partitions construction, skilled labor, complete building engineering and electrical design - interior finishes, joinery (built-in counters, kitchenette), painting and decorating contractor shall, in addition: - in the full implementation of the investment to ensure the smooth operation of electric traffic, electric transport maintenance - The bus stop locations of temporary relocation / outsourcing, of which Bidder shall be provided at its own expense -. the operation of ticket offices during the construction period of the current container provided to maintain and, where ticket scheme locality located in the building operation of the container shipment from the Miskolc Municipal Transport Company's site - housed in the building ticket scheme village (external access option by passengers) no later than 11/30/2015 up to ensure that the absence of contractor's expense, other means should be allowed to ticket sales.

"A contract of Miskolc, St. Francis Hospital and Semmelweis district heating building construction works" contract amendment No. 1

MIHŐ Miskolci Hőszolgáltató Kft. | Published February 20, 2015
Winner
TERRA-21 Közmű- és Mélyépítő Kft.
cpvs
45232000, 45232140, 45232142, 45232100, 45223110, 45231000, 45310000, 45330000, 45350000

A contract to Miskolc, St. Francis Hospital and Semmelweis district heating building construction works within the framework of the EEOP 5.4.0 / Project ID No. 12-2013-0019 Subject: Miskolc, St. Francis Hospital and Semmelweis district heating building construction works of district heating pipeline construction: 2x1740 m pre-insulated wire, with an average depth of 1.5m, 10 additional substation equipment construction / installation (expansion tank, hot water tank, electric central heating control execution, etc), for construction plans, construction plans and tender documentation to be part of the tender documentation

"A contract of Miskolc, St. Francis Hospital and Semmelweis district heating building construction works" results information

MIHŐ Miskolci Hőszolgáltató Kft. | Published December 17, 2014
Winner
TERRA-21 Közmű- és Mélyépítő Kft.
cpvs
45232000, 45232140, 45232142, 45232100, 45223110, 45231000, 45231100, 45310000, 45330000, 45350000

A contract to Miskolc, St. Francis Hospital and Semmelweis district heating building construction works within the framework of the EEOP 5.4.0 / Project ID No. 12-2013-0019 Subject: Miskolc, St. Francis Hospital and Semmelweis district heating building construction works of district heating pipeline construction: 2x1740 m pre-insulated wire, with an average depth of 1.5m, 10 additional substation equipment construction / installation (expansion tank, hot water tank, electric central heating control execution, etc), for construction plans, construction plans and tender documentation to be part of the tender documentation

Under a contract to the Sajópálfala, Rákóczi út 1.1 Parcel Number Monasteries of building construction works carried out - the contract amendment.

Miskolci Apostoli Exarchátus | Published October 8, 2014
Winner
ORNAMENT 2000 Építőipari, Kereskedelmi és Szolgáltató Kft
cpvs
45000000

Subject: a contract under the Sajópálfala, Rákóczi út 01.01 parcel number to carry out construction work on the building, Monasteries (Decision 1936/2013 (XII 13) on...). Amount: Smear Creator named after female monastery monastic community construction-ready building Sajópálfala, Topographical Rákóczi street number: 1.1. Phase I will be completed foundation, basement level of the building structure ready for construction. The II. During the task schedule of load-bearing walls, partitions, ceiling and roof structure design of construction, specifications, construction plan, construction permit and the budget unpriced defined according to the structure of the building.

The construction works of Clement Didák Fiúkollégiumának renewal of energy - informational award notice

Konventuális Ferences Minorita Rend | Published December 30, 2015
cpvs
09331000, 09331100, 44221100, 45331100, 45321000, 45310000, 45315100

Works and construction. "The Clement Didák Fiúkollégiumának energy renewal of the construction works of" Project Element Name related Technical parameters Solar System Grid Solar system with 6 kWp solar system Síkkollektoros system 46.2 m2 absorber surface exterior window replacement / modernization Window Replacement / modernization and incidental expenses of U = 1.6 W / m ^ 2K, 81.7 m2 surface heating / Use hot water system (s) upgrading Heat generator replacement / modernization and incidental expenses of 2 x 80 kW Subsequent outer side of insulation Ceiling insulation and incidental expenses of 2 x 6 cm thick mineral wool in the procurement process resulted in conclusion of construction contract a type of flat-rate sum, not itemized settlement.

"Miskolctapolca swimming pool construction," No. 5 contract modification

Miskolc Holding Önkormányzati Vagyonkezelő Zrt. | Published January 12, 2015
Winner
ZÁÉV Építőipari Zrt.
cpvs
45210000, 45112000, 45212212

The subject of a public procurement procedure: The retention of existing buildings, renovation and expansion of the construction of a new swimming pool. Competition Pool Establishment: Planned, newly established 50 x 25 m in size, 10-lane competition pool, 2.20 m water depth water recycling equipment (water-stressed mirror). - Competition pool size: 50 x 25m (10 x 2.5 m band) - competitive pool nominal temperature of the water (winter and summer): 26 (+ - 1) degrees C - competition pool (smooth) water depth of 2.20 m - competition pool Water quantity: 750-780Ezer m3 / year - Volume: 2 x 1000W stereo mixing console - the versenymedencénél modern water polo (4 attack time display) and building swimming competitions suitable magnet flat scoreboard equipment - sports events suitable stands (concrete, wood seating surface) to accommodate 800 spectators suitable - the pool of illumination: 1500 lux at 1 m above the water level - to ensure accident free sports opportunities for lifeguard and water guard needed - hot and cold water showers near the pool - right FINA regulations pool lights next to the mechanical space is built directly, which is based on 30 cm extends down due to piping (85 m2) 1.2. service facilities construction: The "dome" main entrance building: built in weathered wood railings and pillar-like structures between kiosk bontandóak. Inside the building planned placement of the following functions: reception sauna, steam room, massage, plunge pool, jacuzzi, Kneipp pool, relaxation beds, fitness room, cafe, ice cream parlor, cafeteria, restaurant, executive offices. The self-built saunas (cone-shaped) unit, connecting bridge to reach. The amount of the planned new building (s gross m2) Ground floor: 1,880 m2 first floor: 1,355 m2 + 290 m2 green roof sauna + 4 "funnel" each approximately 20 m2 2nd floor: 162 m2 + 610 m2 green roof Target existing "domed" - and the locker room building by levels of connectivity solution. and create a pedestrian connection across the next phase, the development of Arad walkway be established spa buildings. the planned bridge size: 165 m2 Building Module along the creek Hejő: The changing capacity: 820 people (410 men, 410 women) in view of the planned capacity: less grandstand 176 people, more bleachers: 320 people. Planned amount of new construction (gross m2 s) ground 1815 m2 first floor: 1,815 m2 second floor: 1,430 m2 green roof + 385 m2 terrace roof of artificial hills on the east side of the competition pool will be place under artificial hills installed on the functions that the operation of the pool and sporting events are necessary to conduct pool mechanical room (200 m2), chemical storage (72 m2), offices (115 m2) and a men's, women's fast-changing room block (140 m2) will be in place. The pool side stands are built on hills. A total of 360 planned seats. Total installation below ground level (s gross m2) 670 m2 earthcoverage approx 2100 m2 1.3. land use planning, landscaping, parking lot construction: the artificial hills at the pool side also start the +1.50 level, on the other side and descend to the level of 0.00. Eastern side of the hills are at the sports field. 3 sports grounds: (3 x 365 m2) = 1200 m2 of land in the north-east corner of the Arad walkway and street Görömbölyi crossroads is based on a 72-seater, gyephézagos-covered car parking. Area: 1985 m2

Construction work

MVK – Miskolc Városi Közlekedési Zrt. | Published November 26, 2015
Winner
Miskolci Zöld Nyíl 2009 konzorcium
cpvs
45000000, 45234121

"To a contract to develop the Miskolc urban tramways, within the framework of implemented EU-funded project, the extension of the reconstruction and the 1st line of existing infrastructure in urban tramways Upper Majláth station, as well as the associated entire infrastructure building, construction works according to FIDIC Yellow Book" supply and installation of power supply equipment related to the subject of contract. The description of History "Miskolc tram railway development" TOP 5.2.0-07-2008-0003 identification number of large projects in addition to the renovation of the track, line extension and reconstruction of infrastructure related to the purchase of 31 pieces performed by new modern electric vehicle, replacing with the ongoing SGP and Tatras KT8D5 types of power from the vehicle fleet. 01/31/2010 Miskolc was shipped off urban electric railway network optimization licensing and development concept plan. The construction contract is realized the power line network (underground cables and overhead line system) and this procurement process closely related to power and energy rationalization tasks (advanced power transformer stations, meter management system) will be implemented. The infrastructure required in the redevelopment of part of the energy supply network transformation rendszerűvé parallel beam system, and the related reconstruction of the AC system, which was built under the construction contract. The tramway energy supply system is powered by the power conversion equipment is built 10-30 years of care, which is currently used SGP and Tatra trams KT8D5 type of construction, in addition to power consumption parameters is currently regarded as temporary power supply system will satisfy traffic demands. The 15.2.2012. According to the contract concluded on the day of delivery vehicles procured vehicles, electricity demand in the current system has been unable to provide - much higher than the voltage drop due endpoints limits - and therefore the power system is imperative to rebuild. In accordance with the above, it is necessary to the operation of power conversion system to ensure the flow of electricity energy supply restructuring, review of existing equipment, redevelopment of the old regime. The original description of the situation in the east section of Arany Janos U.-i line, the line in the middle section of the U-Francis Jánosi of the western section of the U-fourth of the power converter. The three power stations adjacent to the converter can provide auxiliary power supply in case of a malfunction or maintenance through cooperative cable network. Based on the voltage measurement data of the farm complex and Diósgyőri stretch of trams peak time of high levels of voltage dips occur after the new trams into operation. John U. Golden-i converters: the old building, in the form of reconstruction of external necessity. Ferenc U. Jánosi-i converters: the new building, reconstruction is required. Fourth-i U. converters:

"A contract Miskolctapolca new district heating swimming pool building construction works' No. 1 contract modification

MIHŐ Miskolci Hőszolgáltató Kft. | Published April 24, 2015
Winner
DH-SZERVIZ Kft. és TERRA-21 Közmű és Mélyépítő Kft. közös ajánlattevők
cpvs
45232000, 45232140, 45232142, 45232100, 45223110, 45231000, 45231100, 45310000, 45330000, 45350000

Miskolctapolca new swimming pool heat supply building construction works of district heating pipeline construction: 2.6 2x km pre-insulated wire, with an average depth of 1.2 m, 2 heat central primary host block design (mechanical and electrical, automation working parts) as part of the tender documentation for export plans, construction plans and tender documentation. Miskolctapolca new lido district heating build (invested directly into the ground wire, signal wire design, development of heat central primary host blocks) - 2x2525 m DN200 / Ø315, possible deviations of ± 10% - 2x120m DN125 / Ø225, possible deviations of ± 10% - 2 heat central primary host block design (mechanical, electrical, automation working parts)

"In carrying out full-scale reconstruction of the building construction works Owl" result prospectus

Miskolc Megyei Jogú Város Önkormányzata | Published October 7, 2015
Winner
Gerixon Tervező és Kivitelező Kft.
cpvs
45223200, 45110000, 45262500, 45421110, 45430000, 45231100, 45233251, 45262600

Within the framework of a contract to a "Miskolc, Upper Majláth-terminus of an elevated level of service development in place to stop the building of the rehabilitation of the Owl" called, TOP 5.5.0-09-11. related to projects under construction are performing Owl building during construction works full-scale reconstruction. The contractor responsible for the Owl building in a complete reconstruction - complete demolition of 700 m2 building ground floor - Strengthening 138 m2 of basement slab, construction material and reinforcement of foundations, thermal insulation, windows and doors, building associated with geothermal heating mechanical and electrical systems - 485 m2 at ground floor: new load-bearing structure and interior partitions construction, skilled labor, complete building engineering and electrical design, barrier-free elevator installation - 373 m2 floor level: a new architecture and interior partitions construction, skilled labor, complete building engineering and electrical design - interior finishes, joinery (built-in counters, kitchenette), painting and decorating contractor shall, in addition: - in the full implementation of the investment to ensure the smooth operation of electric traffic, electric transport maintenance - The bus stop locations of temporary relocation / outsourcing, of which Bidder shall be provided at its own expense -. the operation of ticket offices during the construction period of the current container provided to maintain and, where ticket scheme locality located in the building operation of the container shipment from the Miskolc Municipal Transport Company's site - housed in the building ticket scheme village (external access option by passengers) no later than 11/30/2015 up to ensure that the absence of contractor's expense, other means should be allowed to ticket sales. The deadline for completion (successful technical delivery and acceptance): 12.15.2015. Day.

Building and construction investment - Contract award notice

B-A-Z Megyei Kórház és Egyetemi Oktató Kórház | Published December 21, 2015
Winner
FK-Raszter Építő Zártkörűen Működő Részvénytársaság;FK-Raszter Építő Zártkörűen Működő Részvénytársaság;FK-Raszter Építő Zártkörűen Működő Részvénytársaság;FK-Raszter Építő Zártkörűen Működő Részvénytársaság;FK-Raszter Építő Zártkörűen Működő Részvénytársaság;FK-Raszter Építő Zártkörűen Működő Részvénytársaság;Aszfalt Mester Építőipari Kft.;FK-Raszter Építő Zártkörűen Működő Részvénytársaság
cpvs
45000000, 45100000, 45110000, 45200000, 45215100, 45223200, 45261400, 45262700, 45300000, 45400000, 45410000, 45442100

Enterprise contract - the execution of construction projects in Borsod-Abaúj-Zemplén County Hospital and University Teaching Hospital in the first tender part pneumatic tube system expansion - Central building all work this way, the central building parts will be used in the system, thus accelerating the pattern, material flow and reduced logistics costs. 2. The tender parts of the extension tube mail system - Onko-surgical building working on the extension of the pneumatic tube system for Onko-surgery building, which join a result, the building is the hospital, has developed pneumatic tube system, resulting in acceleration of the sample material flow and reduced logistics costs . Part 3 of a contract extension pneumatic tube system - carried out between Central Building and Surgical Onko-building works (excavation and pipe laying HDPE pipe post office) are laid buried for pneumatic tube operation between the two buildings wiring system. Part 4 of a contract extension pneumatic tube system - pneumatic tube to be implemented in the Department of Pathology and Institute of Pharmacy in connection with the expansion of This reduces the pattern, material, drug transit time requirements. 5. Part tender: Surgical overlaid on the development of the building II. Designed to the floor level, related to the onco-surgery building ongoing transformation of the existing surgical operating rooms serving the premises of conversion to a more efficient operation, promote safer patient care. In addition to the onco-surgical (átfektetői) functional connections with existing attic rooms designed for medical makeover and their associated helyiségeivé öltözőkké, átközlekedő appropriate design of the surgical wing of the building toward the north. 6. tender part: Main Building offices of the partial transformation of the South Building ground floor tract and first floor level stretch full of quality of services, in order to improve the quality of working conditions, establishment of an internal restructuring of offices, existing facilities modernization and reconstruction - along with the administration centralization - planned . 7. Road construction sub-contract renewal to be installed during the renovation and new wearing course of the roadway there are two sinkholes that need to be cleaned and should also be highlighted. The renovated road horizontal lines of the following: • 0 + 000-0 + 073 73 m straight section 8. bid: Central Warehouse building has been partially updated

"Miskolctapolca 46063/8 hrsz. n lido and sports field irrigation network construction" No. 2 contract modification

Miskolc Megyei Jogú Város Önkormányzata | Published May 20, 2015
Winner
Z-Kapos Kft.
cpvs
43323000, 45212200

A brief technical content: 1. Watering Network Design and construction of the 46063/8 u n realized "Swimming pool, locker room building, hills house building" to care resulting in investments for the construction of green areas, swimming pool used to be developed to store the gray water water (about 10.000 m2 irrigated zöldfelületünk It is which 20% will coppice (drip tube irrigation) and 80% lawns (spray irrigation) Winning bidder must also plan to be carried out irrigation network The cost for the offer price bekalkulálandó cost Place of performance before construction... Miskolctapolca, topographical .: 46063/8 2 Foot tennis courts (2) the construction of substructure works, track fund fibrillated multisport synthetic grass cover, track accessories. Beach volleyball court (2) the construction of substructure works, track base, creating seepage blanket the finished mirror 0/1 mm particle size distribution sand with an average of 35 cm thick, course accessories.