Call +44 800 9755 164

Public tenders for construction in Kalocsa Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Kalocsa 24 people living center construction work

Kalocsai Szociális Szakellátási Központ | Published November 12, 2014
cpvs
45000000

"Kalocsa, Mill Street residential institutions to replace" part of SIOP-3.4.1-11 / 1-2013-0001 number of applications, "J. Mócsy u. 2 / E. , lot number 1169/2-U-Plan property under number 24 people in residential building construction work centers "a total floor area of ​​735.27 m2.

Based building construction contract design and construction of energy development in the Upper Section of the building of Szakmári Primary School under the EEOP 2014-4.10.0 / F support scheme. - Information on the contract amendment.

Szakmár Község Önkormányzata | Published June 19, 2015
Winner
Fehérép Kft.
cpvs
45000000, 45310000, 45312310

Based building construction contract design and construction of energy development in the Upper Section of the building of Szakmári Primary School under the EEOP 2014-4.10.0 / F support scheme. Major work by gender and quantities (for information only): • 702 m2 facade insulation 10cm EPS sheets • 129 m2 plinth insulation of 10 cm XPS plate • 372 m2 attic floor insulation 2 x 10 cm mineral wool insulation plate • 29 m2 flat roof insulation 15cm EPS plate • 65 pcs Installing replacement windows • 4 kW solar system for detailed terms and conditions of the tender documents (contract and technical specifications in public-procurement) were recorded.

No. 1, a contract amendment 'Children's Home Kalocsa development. Plumbing completion of the modernization implementation, the conditions of life in care and professional responsibilities conditions of construction works to improve "

EMMI Kalocsai Gyermekotthon, Általános Iskola és Szakiskola | Published December 23, 2015
Winner
Kalo-Bau Kft.
cpvs

Kalocsai Children's Home to develop, implement sanitary facilities modernization, in care of the living conditions and the conditions of carrying out a professional task was to improve the SIOP-3.4.2-11 / 1-2012-0288 identification number of construction works for the project

Kalocsa- DAOP-2.1.1 / G 13-2013-0001- "Kalocsa Heart Program" Schöffer reconstruction of tower construction installation time worker 2015. Contract award procedures.

Kalocsai Vagyonhasznosítási és Könyvvezető Kft. | Published July 3, 2015
Winner
Generál Építőipari Kft.
cpvs
45000000

The subject of the public procurement: Kalocsa- DAOP-2.1.1 / G 13-2013-0001- "Kalocsa Heart Program" Schöffer reconstruction tower construction installation time worker 2015. The amount of purchases: Schöffer tower construction installation works of reconstruction: 6300 Kalocsa, malathion map 1. cybernetic light tower under reconstruction corrosion protection of structures, upgrading electrical systems. The detailed technical parameters and expectations of contracting include technical documentation and unpriced budget plan which is part of the documentation.

"Kalocsa Heart Program" of DAOP-2.1.1 / G 13-2013-0001 identification number of projects under the Culture and Event Center and Sycamore fountain construction and installation works. Information amending treaty.

Kalocsai Vagyonhasznosítási és Könyvvezető Kft. | Published June 8, 2015
Winner
Kalo- Bau Kft.
cpvs
45000000

The implementation of a contract under the "Kalocsa Heart Program" of DAOP-2.1.1 / G 13-2013-0001 identification number of projects in Sycamore and Cultural Events Center and fountain construction and installation works of the following criteria, as specified in the documentation. - Event center useful area: 276.47 m2. - Terraces area: 236.78 m 2 - 1 Fountain - 1 powerhouse - 1 engineering construction of the mine tasks are presented in detail in the documentation. Contracting margin is determined by the extent of the net lump sum compensation of 5%.

The OP's related-2.1.1 / G 13-2013-0001 identification number, the "Heart of Kalocsa Program" in implementation of the project kalocsai Sycamore Culture and Events Center and fountain construction and installation works

Kalocsai Vagyonhasznosítási és Könyvvezető Kft. | Published October 10, 2014
Winner
Kalo- Bau Kft.
cpvs
45000000

Implementation of a contract under the "Kalocsa Heart Program" of SGPOP-2.1.1 / G ID No. 13-2013-0001 project Sycamore Culture and Events Center and fountain construction and installation works by taking into account specified in the documentation. - Events center floor area: 276.47 m2. - Decking area: 236.78 m2 - 1 Fountain - 1 powerhouse - one piece construction of the mine engineering tasks are described in detail in the documentation. Extent contracting margin is determined by the net lump-sum compensation of 5%

The implementation of a contract under the "Kalocsa Heart Program" of DAOP-2.1.1 / G-ID No. 13-2013-0001 project in Sycamore and Cultural Events Center and fountain construction and installation works. Information amending treaty.

Kalocsai Vagyonhasznosítási és Könyvvezető Kft. | Published September 11, 2015
Winner
Kalo- Bau Kft.
cpvs
45000000

The implementation of a contract under the "Kalocsa Heart Program" of DAOP-2.1.1 / G-ID No. 13-2013-0001 project in Sycamore and Cultural Events Center and fountain construction and installation works of the following criteria, as specified in the documentation. - Event center useful area: 276.47 m2. - Terraces area: 236.78 m2 - fountain 1 - 1 powerhouse - 1 engineering in the manhole construction tasks are described in detail in the documentation. The extent of contracting a margin determined by the net lump sum compensation of 5%.

Kalocsa- design DAOP-2.1.1 / G-13-2013-0001- "Kalocsa Heart Program" Bishop's Garden Reception Building, construction installation time worker Prospectus 2015 amending the contract.

Kalocsai Vagyonhasznosítási és Könyvvezető Kft. | Published October 16, 2015
Winner
Generál Építőipari Kft.
cpvs
45000000

The subject of the public procurement: Kalocsa- DAOP-2.1.1 / G-13-2013-0001- design "Kalocsa Heart Program" Bishop's Garden Reception Building, construction installation time worker 2015. The volume of public procurement: Development of Bishop's Garden Reception Building construction installation works. Size: 324.2 m2. A detailed technical parameters and expectations of contracting as part of the technical documentation, project documentation, building permits (3782-7 / 2014 / H; ÉTDR ügyazonosító: 201400068688; ÉTDR document identification number: 000 549 391 IR / 2014) and include unpriced budget.

Kalocsa- design DAOP-2.1.1 / G 13-2013-0001- "Kalocsa Heart Program" Bishop's Garden Reception Building, construction installation time worker of the results of 2015. Reference process.

Kalocsai Vagyonhasznosítási és Könyvvezető Kft. | Published June 29, 2015
Winner
Generál Építőipari Kft.
cpvs
45000000

The subject of the public procurement: Kalocsa- DAOP-2.1.1 / G 13-2013-0001- design "Kalocsa Heart Program" Bishop's Garden Reception Building, construction installation time worker 2015. The volume of public procurement: Development of Bishop's Garden Reception Building construction installation works. Size: 324.2 m2. The detailed technical parameters and expectations of contracting as part of the technical documentation, project documentation, building permits (3782-7 / 2014 / GB; ÉTDR ügyazonosító: 201400068688; ÉTDR document identification number: 000 549 391 IR / 2014) and include unpriced budget.

"Kalocsa, Mill Street residential institutions to replace" part of SIOP-3.4.1-11 / 1-2013-0001 application with code "Mócsy u. 2 / E (u. 1169/2) 24 people living center construction work

Kalocsai Szociális Szakellátási Központ | Published March 18, 2015
Winner
Kalo-Bau Kft.
cpvs
45000000

"Kalocsa, Mill Street residential institutions to replace" part of SIOP-3.4.1-11 / 1-2013-0001 number of applications "Mócsy u. 2 / E. planned, u-u 1169/2 property under number 24 persons living center building construction works for a total of 735.27 m2 area

Implemented as part of supply SZM No. 1 EEOP-5.5.0 / A / 12-2013-0172 identification number "Building Energy Kalocsán development" in project construction work technical supervision duties.

Kalocsa Város Önkormányzata | Published April 29, 2015
Winner
Épinber Kft.
cpvs
71631000, 71631300

The performance of an agency contract to be implemented within the framework / EEOP-5.5.0 / A / 12-2013-0172 identification number "Building Energy Kalocsán development" project construction work on technical inspection duties. The project Kalocsa City administrative area of ​​Csokonai street kindergarten, Green Wood Street Centre and St. Stephen's High School is located in relation done building energy refurbishment (mainly post outer side of insulation, exterior doors and replacement, upgrading heating / hot water / cooling system agents, lighting systems, energy efficient Makeover). Task: Acting on the basis of task implementation plan approved by the Principal's documentation, the winning bid for construction works contractor 191/2009. By (IX. 15.) Government Decree technical inspection activities and performing the related coordination tasks. The conduct and, if necessary contribution to the success of the licensing procedure put to use technical handover procedure.

Kalocsa- framework "Kalocsa Heart Program" of DAOP-2.1.1 / G-ID No. 13-2013-0001 Érsekkert reconstruction project, mélyépítések- 2015 amending the Prospectus contract.

Kalocsai Vagyonhasznosítási és Könyvvezető Kft. | Published August 26, 2015
Winner
Aktív Kft.;TriGon Invest Kft.
cpvs
45000000, 45223300, 45213316, 45221000, 45316200, 45332200

Procurement subject: Under Kalocsa- "Kalocsa Heart Program" of DAOP-2.1.1 / G-ID No. 13-2013-0001 Érsekkert reconstruction project, the amount of public procurement mélyépítések- 2015: Part 1: Csilláspark tourist reception site parking and bus design. - Bus parking building concrete cover 12 parking spaces - bus parking approach asphalt texture road course - Constitution street road reconstruction asphalt texture coating - sidewalks and paving concrete paving paneling - 10 cars parking parking design space stone pavement - road signaling and guiding signs, equipment placement , painting of road markings - gardening 6046.5 m2 - public lighting and construction of power transmission - downpipe 369 m - water challenge - telecom network reconstruction Foktői road bridge reconstruction, widening due to design pedestrian and bicycle passage adventure - construction installation works. - Full length 68.85 m - free slots: 12.50 m - water vízgépészet- game - electrical work - lighting - boat dock stairs renovation - renovation Foktői pier road - Sörház public areas and connection handler tourist zones, construction installation works. - Foktői road Overall length: 121 m - Sörház public overall length 91.74 m - and parking - sidewalk - gardening 9929 m2 - water pipe reconstruction - rainwater - street lighting and transmission construction - the acquisition, placement of Part 2 of street furniture: Astral space and Bishop's Garden road construction installation works to develop tourism attraction. - Gardening munkák- 1 m2 of housing construction 4709 - gardening landscaping 1173.5 m2 - construction of retaining walls and hills - the acquisition, placement of street furniture - Astrik map of road construction along the entire length: 198.8 m - storm water drainage - lighting and power transmission construction 2.2. Érsekkert reconstruction of construction works. - Fencing - the purchase of street furniture placement - existing concrete bridge renovation - parking construction: 2338.9 m2 - gardens and landscaping 33,500 m2 - stone building 6874.5 m2 - rainwater, -ivóvízellátás and sewage construction according to plan - public lighting and power transmission construction

Kalocsa- framework "Kalocsa Heart Program" of DAOP-2.1.1 / G-ID No. 13-2013-0001 Érsekkert reconstruction project, mélyépítések- 2015. Contract award procedures.

Kalocsai Vagyonhasznosítási és Könyvvezető Kft. | Published June 29, 2015
Winner
Aktív Kft.;TriGon Invest Kft.
cpvs
45000000, 45223300, 45213316, 45221000, 45316200, 45332200

Procurement subject: Under Kalocsa- "Kalocsa Heart Program" of DAOP-2.1.1 / G-ID No. 13-2013-0001 Érsekkert reconstruction project, the amount of procurement mélyépítések- 2015: Part 1: Csilláspark tourist accommodation and bus parking design. - Bus parking building concrete cover 12 parking spaces - bus parking approach asphalt texture road course - Constitution street road reconstruction asphalt texture coating - sidewalks and paving concrete paving paneling - 10 Car parking parking lot design space stone pavement - road signaling and guiding signs, equipment placement , painting of road markings - gardening 6,046.5 m2 - public lighting and construction of power transmission - downpipe 369 m - water challenge - the reconstruction of telecommunications network Foktői road bridge reconstruction, widening due to design pedestrian and bicycle passage adventure - Building installation works. - Total length: 68.85 meters - a free slot: 12.50 m - vízgépészet- fountain - electrical work - lighting - boat dock staircase renovations - renovations Foktői pier road - Sörház public areas and connecting handler tourist zones, construction installation works. - Foktői road Overall length: 121 m - Sörház public overall length 91.74 m - and parking - sidewalk - gardening 9929 m2 - water pipe reconstruction - rainwater - street lighting and transmission construction - the acquisition, placement of Part 2 of street furniture: Astral space and Bishop's Garden road construction installation works to develop tourism attraction. - Gardening munkák- 1 m2 of housing construction 4709 - 1173.5 m2 gardening landscaping - Construction of retaining walls and hills - the acquisition, placement of street furniture - road construction Astrik background Total length: 198.8 m - storm water drainage - lighting and power transmission construction 2.2. Érsekkert reconstruction of construction works. - Fencing - the purchase of street furniture placement - Renovation of existing concrete bridge - building parking: 2338.9 m2 - gardening and landscaping 33500 m2 - 6,874.5 m2 building stone - storm water, sewage and -ivóvízellátás build according to plan - public lighting and power transmission construction

12 people: 1.sz contract modification

Kalocsai Szociális Szakellátási Központ | Published December 19, 2014
Winner
Kalo-Bau Építőipari és Szolgáltató Kft.
cpvs
45000000

A contract to "Kalocsa, Mill Street residential institutions to replace" part of SIOP-3.4.1-11 / 1-2013-0001 application with code "Martinovics u. (U: 1165/1) residential home construction work for 12 people "12 seater residential home construction, the total gross floor area: 483.8 m2.

Kp 1SZ Service. VSZM

Kalocsai Szociális Szakellátási Központ | Published November 18, 2015
Winner
Generál Építőipari Kft.
cpvs
45000000

Enterprise agreements / "Kalocsa, Mill Street residential homes for replacement" SIOP-3.4.1-11-1-2013-0001 identification number of applications including: Part I. task of Kalocsa, 1232/11 and 1232/32 u-ú property existing buildings, demolition építmé-ones designed for the u-ú 1232/32 Residential property Intellectual Disability In-institutional service center building construction works of installation, II. sub-tasks: the Kalocsa, Kossuth Lajos u. 40. I lh. Ground floor. 3 (u: 1241) condominium building in the development of two-person apartment construction works. The amounts included in the construction plan documentation

Kalocsa- framework "Kalocsa Heart Program" of DAOP-2.1.1 / Project ID No. 13-2013-0001 G-06 Schöffer Museum redevelopment, renovation-time worker Prospectus 2014 amending the contract.

Kalocsai Vagyonhasznosítási és Könyvvezető Kft. | Published September 11, 2015
Winner
Generál Építőipari Kft.
cpvs
45000000

The subject of the public procurement: As part of Kalocsa- "Kalocsa Heart Program" of DAOP-2.1.1 / Project ID No. 13-2013-0001 G-06 Schöffer Museum redevelopment, renovation-time worker 2014. The amount of purchases: Key areas of work: building demolition, foundation , load-bearing walls and partitions construction, construction of reinforced concrete structures, Ácsszerkezetek construction, flashings, roofing, installation, plastering, tiling, painting, electrical, mechanical assembly 657.25 m2 net floor area closing systems. A detailed technical parameters of contracting and design documentation requirements in the technical part of the dossier (s), a building permit (s) and unpriced budget (s).

Kalocsa- DAOP- Schöffer Museum felújítása- 2014 conference proceedings result.

Kalocsai Vagyonhasznosítási és Könyvvezető Kft. | Published February 2, 2015
Winner
Generál Építőipari Kft.
cpvs
45000000

The object of the procurement: Under Kalocsa- "Kalocsa Heart Program" of SGPOP-2.1.1 / G-06 Project ID No. 13-2013-0001 Schöffer Museum redevelopment and renovation of public procurement, the amount of time worker 2014. Key areas of work: building demolition, foundation load-bearing walls and partitions construction, construction of concrete structures, Ácsszerkezetek construction, flashings, roofing, building, plastering, tiling, painting, electrical, mechanical assemblies net floor area of ​​657.25 m2 closing systems. The detailed technical parameters and contracting requirements include technical design documentation as part of the documentation (s), a building permit (s) and unpriced budget (s).

tájer

Kalocsai Szociális Szakellátási Központ | Published April 8, 2015
Winner
Generál Építőipari Kft.;Generál Építőipari Kft.
cpvs
45000000, 45215200, 45262700, 45111100

Contract agreements / "Kalocsa, Mill Street residential institutions to replace" SIOP-3.4.1-11-1-2013-0001 identification number of applications including: part I. task of Kalocsa, 1232/11 and 1232/32 u-u property existing buildings, demolition építmé-ones designed for the u-u 1232/32 property Intellectual Disabilities Residential In-institutional service center building construction works of installation, II. subtasks: Kalocsa, Lajos Kossuth. 40. I lh. Ground floor. 3 (u: 1241), a condominium building in the development of two-person apartment construction works. The amounts included in the detailed design documentation

1SZ 24 people. VSZM

Kalocsai Szociális Szakellátási Központ | Published November 18, 2015
Winner
Kalo-Bau Építőipari Kft.
cpvs
45000000

"Kalocsa, Mill Street residential institutions to replace" part of SIOP-3.4.1-11 / 1-2013-0001 number of applications "Mócsy J. u. 2 / E. designed 1169/2 u-u-person residential property under number 24 Centre building construction works for a total of 735.27 m2 site

tájer - Additional works for 8 people

Kalocsai Szociális Szakellátási Központ | Published June 19, 2015
Winner
Kalo-Bau Építőipari és Szolgáltató Kft.
cpvs
45000000

A contract, "Kalocsa, Mill Street residential institutions to replace" part of SIOP-3.4.1-11 / 1-2013-0001 number of applications, "Petofi Sandor u. (U: 638) under the number 46. 8 people in residential home building, creating additional construction works