Public tenders for construction in Eger Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Waste-treatment plant construction work

Heves megyei Regionális Hulladékgazdálkodási Társulás | Published March 24, 2016
cpvs

construction waste treatment plant

Guest house and storage building construction

Egri Borvidékért Alapítvány | Published November 28, 2014
Winner
Tengely-Közmű Kft.
cpvs
45000000

A contract to the "Guest house and storage building construction" adopted procedure

"Accommodation and stable construction of Kisköre" Change # 4 - information notice on a contract amendment

Falusi Élet Iskolája, Pályaválasztást Segítő Alapítvány | Published September 23, 2015
Winner
Bódi Művek Kft.
cpvs
45210000

Subject: supply of "accommodation and construction of stables Small Circle" project construction tasks Quantity: construction of accommodation: 68.91 m2 useful floor area of ​​construction Stable: 68.42 m2 useful floor area

Information regarding contract modification of No. 3 - "Accommodation and stable construction of Kisköre"

Falusi Élet Iskolája, Pályaválasztást Segítő Alapítvány | Published April 29, 2015
Winner
Bódi Művek Kft.
cpvs
45210000

Subject: supply of "accommodation and construction of stables Small Circle" project Volume of construction tasks: construction of accommodation: 68.91 m2 useful floor area of ​​stables building: 68.42 m2 net floor area

Information on "Accommodation and stable construction Small Circle 'No. 2 contract modification

Falusi Élet Iskolája, Pályaválasztást Segítő Alapítvány | Published April 3, 2015
Winner
Bódi Művek Kft.
cpvs
45210000

Scope: the performance of "Small Circle Hotel and barn building" project construction tasks Quantity: accommodation building: 68.91 m2 total useful floor area Housing Construction: 68.42 m2 total useful floor area

Information on the number 1 contract amendment - "Accommodation and stable construction Small Circle"

Falusi Élet Iskolája, Pályaválasztást Segítő Alapítvány | Published March 18, 2015
Winner
Bódi Művek Kft.
cpvs
45210000

Scope: the performance of "Small Circle Hotel and barn building" project construction tasks Quantity: accommodation building: 68.91 m2 total useful floor area Housing Construction: 68.42 m2 total useful floor area

Accommodation and stable construction Small Circle - information on the outcome of the proceedings

Falusi Élet Iskolája, Pályaválasztást Segítő Alapítvány | Published March 18, 2015
Winner
Bódi Művek Kft.
cpvs
45210000

Scope: the performance of "Small Circle Hotel and barn building" project construction tasks Quantity: accommodation building: 68.91 m2 total useful floor area Housing Construction: 68.42 m2 total useful floor area

Violent construction of the Integrated Government Services, Erzsébet tér No. 2. office building at

Heves Megyei Kormányhivatal | Published July 29, 2015
Winner
Ertamil Kft.
cpvs
45210000, 45300000, 45400000

Subject: Violent County Government Office, Violent, Erzsébet tér 2. 289/2 u. Integrated support of government property under construction. Quantity: Violent, 289/2 u. registered under, naturally 3360, Erzsébet tér property under number 2 position Ground floor. 292.2 m2 indoor construction works; 125.32 m2 outdoor work

"SIOP 2.2.8 / 14" Infrastructure improvements to achieve "Proposals related to the implementation of road and pavement construction tasks' results information

Markhot Ferenc Oktatókórház és Rendelőintézet | Published December 16, 2015
Winner
Euro Campus Kft. és Imola Konstrukt Kft. közös ajánlattevők
cpvs
45233200, 45233251

Francis Hospital Markhot related to the implementation of related implementation "SIOP 2.2.8 / 14" Infrastructure improvements to achieve "tender for road and pavement construction tasks roads and pavement construction tasks to carry out the volume of purchases for roads and pavement construction work in the context of a contract to Francis Markhot Hospital-related "SIOP 2.2.8 / 14" Infrastructure improvements to achieve "tender for the implementation of road and pavement construction tasks. The trip marked "B" building of asphalt pavement, a road marked "B" Charles Minaret -Knézich u. from the path marked "A2" is connected. Optional part: "A2" signal path between sections 0 + 150 + 000 0 Construction of asphalt pavement. Main implemented tasks "B" marked for road construction asphalt surface: - Length: 104.28 m - Width: 6.10 m parking building ground stone covering: - vertical: a total of 14 parking spaces, which related to two pieces of seamless that road drainage system Building - KGPVC main pipe - Surface sinkholes Optional part: "A2" signal path between sections 0 + 150 + 000 0 Construction of asphalt pavement: - Length: 150.00 m - Width: 6.10 m parking space masonry construction - perpendicular: a total of 50 parking spaces, of which five related pieces that road unobstructed drainage system construction - KGPVC main pipe - Surface sinkholes

TEE "Eger Castle and fortification tourist attractions DEVELOPMENT - CONSTRUCTION" ÉMOP-2.1.1 / A-09-2F-2011-0001 IDENTITY OF THE CALL FOR RELATED TASKS FOR IMPLEMENTING CONSTRUCTION

Eger Megyei Jogú Város Önkormányzata | Published October 2, 2015
Winner
Imola Konstrukt Kft. - Imola Építő Kft. - Euro Campus Kft. közös ajánlattevők
cpvs
45200000, 45212314, 45111000

The Castle of Eger fortress and development of tourist attractions - production "implementation tasks related to the implementation of ÉMOP-2.1.1 / A-ID number from 2011 to 0001 09-2f-called tender a contract to implement pótmunkáinak, as described below, according to the findings uncovered many cases did not possible implementation in accordance with the original plan. As regards contracting tasks within the framework of the contract modification initiated the contract modifications, and intends to conclude a contract for additional work not included in the szerződésmódosításba additional work under this procedure. Fine bastion regarding: the need to perform additional walling wall section, falszövet repair. The burden worse shape in terms of the World Cup. szögtámfalak transfer lateral loads, previously reinforced concrete, steel beams and planning structures became necessary. It should be considered in connection with the construction of a retaining wall of this nice uncle southern wall outrigger beams and beam building wreath In addition, the need for it, which is justified by structural plans. Turkish Garden respect to: the restoration phase of Mine Corridor excavated cellar: The final construction plans, also referred to previous exploration work and after the archaeological research of the shaft monitoring falazatait corridor (natural stone) must be restored. After the charged state of maturing stage and pit excavated corridor of the work to be performed are defined. Turkey asked for the city wall:

Cycle path construction work

Eger Megyei Jogú Város Önkormányzata | Published October 2, 2015
Winner
DTRT Vízépítő és Környezetgazdálkodási Kft.
cpvs
45233162, 45233161, 45233260, 45233340

Perform 'works contracts, the "number of ÉMOP-2.1.1 / B-12-2012-0158 bike in the Bükk average bicycle through the city' project on foot and by bicycle road construction tasks. - Additional purchase - Soil compaction and Geo showdown in Eger, Felnémet bike path, Lidl roundabout - the section between Tárkányi way. ". The negotiated procedure without a contract notice pursuant to § 94 paragraph (3) a) conduct. Eger Municipality Contracting earlier, 09/12/2014. day of the 2014/107. Call Procurement Bulletin No. KE-18972/2014 File No published proceedings related works which are the subject of the present action to perform. Conditions not contained in a contract concluded construction of the subject of, but not unexpected: under this procedure, in Part 2, in respect of the Eger-Felnémet bike path (H-KF / UT / NS / B / 546/57 No / 2012 building permit.) for additional works or services required for order fulfillment of works which can not be separated from the previous contract for additional works on technical grounds without major difficulties affecting the contracting authority. Due to unforeseen technical reasons, the contract concluded work at issue in these proceedings can not be separated for the following reasons: changing the Felnémeti bike path stage technical content of implementation, as follows: Project area affected by the amendment: Eger, Felnémeti bike path, Lidl roundabout - Section between Tárkányi road. Building permit number: H-KF / ROAD / NS / B / 546/57/2012: - land improvement, the establishment of adequate load bearing layer - geotextile showdown, átszúródásának the pavement by vegetation to prevent the long-term sustainability of conservation. Additional justification for the conduct of procurement: The technical content növeléssel ensure the sustainability of the project and indispensable for its implementation. (Section numbers of the technical content area of ​​intervention includes the technical inspection justification.). The technical content növeléssel the investment in the short and long-term durability can be ensured.

Eger, Servita u. Construction of a retaining wall under No 42

Eger Megyei Jogú Város Önkormányzata | Published May 29, 2015
Winner
Geoteam Kft.
cpvs
45200000, 45262620

Enterprise Contract "Mouse, Servita u. Construction of a retaining wall under number 42. "The main subjects for work at the volume of purchases - Basic Pit boost - 96.5 m3 - Making Reinforcement assembly 20mm diameter - 6.8 t - Manufacturing C30 / 37 XC2-16 F3-reinforced concrete footing - 22 5 m3 - ZSE-40 reinforced shutters stone retaining walls and pillars Building H-50 mortar, grouted surface C30 / 37 XC2 kibetonozással - 89 m3 - floating stone concrete backfill construction of masonry at the same time, 40% of stone and concrete rubble bedolgozással - 32 m3 - Shuttering blocks Items concreting C30 / 37 XC2-16-F4-ductile concrete transport, compressed utókezelve - 71 m3 The detailed specifications of the tender documents and annexes included. Contracting 306/2011. (XII. 23.) recorded on the basis of § 7 of the Government Decree. Reservation, a margin that does not want to end up the subject of the proceedings. Contracting authority shall notify tenderers that the invitation to tender, as well as article of manufacture as defined in the documentation, references to type only taken to identify clearly the nature of the subject. Contracting 310/2011. Pursuant to Regulation (XII. 23.) on. § 26 (6) accepts everything with equivalent products. Brand, origin, type of thing, process, activity, person, or patent or trademark possible reference to the subject matter defined in the technical specifications for public procurement in order to define clearly the nature of, in addition to the designation, the words "or equivalent" must be understood in any case! The referenced standards, technical approvals, regulations, recommendations designation by the words "or equivalent" can also be understood in any case.

Subject of a contract for construction tasks Eger District Court window replacement

Egri Törvényszék | Published October 10, 2014
Winner
Skyablak DL Kft.
cpvs
45421100

Replacing doors and windows specified 3) documentation that the subject of a contract for construction tasks Eger District Court the following window replacement of detail: Material: Plastic ablak6 air chamber, the profile of 5-chamber frame and sash, minimum 70 mm thick. Collision Type: Water Drain blanket, Glass: Float 4 - Argon 16 - 4 Float, Low-E Ug = 1.0 Color: white (RAL 9001) Combination Water: for system Hardware: Roto or SIEGENIA Handle Hoppe window handle (aluminum ) and other works only inside. The newly installed windows párkány- external and internal connections armrest should be resolved similarly to the previously exchanged windows. Necessary for the installation and dismantling of masonry repairs, painting the dispersion preparation and on-site control of the dimensions of the surfaces, the Contractor is responsible. In addition to furniture and equipment in the area to protect the coarse and the Contractor shall provide the Free cleanup. Additional conditions: The institute takes place continuously active work schedule agreed and approved in accordance with the district court. The Customer will ensure the transportation of building materials using an elevator contractor for the following conditions: The elevator is used together with the staff of the court. The lift must be provided within OSB cover against possible damage during the construction period. Lockable storage does not provide the district court. Condition of the employee shall be entitled to enter the names and details of vehicle (registration number, type) rating. The on-site work should be organized to daily workers in the building of their work the least interfere with the contractor.

TEE "Development of the Primary Health Care in the Walloon travel medical clinic" in ÉMOP-4.1.1 / A-12-2013-0048 identification number of construction projects (construction) works "

Eger Megyei Jogú Város Önkormányzata | Published April 10, 2015
Winner
ERTAMIL Ingatlanforgalmazó, Építőipari Szolgáltató és Kereskedelmi Kft.
cpvs
45000000, 45200000, 45210000

"A contract to the" Development of the Primary Health Care in the Walloon travel medical clinic "in ÉMOP-4.1.1 / A-12-2013-0048 identification number of construction projects (construction) works" Procurement quantity: less than No. 4, u-U 1313 property located family doctor's office renovation of current status in the individual units separate main entrance, but inside the building in a service corridor are linked. - In addition to building barrier-free parking is 1, which marked the sign. - Due to the existing ramps of them (9.75%) no longer meet the accessibility current specifications - the current 40 × for 40 cm concrete sheeting laid pavement fragmentation and roughness does not meet the accessibility standards - During the 1990s, was rebuilt to the south facade full length terrace built. The building floor insulation below the terrace level of the bottom wall section of the insulation was not created, so rainwater is absorbed from the terrace to the front wall of the hall ~ 1.00 m and height of the wet plaster is táskásodva. - The existing 55 mm thick. tokszerkezetű plastic front doors and windows U = 1,8W / m2K> 1,60W / m²K, combined wing windows U = 2,45W / m2K> 1,60W / m²K, therefore, on the north façade does not meet current building energy requirements. - The east-west facade; Di and out side the insulated B30 blokktéglán 4 cm thick. polystyrene foam insulation material is U = 0.73 W / m2K> 0.45 W / m2K, that does not meet the current building energy requirements. - Both surgery unit has unobstructed sink, but their design is not appropriate. - After the layer structure set straight layered flat roof exploration: 19 cm "PS" födémpalló, 25-40 cm slag charging, 7 cm top concrete, 2 layers. waterproofing, insulation 5 cm, the new flat roof waterproofing generally satisfactory condition. - The current building energy Classes F (average). RENOVATION WORK PLANNED TO BE CARRIED OUT IN CONNECTION front of the building on the existing parking lot, 2 car park barrier-free design, common checkout lanes. Building a new ramp system in accordance with accessibility aids formula. The construction of new sidewalks in accordance with accessibility aids formula. The internal areas of the south terrace contact length defeat of the plaster ~ 1.00 m (at least over the felnedvesedés 20 cm) high. The internal plastering can be started only after complete drying brick wall! Existing facade and wood. Expand plastic windows, replacing them with modern, new windows and increased insulation of the placement of the plane frame structure outside, exposed to the external plaster should be adjusted! The thermal insulation of walls can be commenced only after inspection and repairs carried out after the repaired surfaces are completely tethered to dry! The tables provided with STO equipped glass fiber reinforced coating system. Currently, the canopy roof drain baskets missing them after cleaning the drain pipe, drain old to be fit to make up a complete set! The basin formed a barrier-free sanitary ware, sanitary ware and sink in another partition relocation prescribed. The purity of the painting planned renovations to the building structural system is not affected. During the renovation of the building's exterior and its shared water supply system remains unchanged. On the internal system of the entire pipe network reconstruction szerelődik. The collectors are on top of the building (flat roof) are in two groups. Due to relocation of facilities in these places is necessary to amend the sewage. During the renovation of the building's drainage network remains unchanged. However, some of the radiator valves will be renewed visszaszerelésre system. The old ones will remain unchanged but will be transferred to the new feed-in hubs.

Environmental monitoring other than for construction

Heves megyei Regionális Hulladékgazdálkodási Társulás | Published August 7, 2015
cpvs
90711500, 90733700, 90513000, 77310000

Nem építkezéssel kapcsolatos környezeti monitoring

The subject of a contract to the District Court Gyöngyösi window replacement construction tasks

Egri Törvényszék | Published October 7, 2015
Winner
SKYABLAK DL Kft.
cpvs
45421100

The subject of a contract to the Gyöngyösi District Court window replacement construction tasks Replacing the Gyöngyösi District Court Building doors and windows specified (3200 Kossuth út 44.) documents the following detailed inspection: The specified solutions with other technically equivalent products especially are, but that the existing doors and windows appearance and quality - the 3/2003. (I, 25.) According to the joint BM-GKM-MEW, product manufacturers, suppliers' declaration of conformity for placing on the market of substantiated - must be equal to the full. The newly-built window sill connection of external and internal párkány- to be resolved, like the windows had changed. Due to the required dismantling and installation of masonry repairs, dispersion paint preparation and spot checks on the dimensions of the surfaces of the Contractor is responsible. Bútormozgatást and protection, curtains and curtain rods required for the decommissioning of the window replacement must be performed by the Contractor shall include the costs of the offer price. In addition to furniture and appliances in the areas of coarse protection and cleanup of the Free Contractor must provide. Further conditions for operational work of the institutions being constantly negotiated and approved the schedule according to the district court. Building access. Condition of the employee shall be entitled to enter the names and vehicle information (license plate number, type) rating. The on-site work should be organized daily workers in the building to prevent the least of their work the contractor. Weekend work will be ensured if it is three working days before the Eger indicate in writing to the Tribunal.

TEE "a contract to develop the Dental surgery Eger, a ÉMOP-4.1.1 / A-12-2013-0021 identification number project entitled Technology House construction (construction) works"

Eger Megyei Jogú Város Önkormányzata | Published April 24, 2015
Winner
Zele Bau Kft.
cpvs
45000000, 45200000, 45210000

"A contract to develop the Dental surgery Eger, in the House of Technology was ÉMOP-4.1.1 / A-12-2013-0021 identification number of construction projects (construction) works" Procurement quantity: House of Technology, dental surgeries FÖLDSZINTI REGIONAL AND UPGRADING OF EXISTING accessibility of INSTALLATION around the inner core közlekedőről flow through the open office areas. The entire flat roofed buildings. The front panel finish for aged and in need of renovation. The current building mass-changing transformation involving the proposed conversion Fund is not being made, the weight of the original building remains. The two office spaces and the toilet over the same közlekedőről. During the renovation, the interior doors are replaced with partially full of doors and windows. In this context, the barrier-free parking, building approach, in that access to and use of the above-mentioned areas of the well will be constructed. The door between the waiting room and the lobby corridor will also be asymmetric opening, flanked by fixed deposits. The district employees at dental surgeries (6 men & 16 women) corresponding to the existing premises as staff are able to serve, so they are not affected by the conversion. Planned number of patients (40 men & 15 women average) due to the existing sanitary supplies, so they can not be converted. The conversion of the existing heating network is not affected. The development of a new sanitary and sterilization of water, waste water supply will be solved with existing internal network connections. The existing access points in the plan candidates from the wall of the existing lines will be demolished and the new lines are constructed falhoronyba flush. The pipeline corridor going to drive obscured drywall. Hot-water supply within the building will not change, not the design task. The vent pipe passes under the drywall ceiling obscured, and the corner of a room is vertically drained the sill, here are removed through a ventilation grille. The fan has a non-return valve. During the renovation of the building part electrical connection capacity is not significantly changed. The renovation is not designed for measurement. Currently 3x63A-to-pass current value is. Replacement is not planned. Matt Light 1pc 5x16mm2 hoses fed by a network of the affected area, another Mt 5x16mm2 wire and covers the area medikai- and transmission network. The existing site should be designed according to the new plan detailing masked, sheet metal housing main distribution equipment. The main distribution apparatus in accordance with BS 2040 standards, special lighting and power (medial) network are powered from a sub-distribution facilities located in surgeries. Plan every clinic receive special aleosztót, which gave the room (room group) are powered from a power consumer endpoints. The distributors will have separate lighting and separate power feeds. The compressor must be supplied to the corresponding distribution from surgery. Surgeries are not concerned with the renovation of the existing spaces circuit connections to be explored, and the existing pipe ends to be clamped to the new strip. The renovation is not designed to be water block feeding the wires to compile the new main distribution equipment. (Existing boiler feed to get fixed, it is not necessary to install software switch) the circulation areas of lighting network linking the planned reception room. The design of the affected area Pipelining: To stop plugs flush-III Detachable protective tube pulled happen. The luminaires to stop channel quality DLP happen. The switching of lighting equipment is going to happen in several stages locally, but the lighting is controlled circulation areas designed for reception room. The PE conductor each luminaire to be built.

"A contract" Parádsasvár, outskirts property under 034 u Rudolf farm cottage remodeling, attic and outbuilding construction expansion "

Egererdő Erdészeti Zrt. | Published February 13, 2015
Winner
ORIGO 2004 Építőipari, Kereskedelmi és Szolgáltató Kft.
cpvs
45213150

"A contract" Parádsasvár, outskirts property under 034 u Rudolf farm cottage remodeling, attic and outbuilding construction of expansion. " The Parádsasvár Rudolf Ranch existing building and outbuilding renovation and transformation of a rest station establishment for walking and cycling tourism after the renovation of the main building, ground floor and attic 274.01 m2 total useful floor Disabled fully public utilities building as specified in the documentation. The annexe to design a usable area of ​​59.6 m2 room furniture, toilets and related useful floor area of ​​25.2 m2 bicycle storage.

Contract modified Barkóczy street construction invest.

Eszterházy Károly Főiskola | Published January 27, 2016
Winner
HÉSZ-SZAKIPAR Kft.
cpvs
45000000

Building Energy Development in the Esterhazy Karoly College buildings (Barkóczy street) within the framework of a contract.
Barkóczy street building: 3300, Barkóczy u. 5th
Replacing doors and windows Facade:
The first phase will be all the existing wooden window expands to the east side, and instead will be built according to the consignation new wood doors and windows. It is constructed view of the historic surrounding the border, as well as the building's facade values, loyalty and retention time of the original distribution system is adequate, custom manufacturing. In addition, during manufacture, the following performance values ​​Ensure a:
classification: 3-7A-C3
- Air permeability: class 3
- Water penetration: Class 7
- Resistance to wind load: C3 class
- Mechanical resistance: Class 3
- Re-opening resistance: Class 3
- Full prescribed structure U 1.15 W / m2K
- Required glass U: 0.8 W / m2K
- Surface: painted according to the original design creation.
4. Attic insulation of:
The top layer letakarított floor 22 mm thick. mineral wool packed refundable bond. λ min. 0.39.
Above the insulation is 50 cm wide pine járósáv be built.
A detailed description of the tasks of the technical documentation.

EEOP 3.2.0 / 11-2012-0017, EEOP 3.2.0 / 3.2.0 EEOP and 11-2012-0018 / 11-2012-0019 framework of code projects on the outskirts of St. Stephen, management center set up in the area of ​​construction works of the farm Batúz carried out within the framework of a contract.

Bükki Nemzeti Park Igazgatóság | Published November 7, 2014
Winner
Szilvási Építő Kft.
cpvs
45200000, 45213240, 45300000

EEOP 3.2.0 / 11-2012-0017, EEOP 3.2.0 / 3.2.0 EEOP and 11-2012-0018 / 11-2012-0019 framework of code projects on the outskirts of St. Stephen, management center set up in the area of ​​construction works of the farm Batúz carried out as follows: livestock management center functions, horses and sheep. The center capacity to accommodate 200 horses and 500 sheep. The design of the approach and processional roads, providing utilities during the construction contractor will also. In connection with the construction of the calls necessary to perform the following tasks an offer: EEOP 3.2.0 / 11-2012-0017 (Horse keeping and I) planned project construction activities - demolition of the existing building with 2 - 1 ménistálló construction (construction plan with the reception building building in) (drawing No. 3) - 1 x winter quarters building (drawing No. 8), - 1 lunger hall building (drawing No. 9) - 2 water reservoir construction - development of complete works road network - setting 850 meter fence - 1 Establishment pieces tüzivíztároló and related engineering tasks - landscaping, grassing - (. Hold Horse II) electrical supply cables to the full settlement in respect of planned EEOP 3.2.0 / 11-2012-0018 project construction activities - 1 reception building construction (the export plan building in conjunction ménistállóval) (drawing number: 1) - 1 hay and grain storage (drawing number: 4) - 1 x winter quarters (drawing No. 8) - 2 water storage - external utility wastewater and stormwater network building - an external utility building heating - water utilities outside building planned EEOP 3.2.0 / 11-2012-0019 (sheep) project construction activities - 1 x multi-function building (drawing No. 2) - 1 hay storage (drawing No. 5) - 1 juhhodály piece (drawing No. 6) - 1 + fuel storage service apartments (drawing No. 7) in the dossier with drawing number 5 * 2 additional hay storage facility does not form part of this public process. A division dedicated exclusively to the project-by-point accounting of budgets, according to a lump sum payment of the contract is not affected. Be carried out by the contractor in the performance of natural protected areas and Natura 2000 sites.