Call +44 800 9755 164

Public tenders for construction in Budapest Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Fővárosi Állat- és Növénykert | Published January 20, 2017  -  Deadline February 9, 2017

to be performed property managed by the Budapest Zoo and Botanical Garden area of ​​external public works and repairs, garden and road maintenance, landscaping works, and garden buildings, Animal facilities construction and maintenance works.

Construction work

NIF Zrt. | Published December 28, 2016  -  Deadline February 13, 2017

Debrecen intermodal transport centers and related ancillary facilities design and construction tasks (PST Code: I000.01)

Füzesabony - Debrecen II. a main road 108 + Arrow Hadházi road junction at 923 km section of the temporary reconstruction.

The property topographical number 9555/5 42 325 m 2 useful floor area, two floors below background color basement + ground + 3 floors levels are above ground level 4 part of the building (including 386-seat parking garage also) includes public buildings reconstruction, construction of 3000 m² steel support structure of the glass roof construction and the complex design of the necessary workspace delimitation (résfalépítése ) and dewatering of approximately 25 000 m², demolition, about 11 200 m 3 amount of built urban environment.

Specifying the Community Intermodal Transportation Center (IKKK) and external utility privileges are associated with the construction of associated facilities:

o Medium Voltage networks;

o Low voltage network;

o Public lighting network;

o Small and medium pressure gas distribution pipeline;

o District Heating Supply Network;

o Water supply pipelines;

o Precipitation channels;

o sewer;

o Hydraulic Engineering;

o communication lines.

necessary for the performance of the No. 4 and No. 47. The main tasks of building roads for hiking, biking and road underpasses, as well as demolition of the existing bridge overpass Homokkerti felhajtóág.

The reconstruction of the main road No. 4 and No. 47, No. 4 main road and main road access to (private transport-level node) redevelopment.

4.1 .: The No. 4 highway 884.53 m contiguous (continuous-section) length of redevelopment, leading to falling about 430 m length of background color (1500 m³ of slurry wall construction), underpass providing road clearings under the tram track construction, development of two pieces of spiral roundabout.

4.2 .: No. 47 highway and No. 4 highway accession of redevelopment (0 + 741.78 -.. Section 0 + 975 km between c) existing indirect branches demolition and reconstruction of the rotation roundabout for access to be built in the No. 4 main road order.

establishment of 4 new traffic junction with traffic lights Traffic Management System, 1 traffic light traffic junction alteration and demolition 3 traffic light transport hub.

Rail (trams and trolleybuses) facilities and related equipment breakdown and a new tram track, headend, power supply, overhead line and signaling and safety equipment for construction:

o grooved rail-track breakdown Rafs: 645 vm;

o grooved rail Rafs superstructure construction: 850 vm;

o need to develop landing 1;

Move stop o 1 p.

Environmental Planning and park construction work, including grassing 40 000 m² to 15 000 m² of housing construction

providing rail plant in Debrecen railway station under construction, design, licensing and construction for the temporary replacement of the power supply equipment.

Füzesabony - Debrecen II. a main road 108 + Arrow Hadházi road junction at 923 km section of the temporary reconstruction.

involved an investment of means of transport: cars and trucks, bicycles, trams and buses (local, long-distance), trolley and pedestrian.

The areas of work covered inner area located in Debrecen execution.

Other additional design tasks:

- Dewatering,

- Temporary traffic engineering,

- Locating underground.

Other business activities:

- TRAFFIC temporary construction, demolition,

- Explosive Ordnance Disposal testing and disarming,

- Providing archaeological and other technical supervisors,

- Preparation of as-built plans.

The main way to No. 4 after its complete closure by the end of the 18th month, the Contractor is obliged to return the traffic for at least a temporary final in service license. (Part penalty pregnant deadline).

Contractor for the entire duration of the contract is required to find the vehicle Hajdu-Bihar County Correctional Institute Petofi Square entrance to ensure unrestricted accessibility.

Works covered by this procurement detailed description and a more detailed summary of the technical content of construction of the planned facilities include the procurement documents.

Construction work

Városliget Ingatlanfejlesztő Zártkörűen Működő Részvénytársaság | Published January 3, 2017  -  Deadline February 7, 2017

existing water supply systems in the City Park, 800 mm main line belt breakdown of Dn 400 mm Gov discharge line Ajtósi execution of Dürer road route of the road and Hungária krt Dózsa. between 74/75/79 and relocation of Public Transport trolley flight route of the road and Ajtósi Durrer Dózsa road and the 600-volt network reconstruction.

existing water supply systems in the City Park, 800 mm main line belt breakdown of Dn 400 mm Gov discharge line Ajtósi execution of Dürer road route of the road and Hungária krt Dózsa. between 74/75/79 and relocation of Public Transport trolley flight route of the road and Ajtósi Durrer Dózsa road and the 600-volt network, reconstruction of the procurement documents indicated below.

In addition to the trolley bus in the area of ​​City Park Ajtósi Durrer parallel to the line of a 800 mm water main pipeline also passes through belt, which must also be placed in the Ajtósi Durrer line.

In construction work must begin immediately because of the construction work in connection with the following conditions to limit the work:

- Water backbone construction works to be finished until 06.30.2017 on the basis of a statement by the Water Works.

- One of the venues FINA 2017 Swimming World Championships in aqueous City Park Ice Rink, so the start of the event the closing events of the road work can not be done,

- Park in Budapest facilities construction schedule of the project, which should start in autumn 2017 at the City Park Theatre and Dózsa György út construction of underground parking.

The content of the summary way procurement is the order of execution of the following works:

- To carry belt 800 mm main line breakdown of 98 m,

- To carry out DN400 mm discharge line Gov Ajtósi Dürer trail on the road and Hungária krt Dózsa. Between 612 m,

- Transfer of Public 74/75/79 trolley route flights, and 600-volt network, reconstruction of 6100 m.

Construction work

Magyar Nemzeti Vagyonkezelő Zártkörűen működő Részvénytársaság | Published January 19, 2017  -  Deadline March 6, 2017

Determination of the contract: Framework agreement, the second phase of the framework agreement procedure of a contract.

Subject: ". The conclusion of a framework agreement related to the MNV tasks to perform construction works".

framework agreement related to the MNV Zrt.'s tasks to perform construction work, the allocation (net 40 billion HUF) last.

Expected main works: In particular, but not being limited to protected monuments building sites: building construction work, complete renovation / remodeling / reconstruction (structural engineering, architecture, engineering, strong and weak electricity, elevators, exterior works, facade and roof insulation, window replacement, heat and waterproofing systems, solar collectors and solar systems construction, preservation, restoration), the restoration works, parking garage, other civil engineering works where appropriate, special civil engineering technology (piling and diaphragm wall), existing buildings, renovation / conversion, new building (for industrial / public building) construction may have.

Part Bidding is not possible, with regard to:

Based are ordered by MNV Zrt high character works as a general rule based on this framework agreement award procedure.; In this circle were three people in order to ensure both greater competition - tendering procedure had been determined - based on race újranyitásán. Thus, indirectly, the performance of the framework agreement broken down into several parts, ie, default by a number of undertakings as possible. tasks do not belong to this group of MNV Zrt. - the investment activities of maritime administrations - separate procurement procedures to award, given that it is to bring more opportunity for the operator to perform a task.

Railway construction works

NIF Zrt. | Published January 19, 2017  -  Deadline January 31, 2017

Determination of contract:.

Subject: '(. Excl) - (. Bez) a contract to V100.32 Püspökladány Ebes track section of line construction and interlocking design and construction works. "

Construction work for bridges

NIF Zrt. | Published January 14, 2017  -  Deadline January 24, 2017

Komárom Komarno context of cross-border Danube bridge construction works of a contract.

Construction work

Semmelweis Egyetem | Published January 6, 2017  -  Deadline January 30, 2017

Construction contracts under the KEHOP-5.2.4-15-2016-00004 identification number of projects in the works to carry out the modernization of energy Kútvölgyi Clinical Array, which is the Hospital Clinic Building and the four-story wing of the facade thermal insulation, stone cladding, doors and windows and replacing the shade structures the modernization of the cooling system and the modernization of energy at a time, into strength necessary technical work to be performed includes option also includes a pie clinic building and the modernization of the economic wing of energy.

The detailed definition of the work to be done working drawings, specifications and budget proposals as part of the tender documents contain.

Construction work

Nemzeti Sportközpontok | Published December 29, 2016  -  Deadline February 21, 2017

Dunavarsány Central - Hungarian Olympic Centre design and construction of I-II. the pace.

The implementation of the development planned in several phases.

The subject of this acquisition I and II. Implementation schedule: Dunavarsány Central - Hungarian Olympic Centre design and construction I.-II. schedule, which includes the following tasks:

Design tasks:

- Based on the approval of the plan, provided the preparation of design documentation, licensing, permits, contributions or statements provided the necessary legislation on the acquisition,

- Contribution to an authorization, charging and management plans on the basis of power of attorney ÉTDR system,

- Preparation of detailed design documentation (without priced and unpriced, itemized budget, the built-in furnishings and built-in equipment, Mobilia), the Tender instructions and public document requirements of properly, in compliance with the Hungarian technical requirements of laws and regulations at all times in effect, in force the standards of form and content requirements, according to expectations,

- Ensuring the designer's leadership in design closure.

The amount to be delivered Plans: 3 copies on paper, Hungarian and .pdf / A; pdf; .dwg format or three copies of a CD / DVD.

Design tasks:

I pace.

1. Establishment of a new pool: accommodate 15x25 m swimming pool and a 6x10-meter warm-up pool 1750 m² facility, together with the associated server rooms.

Interior remodeling of existing facilities: Carry out internal restructuring works 460 m² floor space.

3. Establishment of a new roof and roof terrace Existing rear, above the dining area of ​​342 m².

4. New roof the valves: a new building next to the existing main entrance, 57 m² floor space (architectural - structural works).

II. The pace.

1. The establishment of a new sports hall.

26x46 m size - can accommodate handball court - 1550 m² facility, together with the associated server rooms.

Green Park development and spatial planning.

Road and car park building (1115 m²), paving (240 m²), spatial planning (1262 m²).

A further task: the acquisition of final occupancy permits.

For more information on the technical specification.

In such a case "or equivalent" should be understood that demonstrate the equivalence of the contractor will.

The construction site endowments, and the expected completion date taking into account the number of contractors performing work at the same time taking into account the organizational conditions are not possible.

Railway construction works

NIF Zrt. | Published December 29, 2016  -  Deadline February 15, 2017

within the framework of a contract between Szeged and Hódmezővásárhely construction of tram-train, light rail supply works design and construction tasks.

The rail line between road design and construction of Hódmezővásárhely Hódmezővásárhely People's Garden and large stations, and between Szeged and stop Roch Roch Branch.

Hódmezővásárhely light rail line design and construction work.

Hódmezővásárhelyen 3.3 km long single-track tram line construction, five seats and one stop végállomással.

On this section will establish a 600 V DC overhead line network (complete system), including converters, as well as the signaling and interlocking system deployment as well.

Szeged Roch light rail line design and construction work.

Related other ancillary works (peronépítés, level crossings fences etc).

The tasks are specified in the tender documents.

Contracting Authority draws the attention of the bidders that this procurement process in respect of the design task is construction plan level planning task.

Contracting authority shall also inform the bidders that the final building permit plans and permits are available.

Construction work

Nemzeti Sportközpontok | Published December 29, 2016  -  Deadline February 16, 2017

Gödöllői swimming pool design and construction of Phase I.

The implementation of the development - three pool competition and implement training pool - planned in two phases.

The present implementation of Phase I of the acquisition, in which two pool (25X50 meter competition pool and a training pool 6X10 m) the investment is realized.

Design tasks:

- Preparation of design documentation for authorization on the basis of approval of plan to be included in the tender documentation, permits, contributions or statements provided the necessary legislation on the acquisition,

- Contribution to an authorization, charging and management plans on the basis of power of attorney ÉTDR system,

- Preparation of detailed design documentation (without priced and unpriced, itemized budget, built-in furnishings and built-in equipment, Mobilia), the Tender instructions and procurement documents requirements of properly, in compliance with the Hungarian technical requirements of laws and regulations at all times in effect, in force, requirements of form and content requirements, according to expectations,

- Ensuring the designer's leadership in design closure.

The amount to be delivered Plans: 3 copies on paper, Hungarian and .pdf / A; pdf; .dwg format or three copies of a CD.

Design tasks: building Indoor swimming-purpose building complete, turnkey design, the related technology pool, landscaping, outdoor utility building projects, as well as with the acquisition of non-occupancy permit.

The larger competition pool, a 25X50 meter, and a smaller training pool, 6X10 m.

Useful floor area of ​​Phase I: 6 778.62 m².

For more information on the technical specification.

In such a case "or equivalent" should be understood that demonstrate the equivalence of the contractor will.

Tramline construction works

BKK Budapesti Közlekedési Központ Zártkörűen Működő Részvénytársaság | Published January 7, 2017  -  Deadline January 26, 2017

Pest side extension and construction of tramway line 1 reconstruction work in Etele Square.

Railway construction works

NIF Zrt. | Published December 28, 2016  -  Deadline February 9, 2017

In order to ensure the long-term additional drainage works export planning and implementation of the railway track Balatonvilágos housed stability of loess wall.

In order to ensure the long-term additional drainage works export planning and implementation of the railway track Balatonvilágos housed stability of loess wall by performing the following duties and facilities construction and design:

1. railway track housed, located in loess slope and ancillary dewatering and drainage embankment to ensure the dewatering facility, inclusive implementation;

railway within the framework of the settlement environment 2. Additional dewatering facility alley parallel sidewalks and life safety fence construction;

3. loess have railway crossing drainage capacity building.

The length of drainage water should be drained into the recipient (Balaton).

The loess wall drainage carried out by a built in the 1970s, deep drainage tunnel, but this facility is not provided to all Layer ( "water floor") waters draining, so the long-term to ensure the necessary construction of additional drainage facility of the rail track housed loess wall stability of.

The loess crosses a railway track in Balatonvilágos in level crossing, which is the recipient of drainage is not solved, the drainage capacity additions and the construction should be carried out.

For these installations must perform the following planning tasks:

- Permitting plan preparation,

- Process the authorization process - to obtain a building permit,

- Contractor's planning,

- Implementation planning,

- Qualification documentation.

Major quantities envisaged:

- Deep drainage system construction: 7200, m

- Construction of a new underground seepage: 1950 m,

- Recipient collected water management and rainwater Construction: 1500 m.

The task included a detailed description of the procurement documents.

Road construction works

NIF Zrt. | Published January 6, 2017  -  Deadline February 7, 2017

7-710. s. within the framework of the main road junction, 710 highway construction project contract for wiring (K071.01).

The contractor (executor) is also responsible for the following design, permitting and construction tasks are: Budapest-Balaton bike path of the transfer of planning, licensing and construction of No. 710. The main road and the 7205th no. roundabout point.

The works constitute an indivisible service.

Catenary's construction works

NIF Zrt. | Published December 23, 2016  -  Deadline February 7, 2017

Determination of contract:.

"Szabadbattyán - Tapolca - Keszthely implementation bottlenecks challenge, electrification and centralized traffic control around the lake Phase I (Szabadbattyán-Aszófő)" project overhead line construction, railway construction and additional works of design and construction.

framework contract for the "Szabadbattyán - Tapolca - Implementation of Keszthely bottleneck challenge, electrification and centralized traffic control around the lake Phase I (Szabadbattyán-Aszófő)" project overhead line construction, railway construction and additional works of design and construction, the following main quantities:

Szabadbattyán - Aszófő electrification of the railway line, 50 Hz 25 kV AC overhead electrical design and construction of 60 km .;

Electrical substation design and construction of two locations;

transformer provided by the expansion and redevelopment of Customer Szabadbattyán existing 120/25 kV substation, transmission line construction in the feeding phase limit;

Aszófő existing 120/25 kV substation expansion for MAV provided by Customer transformers, power supply phase construction of the border;

Exchange Heating Design and construction of 42 bypass group;

Optical Cable Design and Construction (part vasútvillamosítás) 60 km;

5. Consolidated train operation control system is installed (as part vasútvillamosítás);

Catenary power control (FET) Establishment (part vasútvillamosítás):

6.1. Station 8;

Phase Cross: 3;

Bypass installation or replacement, substructure reinforcement:

Polgárdi industrial sites Station: 4 groups;

Polgárdi Station: 2;

Csajág station: 5 groups;

Balatonkenese station: 4 groups;

Balatonfűzfő station: 4 groups;

Balaton station: 4 groups;

Alsóörsi station: 5 groups;

Balatonfüred station: 12 groups;

Aszófő Station: 2;

Track construction substructure reinforcement: 11,5 km;

Strengthening local substructures: 700 vm;

Widening Alépítménykorona: 1900 vm;

11 Ágyazatrostálás 8750 vm;

Edilonos track construction system: 180 m;

Peronépítés (SK + 55 cm magasperon small battery cover 250 m in length):

13.1. Középperon station: 9;

Stops: 7;

Paved ditch construction: 4800 m;

Leakage System Construction of 14 km .;

One or multiple track crossing, providing level crossing level crossing, pedestrian and duty construction and reconstruction:

Rail and road crossings to ensure crossing 29 group;

providing rail-pedestrian crossing pedestrian crossing 23 group;

platform approach to providing pedestrian passage 11 group;

16.4. Station operating passage: 3 groups;

Peronaluljáró Balatonfüred renovation of the station;

Peronaluljáró Csajág renovation of stairs, and Balatonfüred stations;

Installation of platform lifts for disabled approach and Balatonfüred station: 4;

Small works of art construction / reconstruction: 3;

Stairs and ramps Reconstruction Balatonakarattya stop there;

Bridge Insulation works Renovation of objects: 2;

Railway perontető refurbishment / redevelopment Balatonfüred station;

Stations are installing shelters: 21 pc;

Asset protection, installation of fire alarm systems in buildings admission: 7;

Alsóörs power station design office;

Balatonfüred Kofi station design center;

28 Stations remotely control the station building 8;

29 station interlocking in accordance with, the construction phases, 8. station;

standardization of public utility crossings;

Create and export licensing and combined plans for implementation.

Construction work for highways, roads

NIF Zrt. | Published January 11, 2017

Determination of contract:.

Subject: "a contract to the M4 motorway M0 - Cegléd I.-II. construction phase and related facilities construction and design works to carry out ".

Construction work for water projects

Országos Vízügyi Főigazgatóság | Published January 12, 2017  -  Deadline January 31, 2017

framework contract for the "Great Works of art development and reconstruction" of KEHOP-1.4.0-15-2015-00002 project identification number under the terms of FIDIC Yellow Book supplying construction and design tasks.

Stadium construction work

Nemzeti Sportközpontok | Published December 29, 2016  -  Deadline February 6, 2017

Based on construction of sports facilities in Budapest Bozsik Stadium football contract for a flat rate.

The UEFA appropriate "Category 4", with the Bozsik Stadium construction, which includes, inter alia:

Installation parameters.

Land area: 70 111 m².

Built area: 8208 m².

Floor area ratio: 0.202 m² / m².

Gross floor area: 14 136 m².

Building height: 14.60 m.

Crafted green surface: 23 244 m².

Paved area: 30 463 m².

of which:

Background stone-facing: 23 725 m².

Concrete lawn grid: 5827 m².

Gravel: 992 m².

Playing field area: 10 032 m².

No parking is provided on site: 537-20% = 438 pcs.

Precast concrete elements: 1300 pcs.

Steel structure: 670 tons.

Reinforced concrete structure: 2700 m³.

Brief description of the investment:

The installation function.

8000 delegates / UEFA Category 4 and Class I according to HFF's "A" category with /, covered lelátóból designed and underlying social and service units, as well as a PSP + 3-story building consists of the head.

The built track lighting must be suitable for HD broadcasts.

The stadium entry points to the fans via 2,100 mm tall rotating gates.

Contracting of construction design documents made available which contains detailed conditions for the stadium.

Other conditions affecting the execution:

As the construction area of ​​transmission (vágányzár reconciliation etc), technical inspection, handover should be organized to the players that must be involved in the MAV for relations with the Contractor carried out by the Customer at the same time information and its range takes care of MÁV is appropriate specifications, tests, tests, documentation, procurement of licenses.

During the design the following requirements and recommendations to the contracting authority took into account:

- HFF's ISP 2014/2, HFF's Local Rules,

- 5th edition FIFA 2011 Football Stadiums, Technical Requirements and Recommendations,

- UEFA Guide to Quality Stadiums,

- UEFA Stadium Infrastructure Regulations, 2010 Edition,

- Access for All-UEFA UEFA and CAFE Good Practice Guide to Creating an Accessible Stadium and Matchday Experience,

- DCMS-Guide to Safety at Sports Grounds.

Road construction works

NIF Zrt. | Published December 22, 2016  -  Deadline February 8, 2017

the M15 motorway (M1 - Rajka, state border) of a contract for a motorway 2x2-lane expansion of construction, preparation of working drawings authorize them (PST Code: A015.03).

constitute works as defined in the indivisibility of service.

The M15 motorway in Slovakia as the D2 highway continues as part of the Pan-European Transport Corridor 4.

Under the project, the existing two-lane 1 * 2 * 2-lane motorway is to be developed in a motorway and must perform the following tasks:

- M15 highway (M1 ap - km 14 + 508 no. - 0 + 000 rajka state border) has to be prepared implementation plans needed for implementation based on design plans to 2x2 lanes of a motorway extension made building permit.

- The bridge construction plans sanctioned.

- The acquisition of the necessary building permits from the authorities.

- M15 0 + 000-14 + 508 km no. the missing section between the right track construction, renovation of existing tracks left.

7 overpass, which the B112 j overpass openings available: + 13.76 m 28.79 m 15.77 m + a free openings perpendicular to 11.91 m + 24.93 m + 13.66 m.

- The renovation of existing structures: 9 overpass, 10. underpass.

- Design speed of 130 km / h.

Contractor is also responsible for planning the use of technical management and production of content determined by special legislation and compliance verification sampling plan.

Part included.

If the option Part bid would be permitted in each section of the work processes can not be coordinated by traffic could be inconsistent with, and therefore congestion merging into the stretch, which can lead to accidents.

Prison building construction work

Büntetés-végrehajtás Országos Parancsnoksága | Published December 24, 2016  -  Deadline February 1, 2017

with construction of 500 persons convicted prisoners to receive 4 new prison a contract to design four execution venues, 4 parts tender round.

The works on the 268/2016. Based (VIII. 31.). No special national economic importance.

Trunk road construction work

NIF Zrt. | Published January 12, 2017  -  Deadline February 2, 2017

Hazelnuts and a new M3 motorway junction for Fot approach, and the node and the 2,101th j. implementation of the road section between (PST Code: K003.12).

About 1.55 km of new track lined 2x1-lane road bridge over highway 1, 4 roundabout construction.

The objective constitutes an indivisible service works.