Public tenders for construction in Boldog Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

road construction

Jászfényszaru Város Önkormányzata | Published April 17, 2015  -  Deadline May 6, 2015
cpvs
45000000

road construction

road construction

Jászfényszaru Város Önkormányzata | Published May 6, 2015  -  Deadline May 6, 2015
cpvs
45000000

road construction

road construction

Jászfényszaru Város Önkormányzata | Published June 19, 2015
Winner
Colas Út Zrt.
cpvs
45000000

Export contract: Road construction - csapadékvízelvezetés - plumbing replacement quantity Arany János utca housing reconstruction and pavement reconstruction pavement reconstruction of concrete: 650m2 Recessed trim construction: 1093 meter C-11 leveling layer preparation: Production of 62 m3 C-11 wearing course: 98 Dike construction m3 / profiling 38 m3 Padkarendezés: 1093 m2 Army street pavement restoration and pavement reconstruction of concrete pavement reconstruction: Recessed trim 540m2 building: 918 m leveling layer making the AC-11: Production of 28 m3 C-11 wearing course: 45 m3 Dike construction / profiling: 271 m3 Padkarendezés: 918 m2 Ady Endre street pavement reconstruction and Parking building Parking building space stone 356 m2 Scattered roadbed construction: 77 m3 Featured edging building: 155 m recessed edge building: 750 m C-11 leveling layer making: 31 m3 C-11 wearing course preparation: 53 m3 Dike construction / profiling 150 m3 Padkarendezés: 416 m2 Youth street pavement reconstruction recessed edge building 1717 m Scattered roadbed construction: 774 m3 C-11 tie coat production: 155 m3 AC-11 Production of wearing course: 155 m3 ditch construction / profiling: 342 m3 Padkarendezés 1717 m2 pavement reconstruction marked the performance space as streets, total: Paul Vasvári street parking and entrance to the construction of existing housing demolition of 56 m3 of earth yield of 218 m3 Mirror making 585 m2 Ckt -T2 j. roadbed construction: 99 m3 Garden edging Building: 250 m Paving Construction: 585 m2 Attila street pavement reconstruction earth yield 55 m3 Mirror making 370 m2 Sidewalk construction of pavement, concrete: 260 m2 Padkarendezés: 150 m2 3 Arpad street pavement reconstruction earth yield 92 m3 Mirror making 800 m2 Sidewalk construction of pavement, concrete: 590 m2 Padkarendezés: 310 m2 Hussar street pavement reconstruction earth yield 59 m3 Mirror making 388 m2 Sidewalk construction of pavement, concrete: 270 m2 Padkarendezés: 150 m2 Kossuth street pavement reconstruction earth yield of 160 m3 Mirror making 1270 m2 Sidewalk construction of pavement, concrete: 900 m2 Padkarendezés: 520 m2 Lehel street pavement reconstruction earth yield 95 m3 of mirror production: construction of 670 m2 flagstones, concrete: 485 m2 Padkarendezés: 330 m2 Szucs M. street pavement reconstruction earth yield 51 m3 Mirror making 353 m2 of concrete pavement construction Sidewalk: 250 m2 Padkarendezés: 125 m2 Madách street pavement reconstruction earth yield 82 m3 Mirror making 670 m2 of concrete pavement construction Sidewalk: 485 m2 Padkarendezés: 350 m2

road construction

Jászfényszaru Város Önkormányzata | Published April 1, 2015  -  Deadline April 20, 2015
cpvs
45000000

Export contract: Road construction - csapadékvízelvezetés - water pipe replacement

public road construction works

Jászfényszaru Város Önkormányzata | Published May 13, 2015
Winner
STRABAG Általános Építő Kft.
cpvs
45000000

Subject: The amount of road building public works: the construction of a new street water pipes, sewers and street lighting construction of 170 m long

road construction

Jászfényszaru Város Önkormányzata | Published December 11, 2015
Winner
Colas Út Zrt.
cpvs
45000000

Subject: road rehabilitation quantity: Unsuitable subsoil extraction: 8,225 m3 Protective Layer preparing sandy gravel: 3974 m3 Soil Stabilization production: 8510 m3 Ckt-T2 roadbed: 3550 m3 Asphalt reinforcement grid: 915 m2 Balancing rtg .: AC-11 wearing course of asphalt 159 m3 Knitting rtg .: AC-22 asphalt binder 1288 m3 x-ray Wearing .: AC-11 asphalt wearing course in 1049 m3 x-ray Wearing .: AC-16 (F) 888 m3 asphalt wearing course construction Featured border: 1606 m construction progress bar: 1540 m Inclined edging Building: 372 m Recessed Border Construction: 2447 m M56 stabilized berm construction: 2225 m3 Rézsűképzés: 8232 m2 5 Earthworks Landscaping kind: 550 m3 Humuszterítés 20 cm thick flat surface: 1630 m2 Humuszterítés slope surface 10 cm thick: 8657 m2 Details of the television, according to.

design processing

Jászfényszaru Város Önkormányzata | Published August 12, 2015  -  Deadline August 31, 2015
cpvs
45000000, 71000000

design-construction contract

care center renovation and expansion

Jászfényszaru Város Önkormányzata | Published February 6, 2015
Winner
Épkomplex Kft.
cpvs
45000000

Subject: care center renewal, extension Quantity: 15 persons supplying existing elderly care center renovation, modernization and extension of 31 persons, as well as demolition of outbuilding next to the smooth functioning of the institution. The building is single storey, part attic, a total area of ​​1184.8 m2 net. Construction of the "traditional" construction technology. (If applicable, only numbers) Estimated value excluding VAT: 266 000 000 Currency: USD

road reconstruction

Jászfényszaru Város Önkormányzata | Published June 22, 2015
Winner
Colas Út Zrt.
cpvs
45000000

Subject: road rehabilitation quantity: Unsuitable subsoil extraction: 8225 m3 Resist making sandy gravel: 3974 m3 Soil Stabilization production: 8510 m3 Ckt-T2 roadbed: 3550 m3 Asphalt reinforcement grid: 915 m2 Balancing rtg .: C-11 wearing course of asphalt 159 m3 Binder rtg .: AC-22 asphalt binder 1288 m3 x-ray Wearing .: AC-11 asphalt wearing .: 1,049 m3 Wear X-ray C-16 (F) 888 m3 asphalt wearing course construction Featured border: 1606 m construction progress bar: 1540 m Inclined edging Building: 372 m Recessed construction of border: 2,447 m M56 stabilized berm construction of 2225 m3 Rézsűképzés: 8232 m2 5 Earthworks Landscaping kind: 550 m3 Humuszterítés flat surface 20 cm thick 1630 m2 Humuszterítés slope surface 10 cm thick: 8657 m2 Details of the camel below.

technical inspection

Jászfényszaru Város Önkormányzata | Published June 22, 2015
Winner
Baufiniser Kft.;Hornyák Mérnöki Iroda Kft.
cpvs
71000000

Subject: The amount of technical inspection: Part I: The road rehabilitation project 3,106th rate: 382 546 036 HUF + VAT II. Part One: road construction. The investment value of up to 618,978,000 HUF + VAT

contract modification

Jászfényszaru Város Önkormányzata | Published November 5, 2015
Winner
Goodwill Energy Kft.
cpvs
45000000

Subject: Sandor Petofi Community Centre and Library; Elementary School, Elementary Art School and Vocational School buildings solar system construction. Quantity: Solar panel 250Wp, polycrystalline 196 Solar wiring, a protective tunnel leading to 2,300 m Inverter, 17 kW output power, three-phase 2 Inverter 15 kW output power, three phase 1 Details of the unpriced materials tenders and specifications are described below.

gonodzási center renovation

Jászfényszaru Város Önkormányzata | Published July 8, 2015
Winner
Épkomplex Kft.
cpvs
45000000

Subject: care center renovation and expansion quantity: 15 persons supplying existing elderly care center renovation, conversion and extension of 31 persons, as well as demolition of outbuilding next to the smooth functioning of the institution. The building is single storey and partly attic, total area of ​​1184.8 m2 net. Construction of the "traditional" building technology. (If applicable, figures only) Estimated value excluding VAT: 266 000 000 Currency: USD

road design

Jászfényszaru Város Önkormányzata | Published July 3, 2015
Winner
Eply Kereskedelmi és Szolgáltató Kft.;Eply Kereskedelmi és Szolgáltató Kft.;Speciálterv Építőmérnöki Kft.;Eply Kereskedelmi és Szolgáltató Kft.
cpvs
71320000

Subject: trip planning Quantity of Salt Lake Vineyard - Making Road construction permit level study cost estimate deadline: 45 days from date of order (which do not count towards the road public utility managers - consultation or approval of ownership far) 6,0m pavement width, 2x1 lane road Along least 1,0m wide curb stabilized and the planned infiltration ditches on either side road. The planning tasks necessary for the design of geodesy, surveying, utility coordination. The plan delivered the authorization shall be made by e-ROAD content 01.03.11 / 1.14.6.1 (Required parts work 1-11 points) amount. Jászfényszaru - Happy road connecting the 0 + 785 km - Housing section between 3 + 100 km sections renewal plan deadline: 45 days from date of order (which do not count towards the road public utility managers - consultation or approval of ownership far) Design challenge: the renovation plan documentation must be drawn up by the Transport Coordination Centre based on specific rules KHEM 2878/2/2009 NATIONAL ROAD registration number of main and secondary roads 2-1201 UME / connective tissue / issued in addition to reconstruction and maintenance works of ANY DESIGN. No task is the preparation of the bridge over the River Zagyva renovation / redevelopment plan, as well as industry-specific triggering utilities / drawing up plans for protection rating. Making its exports Based on the bike path and bicycle bridge over the Zagyva licensing plans scheduled 45 days from the issuance of a building permit Planning Task bridge construction plan deadline - Southern bicycle trail 2 km long and Zagyva new bike. 018/10 u preparation area 180m long approval and construction of new pavement plan between the 3,106th and the national road j u 317/1 road. eng Plan. Deadline: 45 days from date of order (which do not count towards the road public utility managers - much consultation or approval of ownership) implementation plan. Deadline: 30 days from the issuance of a building permit Planning Task 180m track length, 2x1 lane road along the planned stabilized at least 1,0m wide curb and infiltration ditches on either side residential road. The design of the national public road (3106 j. They way) connection as easy to connect. The plan delivered the authorization shall be made by e-ROAD content 01.03.11 / 1.14.6.1 (Required parts work 1-11 points) amount.

design processing

Jászfényszaru Város Önkormányzata | Published November 6, 2015
Winner
STRABAG Általános Építő Kft.
cpvs
45000000, 71000000

Part III dokumetnáció necessary road reconstruction plumbing csarével and sidewalk renovations, parking lot construction, bus shelters placement preparation of 11 municipal roads Reconstruction as follows Course Structure: - Road Course: 4 cm thick AC-11 asphalt wearing course of 2.5 cm thick AC-11 asphalt leveling layer Existing kátyúzandó, profiling pavement - pavement 10 cm thick C20 / 25 concrete Burk. (15cm thick C20 / 25 concrete Burke kapubejárónál.) 15 cm thick gravel ballast compacted subsoil cross-section design - is the existing pavement to 4 m in width renovated - Page drop in cross-section, according to a variable - before the renovation of the pavement on either side of the road edge USS40 recessed edge line to build - outside the border line is necessary to develop Layers 1 m wide bred curb 0-20 5cm 20- 0-50 No. 1 Cost 300 g geotextile over the routes of existing water lines in the erededti track will be replaced, in addition to roads the sidewalks will be reconstructed. street name Length (m) Bajcy-Zilinszky road 820 (in nencs pavement renovation) John Kölcsey Ferenc utca 320 Vajda street 150 Mikszáth street 150 Déryné street 150 Youth Street 400 Poppy Street 140 Lily Street 360 Swallow Street 360 Kozma utca 830 Rainbow Street 120 3800 total

garage building

Jászfényszaru Város Önkormányzata | Published November 6, 2015
Winner
Borbély-Ép Kft.
cpvs
45000000

Garage Building Volume: Demolition work: The plot is located in an existing garage building (30 cm thick block of brick masonry, nearly 25-degree pitched roof: corrugated asbestos sheet roofing on wooden rafters) and the old fence (between steel columns on the vb base body vertical wooden slats, double driveway gate and a wing wicket a gate, a total of ~ 36 m) from the builder in full each structure (foundation, walls and superstructures) decomposes. Construction work: Name Number of Room 01 m2 floor smoothed concrete Garage Garage smoothed concrete 16.50 02 16.50 03 16.50 04 concrete Garage Garage smoothed smoothed smoothed concrete Garage 16.50 05 16.45 82.45 06 concrete crawl space under the Pergola Leier 29.44 07 paving stones Trash storage space Leier 4.22 Garage: The proposed garage provides parking for the apartment pharmaceutical industry for its inhabitants. The five-time garázssor. The free-standing building, the land border, separated by 5 m wide forecourt in both directions. The garage width of 3 m and a depth of 5,5m, 2,2m width lintels. The remote-controlled garage doors Sectional garage doors where the height is 2.8 m. The southern facade garage is located 6-6 per piece of glass blocks. The teres hiding in a garage attic disconnects Square reinforced concrete slab. All electrical power consumption of a special garage for the apartments to be measured on. COURT: The crawler viacolor paved. Concrete enclosure behind the main building is a broken line, instead of agricultural land being installed. The outdoor courtyard paved with 2 additional wooden structure was constructed pergola shaded car parking, on the east side of the building. The west side of the building between the fence and it is possible to store bins. FENCE: The fence will be updated throughout the site. Made of metal, like home health structure. A fence line runs approximately along the front wall of the main building. The entrance gate electric sliding gate.

garage building

Jászfényszaru Város Önkormányzata | Published December 9, 2015
Winner
Borbély-Ép Kft.
cpvs
45000000

Garage Building Volume: Demolition work: The plot is located in an existing garage building (30 cm thick block of brick masonry, nearly 25-degree pitched roof: corrugated asbestos sheet roofing on wooden rafters) and the old fence (between steel columns on the vb base body vertical wooden slats, double driveway gate and a wing wicket a gate, a total of ~ 36 m) from the builder in full each structure (foundation, walls and superstructures) decomposes. Construction work: Name Number of Room 01 m2 floor smoothed concrete Garage Garage smoothed concrete 16.50 02 16.50 03 16.50 04 concrete Garage Garage smoothed smoothed smoothed concrete Garage 16.50 05 16.45 82.45 06 concrete crawl space under the Pergola Leier 29.44 07 paving stones Trash storage space Leier 4.22 Garage: The proposed garage provides parking for the apartment pharmaceutical industry for its inhabitants. The five-time garázssor. The free-standing building, the land border, separated by 5 m wide forecourt in both directions. The garage width of 3 m and a depth of 5,5m, 2,2m width lintels. The remote-controlled garage doors Sectional garage doors where the height is 2.8 m. The southern facade garage is located 6-6 per piece of glass blocks. The teres hiding in a garage attic disconnects Square reinforced concrete slab. All electrical power consumption of a special garage for the apartments to be measured on. COURT: The crawler viacolor paved. Concrete enclosure behind the main building is a broken line, instead of agricultural land being installed. The outdoor courtyard paved with 2 additional wooden structure was constructed pergola shaded car parking, on the east side of the building. The west side of the building between the fence and it is possible to store bins. FENCE: The fence will be updated throughout the site. Made of metal, like home health structure. A fence line runs approximately along the front wall of the main building. The entrance gate electric sliding gate.
  • 1