Public tenders for construction in Greece

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work for water and sewage pipelines

Δημοτική Επιχείρηση Ύδρευσης Αποχέτευσης Μαλεβιζίου | Published October 19, 2017  -  Deadline November 28, 2017
cpvs
45231300, 45232152, 45232400, 45232130

The auctioned project includes the following:

a) The construction of two septic tank-pumping stations in Lygaria and Agia Pelagia respectively, a pre-built pumping station at Agia Pelagia beach and the use of the existing septic tank of Made with the addition of the necessary electrical equipment.

b) The construction of internal drainage grids with the gravity of Agia Pelagia settlement and the beach of Lygaria as well as the external sewerage pipelines (depressant and gravitational) from the three settlements at Agia Pelagia Wastewater Treatment Plant. It is also planned to replace existing water pipelines where needed

c) The construction of boxes and circular storm drains in the settlements of Agia Pelagia & Madee.

The auctioned project consists of the categories of plumbing, electromechanical and building works.

In summary, the project includes the following:

Construction of septic tank-pumping stations in Lygaria and Agia Pelagia settlements as well as ANT-A pumping station at the beach of Agia Pelagia settlement and use of the existing septic tank in Médé with all the necessary modifications that may be required.

Construction of internal drainage systems with the gravity of the settlement of Agia Pelagia and the beach of Lygaria and replacement of existing water pipelines where required.

Construction of a depressant pipeline from the septic tank-pumping station of the village of Made to the high point (high point) and gravity then to the septic tank-pumping station of Lygaria settlement.

Construction of a depressant pipeline from the septic tank-pumping station Ligaria to the septic tank - pumping station of Agia Pelagia.

Construction of a depressant pipeline from ANT-A beach pumping station of the Agia Pelagia settlement to the septic tank-pump station at the parking site.

Construction of a depressed pipeline from the septic tank-pumping station to the parking place of Agia Pelagia ...

Electricity

Ανώνυμη Εταιρεία Διαχείρισης Ανανεώσιμων Πηγών Ενέργειας με διακριτικό τίτλο ΔΕΗ Ανανεώσιμες ΑΕ | Published October 19, 2017  -  Deadline October 25, 2017
cpvs
09310000, 45251160, 45233140

Study and construction of infrastructure works of 10 wind farms with a total capacity of 19,80 MW at the following locations: Marmari, Evia Power 5,40 MW, Perdiki Ikarias Power 0,90 MW, Agios Ioannis Karpathos 0,90 MW, Sigri Lesvos Power 2,70 MW , Vigla Lemnos Power 0,90 MW, Pythagorion Samou 1.80 MW, Chios Melanium 2.70 MW, Prophet Ilias Psia Power 1.80 MW, Chios River 0.90 MW and Mykonos Fryllus 1.80 MW , a total indicative budget of EUR 5 230 000, excluding VAT or EUR 6 485 200, including VAT, currently at 24%.

Road construction works

Περιφέρεια Θεσσαλίας / Διιεύθυνση Τεχνικών Έργων | Published October 19, 2017  -  Deadline November 30, 2017
cpvs
45233120

The object of the project is the construction of the road section of Karamanlis Avenue (Old National Road of Athens - Thessaloniki) of today's Regional Ring of the city of Larissa, from the node (I / K) level to Volos Street (Ch. 115) to the node (I / K) level with Agias Street (CB 8 + 110), the construction of three (3) circular nodes, as well as the corresponding side network. The total length of the artery is 1.3km, including its adaptations to the existing beginning and end roads.

Sewer construction work

Δήμος Αριστοτέλη | Published October 19, 2017
Winner
Κ/ΞΙΑ «αξιον Τεχνικη Α.Ε. — Πολυζωής Νίκος Α.Ε.»
cpvs
45232400, 71320000

An ETS will be constructed for an equivalent population of 20 with 3,200 inhabitants using the activated sludge method

prolonged ventilation.

The VET will consist of the following units:

-Fort of arrival

-Water Pre-Treatment Unit (scraping - dehumidification - liposuction - supply measurement)

- Biological treatment unit (aeration tanks with nitrification - denitrification - dephosphorization,

settling tanks)

-Terminal treatment unit (filtration)

- Disinfection unit (chlorination - dechlorination)

- Sludge treatment unit (homogenization - mechanical thickening and mechanical dehydration)

-Mood works.

Architectural and related services

Δήμος Αρταίων | Published October 19, 2017  -  Deadline November 23, 2017
cpvs
71200000, 71322000, 71321000, 71242000, 71300000

The municipality of Artai, within the framework of a general program for the improvement of the professional, social, tourist and cultural infrastructure of the city, intends to proceed with the construction of the new building for the housing of a Permanent Housed Exhibition Center in the city of Arta. The new Building of the Permanent Housed Exhibition Center of Arta will be erected on a plot of land located on the Regional Road of the city, at OT. 428. The building will serve mainly seasonal exhibitions of products of various professional directions such as industrial, craft, construction, agricultural products, etc. The Department of Technical Services of the Municipality of Artai has elaborated an Architectural Preliminary Design, with the desired architectural layout of 3267 , 00 m2. The contract will include the Architecture, the Static and the Electromechanical study of the building as well as the study of the configuration of the surrounding area of ​​approximately 1133,00 m2.

The contract includes the elaboration of the Architectural Study (Final Design, Application Design and Tender Documents), Static Design (Preliminary Design, Final Design, Implementation Study and Tender Documents) and Electromechanical Study (Preliminary Design, Final Design, Implementation Study and Tender Documents) . The estimated value of the contract amounts to EUR 625,666.91 and includes the estimated fees of the following sub-categories of studies:

EUR 203,453.76 for category 06 (Architectural Design) - CPV 71200000

EUR 98,845.35 for Category 08 (Static Design) - CPV 71322000

EUR 200,721.94 for category 00 (E / M Studies) - CPV 71321000

EUR 34,569.92 for Tender Documents - CPV 71242000

EUR 6,467.22 for a SEM study & Φ.Α.Υ. - CPV 71300000

and EUR 81 608,73 for unforeseen expenditure.

Construction work for sewage pipes

Εταιρεία Υδρεύσεως και Αποχετεύσεως Πρωτευούσης Α.Ε. (Ε.ΥΔ.Α.Π. Α.Ε.) | Published October 18, 2017  -  Deadline November 30, 2017
cpvs
45232440, 45232431

The object of the present contract (hydraulic and electromechanical) is the construction of drainage (gravitational and depressant) sewage pipelines in areas of competence of EYDAP. SA, as well as the construction of a pre-built pumping station.

The construction or reconstruction of gravity drainage ducts in the open, with a total length of approximately 7.180 m, is foreseen. and drainage pipelines by the pushed tube array (micro tunnel), with a total length of approximately 515 m, with the required wells, entrances and / or drops and wells of micro-rains. It is also contemplated the construction or reconstruction of twin depressed sewerage drainage ducts in the open, with a total length of approximately 415m. As for the building part of the pumping station, there is a subterranean shaft for the sewage tank and the pump area, and an overground section housing the PC and the electrical panels.

Sewer construction work

Δημοτική Επιχείρηση Ύδρευσης Αποχέτευσης Δήμου Κω (Δ.Ε.Υ.Α.Κ) | Published October 17, 2017  -  Deadline November 28, 2017
cpvs
45232400

The project will be performed in Antimachia, Kamari Kefalos and Mastichari, Kos island.

The scope of the contract includes the construction of integrated and fully operational waste collection and transport networks, covering the settlements of Antimachia, Mastichari (A Phase works) and Kamari (Kefalos beach). The total length of grids is about 48.6 km (37.7 Km gravitational and 10.9 Km depressant pipelines) and includes 9 pumping stations, of which three (A1, Aa and A2) in Antimachia, the three (M1 , M2 and M3) in Mastichari and the other three (K1, K3 and K4) in Kamari.

The waste water from Antimachia and Mastichari will be transferred to the existing Erd Kardamena and from Kamari will be transferred to the supplying projects (Pumping Pump) and to the ETH Head (to be constructed in the framework of an independent contractor).

It also includes the construction of 1,700 private connections in the settlements of Antimachia, Kamari and Mastichari.

Waste-treatment plant construction work

Δήμος Αλιάρτου | Published October 17, 2017
Winner
ΑΑΓΗΣ ΑΕ
cpvs
45222100

The construction of the project includes the construction of the waste water treatment plant of Thespiae and the disposal projects in the recipient river "Akris".

In particular, the following are foreseen:

The EET will be designed to serve the population of the settlements of Mavrommati and Thespion-Leontari for a 20-year horizon (6,000 equivalent inhabitants) and to serve two additional settlements (Askri and Neochori) for a period of 40 years (10,800 equivalent inhabitants). The effluent of the WWTP will be available on the river "Askri". The biological treatment method proposed is the Extended Sludge System with simultaneous biological removal of nitrogen and phosphorus and complete sludge stabilization.

The ETS will include the following processing steps:

- Soil building

- Inlet and pre-treatment unit

- Biological treatment unit

- Sedimentation tank and recirculation tank and excess sludge

- Sliding storage tank

- Disinfection and meta-ventilation unit

- Dehydration building

- Energy plant - bellows

- Chemical building

- Administration building

- External networks - environment configuration

- Electrical installations -

- 6Month test operation automation and control system

Waste disposal projects

Disposal pipeline to the adjacent recipient (11 m PHM Projects). The disposal of the treated sewage from the Alitalia Wastewater Treatment Plant will take place in the adjacent Acskris stream.

The object of the project is also:

a. the preparation of the Final Design, the Implementation Study and any additional study and research,

b. the construction of Civil Engineering projects

c. the supply and installation of all electrical and mechanical equipment

d) the position in efficient operation and

e. the test run of the project ...

Engineering design services for the construction of civil engineering works

Υπουργείο Υποδομών και Μεταφορών/ΓΓΥ/ΓΔΣΥ/Διεύθυνση Λιμενικών Υποδομών | Published October 14, 2017  -  Deadline December 4, 2017
cpvs
71322000

The present study is concerned with the handling of coastal and industrial problems, observed in the fishing shelter and in the wider region of Thermi on the island of Samothraki.

It will be elaborated:

Study of Port Projects,

Surveying - Hydrometers,

Geotechnical Surveys and Studies,

Design of E / M Projects and

Environmental Studies.

SAY-FAI and Tender Documents will be drawn up.

Road-maintenance works

Περιφέρεια Κεντρικής Μακεδονίας, Περιφερειακή Ενότητα Πιερίας, Υποδ/νση Τεχνικών Έργων ΠΕ Πιερίας | Published October 14, 2017  -  Deadline November 22, 2017
cpvs
45233141

The purpose of the present project is to perform works for the maintenance of the 13th "Katerini-Ag. Demetriou-boundaries of the Prefecture "as well as the 17th Provincial Road" chth. 20 + 500 of the 13th - Petra National Road ", whose maintenance competence is the IP Pieria.

The purpose of the present project is to perform works for the maintenance of the 13th "Katerini-Ag. Demetriou-boundaries of the Prefecture "as well as the 17th Provincial Road" chth. 20 + 500 of the 13th -Petra National Road ", whose maintenance responsibility is reserved Pieria. The work planned for the implementation of the project is:

(a) Spillages and cleansing-forming triangular or ridge ditches on a large part of the roads, while removing incidental discharges.

b) Construction of technical works in the framework of maintenance of the existing road techniques (box drains, serazaneti, flooded trenches etc.) and / or construction of new techniques for interventions restoration of local road stents based on the resulting needs and evidence of the Agency construction of new serazaneti for sloping slopes, construction of concrete C20 / 25 concrete boxing, etc.).

(c) Restoration of damaged asphalt decks

(d) Road marking and signaling works.

Construction work for electricity power lines

Διαχειριστής Ελληνικού Δικτύου Διανομής Ηλεκτρικής Ενέργειας | Published October 13, 2017  -  Deadline November 30, 2017
cpvs
45231400

This Notice concerns a contract, which constitutes, in accordance with the provisions of Directives 24 and 25/2014 EC. and Law 4412/2016, the framework for conducting a tender for the construction of distinct projects, covering five regions of the country, in order to ultimately become concessionaires in total to fifty-five (55) Contracts (Projects).

Construction and maintenance of electricity distribution networks M. & KT

The detailed definition of the geographical areas where the work of each Project (Project) of this Declaration will be carried out, as well as the description of the works, will be made in the "Agreement".

Scada or equivalent system

Δημοτική Επιχείρηση Ύδρευσης Αποχέτευσης Ξάνθης | Published October 12, 2017  -  Deadline November 30, 2017
cpvs
42961200

This study describes the required equipment and technical specifications for a system for automatic management, leakage control, quality control and decontamination of drinking water, which will be installed in the water supply network of DYAA of Xanthi, Stavropoli, which merged with the Municipality of Xanthi.

The system will be the extension of the MOSCAD (Motorola SCADA) Telecontrol / Remote Control System, which has already been installed and operated for 10 years. The installed MOSCAD system includes one (1) Central Control Station (ΚΣΕ) and twenty (20) Local Stations The present study enhances the operation of existing TSEs, adding to them more controls and manipulations, and at the same time extends the system with fifty six (56) new TSEs, which will control the operation of 56 existing HVs (hydro-drilling ), DD (tanks) ) And PM (pumping) of the external aqueduct in the municipality. The 56 new TSEs will be interconnected with the existing system, and will communicate, exchanging data, without any limitation with the existing TSEs and CPSs. Deliverables of the procurement will include the following equipment:

56 TSE

15 Photovoltaic systems

33 Pressure gauges

61 Level meters

75 Level switches

24 Turbidity meters

24 Conductivity meters

24 Meters of nitrate

36 pH Meters

36 Cl

85 Hydrometers

20 Electrobanks

1 Electric shuttle

35 Water disinfection systems

41 Starting and protection systems for pumps

6 Security and Access Control Systems

76 Automation cabinets

The procurement will include all equipment, site delivery, unloading and storage, transport and lifting, construction, facilities, controls, commissioning and testing as well as the required interconnection work with the existing Remote Control / Remote Control system.

Road construction works

Περιφέρεια Ηπείρου, Γενική Διεύθυνση Αναπτυξιακού Προγραμματισμού, Περιβάλλοντος και Υποδομών, Διεύθυνση Τεχνικών Έργων Περιφερειακής Ενότητας Ιωαννίνων | Published October 11, 2017  -  Deadline November 16, 2017
cpvs
45233120

The main character of the project is the linking of the under construction of the Ionian Motorway with the Tzoumerka area, so as to allow rapid and safe access to the settlements of the area from the new motorway. More specifically, the main object of the project is identified by the main road link, the Terminal of the Ionian Road (on the 7th District Road of Ioannina-Pigadia) with the 2nd District Road of Ioannina - Plaka Bridge.

According to the decision No 80400 / 07-06-2016 (AEO: ODBC-OG9) Environmental Approval (AEPO) paragraph 7.2.16 a planting study should be carried out which will be approved by the competent forestry authority on all surfaces which are affected by the project as a whole and which are susceptible to vegetation, as well as the planting works that begin immediately on each part of the project where the earthworks have been completed and the final surfaces have been formed. The planting study as well as the planting work shall be borne by the contractor.

Electricity

Ανώνυμη Εταιρεία Διαχείρισης Ανανεώσιμων Πηγών Ενέργειας με διακριτικό τίτλο ΔΕΗ Ανανεώσιμες ΑΕ | Published October 11, 2017  -  Deadline October 19, 2017
cpvs
09310000, 45251160, 45233140

Study and construction of infrastructure projects of 10 wind farms with a total capacity of 19,80 MW in the following locations: Marmari, Evia Power 5,40 MW, Perdiki Ikarias Power 0,90 MW, Agios Ioannis Karpathos 0,90 MW, Sigri Lesvos Power 2,70 MW , Vigla Lemnos Power 0,90 MW, Pythagorion Samou 1.80 MW, Chios Melanium 2.70 MW, Prophet Ilias Psia Power 1.80 MW, Chios River 0.90 MW and Mykonos Fryllus 1.80 MW , a total indicative budget of EUR 5 230 000, excluding VAT or EUR 6 485 200, including VAT, currently at 24%.

Technical inspection services of engineering structures

Εταιρεία Διανομής Αερίου Θεσσαλονίκης Θεσσαλίας Α.Ε. | Published October 7, 2017
Winner
Εταιρεία Διανομής Αερίου Θεσσαλονίκης Θεσσαλίας Α.Ε.
cpvs
71631400

The services include Third Party Inspection and Works for the construction of a medium pressure (steel) and Low Pressure (steel and polyethylene) natural gas distribution network as well as for the construction of pipelines and drainage columns in the Prefecture of Thessaloniki and in the region of Thessaly.

Road construction works

Περιφέρεια Κεντρικής Μακεδονίας Υποδιεύθυνση Τεχνικών Έργων Περιφερειακής Ενότητας Θεσσαλονίκης | Published October 7, 2017  -  Deadline December 1, 2017
cpvs
45233120

The project belongs to the category of road works. The work involves the repair, construction and maintenance of techniques, kennels and manholes, the dismantling and replacement of safety rods, the healing of limited extents, the replacement of railings, the raising or demolition of manholes, the direct operation of machinery (trailer, obstruction and tanker); emergency services, on parts of the Provincial and National Road Network, the responsibility of the Ministry of Transport. Thessaloniki.

Construction work for gas pipelines

Εταιρεία Διανομής Αερίου Θεσσαλονίκης Θεσσαλίας Α.Ε. | Published October 7, 2017
Winner
Εταιρεία Διανομής Αερίου Θεσσαλονίκης Θεσσαλίας Α.Ε.
cpvs
45231220

Performing operations of expanding a low pressure (4 bar) polyethylene (PE) natural gas network, manufacturing pipelines for residential and industrial customers and manufacturing welded or threaded risers and associated gas points, for gas distribution as well as the Emergency Service for incidents of immediate intervention, network maintenance and execution of works of medium pressure (19 bar) steel and low pressure (4 bar), in the prefectures of Thessaloniki, Larissa, Magnesia Trikala and Karditsa for the years 2017-2018.

Works of Part 1 will include:

Expansion of about 28,000 meters of a low pressure polyethylene (PE) gas network (4 bar).

Construction of approximately 789 service lines for residential and industrial consumers in the gas distribution network.

Construction of about 4,300 Gas Points on Risers with welding or thread for gas distribution.

Expansion of approximately 530 meters of medium pressure natural gas (19 bar).

Installation of about 1 Intermediate Reduction Station (IRI).

Installation of about 1 reduction and measurement station (GRM).

Installation of about 4 compressed natural gas (CNG)

Emergency Service Emergency Service in the Prefecture of Thessaloniki

Maintenance of natural gas network.

Works for Thessaloniki Metro.

Works of Part 2 will include:

Expansion of about 28,500 meters of a low pressure polyethylene (PE) gas network (4 bar).

Construction of approximately 1,183 Service Lines for domestic and industrial consumers in the gas distribution network.

Construction of approximately 4,775 Gas Points on Risers by welding or threading for gas distribution.

Expansion of about 500 meters of natural gas network of middle ...

Motorway construction works

Εγνατία Οδός Α.Ε. | Published October 7, 2017
Winner
ΑΚΤΩΡ Α.Τ.Ε.
cpvs
45233110

The main project of the project is the construction of the Thessalonica Toll Station on the Egnatia road, as impressed by the KYA. 6686 / 14.11.2014. The technical scope of the project includes the necessary widening of the pavement, the construction of retaining walls and the displacement of the adjacent roads, where necessary, for the construction and construction of the toll station, the construction of a suitable pavement, the construction of a building building and the collecting huts, the supply and installation of E / M equipment, the construction of a metallic shelter and the signage - insurance in the area of ​​the toll station and any other work to make the St Tougher Thomas ready for operation. The project includes earthworks, techniques, pavement, asphalt, lighting, road safety, building, water, sewage and E / M installations and equipment.

As in II.1.4.

Specialised boats

Περιφέρεια Δυτικής Μακεδονίας — Περιφερειακή Ενότητα Καστοριάς | Published October 6, 2017  -  Deadline November 10, 2017
cpvs
34521000

The multimechanism will be of metal construction according to the prevailing practice - its requested functions are:

1) The cutting and grubbing of reeds and the collection of floating lakes.

2) The loading of the above materials (reed-reels)

3) The disposal of the stored materials as a motor vehicle. It will have a pump / pressure cleaning unit. Finally, there will be a provision for adding oxygenation equipment to the surface water of the lake in the future.

The depth of displacement of the machine in the water will be small, with a full load immersion not exceeding 0.6 m, so even when loaded with a very large mass of cutting products it will still be very flexible and efficient yet and in inaccessible and shallow areas where work will be difficult. Cutting products will then be placed directly on the shore with the help of two-way conveyor movement. The requirement of a maximum sink of 60 cm applies to cases where reed cutting operations are carried out, so the multi-machine must be driven to the shallow. There is no such requirement for a sinking limit on normal cruising or other operations, which may add extra weight due to the accessories (additional equipment of the current supply and future equipment requirements) and freight. It is stressed that the in-store storage area should be at least 10 m3 while the mass that can be loaded on the waterway should be at least 1000 kg.

The whole construction will be done according to the standards of modern shipbuilding technology. Together with the offer to present a sophisticated equilibrium study of the machine (hydrostatic diagram). Also at four points of the boat there will be suitable mooring elements, which will be in such positions so that it can securely attach the machine for its loading in case m ...

Sewage work

Περιφέρεια Δυτικής Ελλάδας / Διεύθυνση Τεχνικών Έργων | Published October 6, 2017
cpvs
45232420

Construction of Sewage Disposal Network and Main Sewerage Pipeline with Pumped Water Treatment Plant of the Municipality of Milos.
Categories
  Greece - Show all countries
Athens (278)Athens (140)Thessaloniki (27)Thessaloniki (19)Komotini (16)Ioannina (15)Lamia (14)Larisa (14)Thermi thessalonikis (12)Tripoli (12)Ioannina (11)Karyes (11)Larisa (11)Patra (11)Piraeus (10)Chalandri (9)Chania (9)Heraklion (9)Sparta (9)Galatsi (8)Heraklion (8)Piraeus (8)Volos (8)Chania (7)Chalkida (7)Kilkis (7)Kozani (7)Ormylia (7)Sparta (7)Θέρμη θεσσαλονίκης (7)Chalandri (6)Kastoria (6)Lamia (6)Patra (6)Rhodes (6)Chalkida (5)Irakleio kritis (5)Marousi (5)Pallini (5)Rethimno (5)Rhodes (5)Samos (5)Kavala (4)Thermi thessalonikis (4)Ag. stefanos (3)Amfissa (3)Argostoli (3)Asklipieio (3)Chrysoypoli kabala (3)Giannitsa (3)Igoumenitsa (3)Karditsa (3)Kavala (3)Kallithea (3)Karditsa (3)Mytilene (3)Pyrgos (3)Rethimno (3)Salamina (3)Thiba (3)Veroia (3)Zakinthos (3)Θέρμη (3)Ορεστιάδα (3)Χαλάνδρι (3)Χαλάνδρι (3)Agios athanasios (2)Alexandroupolis (2)Argostoli (2)Acharnes (2)Ag. paraskeyi attikis (2)Agrinio (2)Alexandria (2)Alexandroupolis (2)Aliartos (2)Amaliada (2)Amyntaio (2)Corinth (2)Drama (2)Dadia (2)Drama (2)Eleytheroypoli (2)Edessa (2)Filippiada (2)Gerakas (2)Ierissos (2)Karpathos (2)Kassandreia (2)Kozani (2)Levkada (2)Leros (2)Limenas chersonisoy (2)Marousi (2)Markopoylo mesogaias (2)Megara (2)Orestiada (2)Perama (2)Prebeza (2)Skimatari (2)