Building construction work

Τεχνικό Επιμελητήριο Ελλάδας | Published September 13, 2016  -  Deadline December 6, 2016
Building construction work

Substation construction work

Δημόσια Επιχείρηση Ηλεκτρισμού Α.Ε., Διεύθυνση Μελετών Κατασκευών Θερμοηλεκτρικών Έργων | Published October 13, 2016  -  Deadline October 31, 2016
Substation construction work

Parts of machinery for mining, quarrying and construction

Δημόσια Επιχείρηση Ηλεκτρισμού Α.Ε./Διεύθυνση Υλικού και Προμηθειών | Published September 22, 2016  -  Deadline October 24, 2016
Parts of machinery for mining, quarrying and construction

Real estate services

Υπουργείο Υποδομών Μεταφορών και Δικτύων, Γενική Γραμματεία Υποδομών, Ειδική Υπηρεσία Δημοσίων Έργων Κατασκευής Έργων με Σύμβαση Παραχώρησης Πελοποννήσου και Βορείου Ελλάδος | Published August 10, 2016  -  Deadline October 25, 2016

Valuation of real estate and their components, which necessarily be expropriated for the construction of the project implemented with the Concession Agreement "Elefsina-Corinth-Patras-Pyrgos-Tsakona".

Engineering-design services for traffic installations

Υπουργείο Υποδομών, Μεταφορών και Δικτύων / Γ.Γ.Υ. / Γ.Δ.Σ.Υ. / Διεύθυνση Οδικών Υποδομών (Δ.Ο.Υ.) | Published August 9, 2016  -  Deadline October 25, 2016

The object of the study involves the construction of the new alignment of the road Neochoraki - An. Orifice Tunnel Timfristos in manufacture shaft Lamia - Karpenisi, the estimated length of 19 km., With the axis connecting nodes to the existing network and the settlements. It includes:

a) The establishment of three (3) separate contracts with different contractors to prepare the corresponding preliminary studies and

b) the conclusion of a contract with one of the top contractors to prepare the preliminary design of the upper and of the other after the preliminary design stage.

Engineering design services

Υπουργειο Υποδομων, Μεταφορων Και Δικτυων, Γ.Γ.Υ., Γ.Δ.Υ.Κ.Υ., ΔΑΕΕ Διεύθυνση Αντιπλημμυρικών και Εγγειοβελτιωτικών Έργων | Published August 4, 2016  -  Deadline October 25, 2016

The subject of the study included:

- The arrangement of the river Pamissos from Ari dam to the mouth of the sea in a length of 9 km. About.

- The arrangement of the stream Bouka and contributors streams, 10 km. About.

- The arrangement of the stream Atoll from bridge to Aipeia settlement until AK 18 (Messina-Thouria), length 5 km. About.

- The delimitation of these segments.

- The control of both the actual operation of the atoll barrier on p. Pamissos and its role in flood protection of the area and the construction of the dam, under which and if necessary will a study of maintenance works. Also as part of interventions in the dam will be prepared for maintenance and operation manual.

- Environmental enhancement and development of the area of ​​the mouth of Pamissos river and riparian zone from the mouth to the bridge area of ​​Kalamata - Messina, namely a length of about 3,5 km and the area of ​​the mouth of the flood channel in Koulntouki Bouka Messina.

- H improve the existing breakwater to protect the mouth of p. Pamissos.

- The construction of the footbridge p. Pamissos linking the western shore of Kalamata with the east bank of Messina.