Call +44 800 9755 164

Public tenders for construction in Villiers-le-bel France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionFrancevilliers-le-bel

Architectural, construction, engineering and inspection services

EHPAD Mer et Pins | Published November 9, 2016  -  Deadline December 16, 2016
Construction of a new building housing a nursing home with 82 beds Alzheimer units. The new building will not host for preparation kitchen or laundry room, these functions being centralized at the level of the institution.

Construction of a commercial building

Commune yvre l'eveque | Published November 25, 2016  -  Deadline December 16, 2016

TR201602 | Construction of a house and child services

COMMUNE DE PLELAN-LE-GRAND | Published November 4, 2016  -  Deadline December 5, 2016
Building a house of children and works contract services to build a House of Children and Services operation in 2 tranches; - A firm phase mainly comprising the following units: ALSH, multi-home, Kids zone - an optional slice mainly comprising the following units: PHSP social duties The building will be exemplary environmental; it will be passive with a certification goal << >> Building biobased level 1. The following environmental targets: air quality, a low-nuisance, energy management, maintenance and sustainability of the performance of high performance level according to the HQE. The floor surface of the equipment will be 1 920 m2 with the following breakdown: 1450 m2 for the firm phase and 470 m2 for the optional tranche (5500 m2 of outdoor facilities).

Multi-dwelling buildings construction work

Société immobilière de la Guadeloupe | Published October 27, 2016  -  Deadline December 13, 2016
CF electricity and solar energy Cf. plumbing lifts.

Construction of the new urcc

Hopitaux du leman | Published November 28, 2016  -  Deadline December 30, 2016

Building construction work

Ville de Balaruc-les-Bains | Published November 16, 2016  -  Deadline December 12, 2016

The planned facilities will be created in 2 buildings.

Platforms - earthworks.

Foundations - structural work.

Carpentry - roofing - siding - sectional doors.

thick mineral coating facades.

flooring Lyon play.

Sports equipments.

scenic Locksmith.

Electricity and stage equipment.

Seal.

Exterior wood furnishings.

Locksmith.

Partitions - false ceilings - dubbing.

Interior woodwork.

Tiles - tiles.

Painting - signage.

HVAC - Plumbing - ventilation.

Electrical engineering - low currents.

Kitchen room.

Elevator.

Wet road networks.

dry networks.

Green spaces.

Road bridge construction work

Conseil départemental des Alpes-de-Haute-Provence | Published November 2, 2016  -  Deadline December 8, 2016
The contract involves the reconstruction of Manosque bridge over the Durance upstream of the existing bridge on the RD 907 to PR 17 + 500 with the demolition of the existing suspended work and the realization of two retention ponds a capacity of 240 m  3  each.

Works for complete or part construction and civil engineering work

Département de la Sarthe | Published November 18, 2016  -  Deadline December 23, 2016

Procurement by open tender.

The turnaround time for all lots including the preparation period is 23 months from the date determined by the service order will prescribe to begin execution / first (s) lot (s ) following the implementation schedule. For information, the start of work is planned for May 2017.

Variants required: Applicants must meet the imperative variants required for lots 7, 9, 10, 13 and 15.

free variants: Applicants must meet the basic solution, the minimum requirements are that of the base solution.

See details in own CCTP each lot.

Works for complete or part construction and civil engineering work

Département de la Sarthe | Published November 22, 2016  -  Deadline December 23, 2016

contract awarded by open tender

The turnaround time for all lots including the preparation period is 23 months from the date determined by the service order will prescribe to begin execution / first (s) lot (s ) following the implementation schedule. For information, the start of work is planned for May 2017.

Variants required: Applicants must meet the imperative variants required for lots 7, 9, 10, 13 and 15.

free variants: Applicants must meet the basic solution, the minimum requirements are that of the base solution.

Architectural, construction, engineering and inspection services

Tunnel Euralpin Lyon Turin SAS | Published October 12, 2016  -  Deadline December 2, 2016
Lot 3 concerns the excavation of about 2 to 2.5 km of underground structures to the axis of the tubes, ancillary works such as rooms, niches, twigs, ... as well as associated external works for the management of excavated materials, transportation, and logistics sites.

programming mission for the construction of a unit producing fungi

Communaute d'agglomeration du puy | Published November 21, 2016  -  Deadline December 22, 2016

Acquisition, construction and installation of a modular building to house the Entrepont

Ville d'issy-les-moulineaux | Published November 23, 2016  -  Deadline December 12, 2016

Construction of 15 houses in homeownership in the Bois HAILLICOURT- Baudets

Scp coopartois | Published November 21, 2016  -  Deadline December 14, 2016

This consultation concerns the execution of construction of a school and a restaurant courtyard in Saint Gervais BelinLa this special procedure is subject to d

Commune de saint gervais en belin | Published November 18, 2016  -  Deadline December 19, 2016

Construction work for engineering works except bridges, tunnels, shafts and subways

Commune de Vitry-le-François | Published November 18, 2016  -  Deadline December 16, 2016
Thus, the present consultation concerns the development work of the edge of the mall Hamois. 

This includes a firm - on the organization of the court of the mall (parts contiguous to the streets of Abraham Moivre and Paul Foureur) - and an optional bracket - on the organization of the main car park and its surroundings.

It is divided into 3 lots: Transport infrastructure development, concrete coating plants - green spaces.

separate market for optional phases.

Firm phase: planning of the shopping center of the court.

Optional Unit 1: Planning the main car park and its surroundings.

Pickets, stripping topsoil, excavation of all types, production techniques embankments, setting the final disposal of surplus land, temporary signs, performing searches, supply and installation of pipelines, installation of dry networks, backfill all excavation, transportation to places deposit excess materials, production curbs and gutters, formwork and pouring concrete bench, supply and installation of street furniture, implementation of bituminous concrete, vertical and horizontal signaling installation.

Preparation and pouring of concrete coatings.

Stumps of trees felled by the city, protection of existing trees preserved earthworks, drainage ditches tree fund, soil preparation, planting pits opening, supply and installation of substrates planting soil enrichment, provision and planting plants with back guarantee, provision and implementation of maintenance accessories, maintenance substrates, warranty period and maintenance for 1 year running conclusion.

project management contract for the construction of a cultural center - stage of selection of applications

Ville du pian medoc | Published November 8, 2016  -  Deadline December 1, 2016

Implementation and monitoring of technical, architectural and environmental program for the construction of a university building said "first stone val d'Europe" on the site of Serris (

Universite paris est marne-la-vallee | Published November 8, 2016  -  Deadline December 5, 2016

General contractors for the construction of a bridge over the Cheran between the towns of Boussy and Rumilly

Communaute communes canton de rumilly | Published November 28, 2016  -  Deadline December 20, 2016

works contracts for the construction of sea School of Port Camargue - lot Recovery 15 EQUIPMENT KITCHEN

Regie autonome de port camargue | Published November 10, 2016  -  Deadline December 1, 2016

project management contract for the construction of 10 collective rental housing for seniors and 13 collective garages Freedom Square in Montmorot

Office public habitat du jura (oph 39) | Published November 23, 2016  -  Deadline January 9, 2017