Call +44 800 9755 164

Public tenders for construction in Toulouse France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work for university buildings

Université Paul Sabatier | Published November 19, 2016  -  Deadline January 12, 2017

Construction of the building 4R4, Integrative Biology Center (CBI) in connection with the operation Campus Toulouse - Toulouse University Paul Sabatier 3.

Lot 1 Excavation - VRD-green areas.

Lot 2 Foundations-shell.

Lot 3 Metal framework.

Lot 4 Cladding-Brise sun.

Lot 5 Sealing.

Lot 6 outdoor-joinery walls curtains.

Lot 7 Locksmith.

Lot 8 internal-rating Joinery.

Lot 9 partitions suspended ceilings.

Lot 10 coverings of ceramic tiles.

Lot 11 of flexible floor coverings.

Lot 12 Painting.

Lot 13 furniture.

Lot 14 Sanitary plumbing.

Lot 15 heating ventilation and air treatment.

Lot 16 Specialty Fluids.

Lot 17 Electricity strong currents.

Lot 18 low-current electricity.

Lot 19 Building management.

Lot 20 SSI.

Lot 21 elevators.

Lot 22 partitions and ceilings laboratory.

Lot 23 laboratory furniture.

Lot 24 autoclaves.

Lot 25 Management clean and dirty bedding.

Lot 26 Transfer animals.

Lot 27 Cabin washing cages / sas H2o2.

Lot 28 Washing / Filling bottles.

Building construction work

SA HLM des Chalets | Published November 15, 2016  -  Deadline December 14, 2016

Construction de 85 logements.

Construction de logements collectifs.

Architectural, construction, engineering and inspection services

INSA de Toulouse | Published November 15, 2016  -  Deadline December 12, 2016

The work re Masters contest is held for the construction and restructuring for the implementation of TWB on the INSA campus in Toulouse (31). In a landscape of restructuring dynamics of research, INSA Toulouse, with the support of other guardianships, INRA and CNRS, the support of CGI, Toulouse metropolis and the region wishes to bring the implementation project TWB on campus that will be made an extension and enhancement of the project carried out MB3 in the Toulouse campus project.

The project is funded by:

The state, through the State-Region plan contract.

The state, through funding National Research Agency (ANR interests campus operation).

Occitan region through the State-Region plan contract.

Toulouse metropolis through the State-Region plan contract.

Exhibition centre construction work

Europolia mandataire Toulouse Métropole | Published November 2, 2016  -  Deadline January 13, 2017
fixed and dynamic signage, cut sheet steel, paint signs, plexiglass element with integrated backlighting, signage, furniture to measure, including concrete base, signage slinging support, LED screens.

Track construction works

Communauté urbaine Toulouse Métropole | Published November 5, 2016  -  Deadline December 14, 2016
Mowing - watering.

Architectural, construction, engineering and inspection services

CNRS — délégation Midi-Pyrénées | Published November 18, 2016  -  Deadline December 16, 2016

Diagnosis, basic missions: Summary preliminary project, final proposed draft / draft of studies, assistance for the award of works contracts, compliance review-visa Enforcement Branch of the works contract, assistance during receive operations.

complementary missions: Mission 1: Organization management Coordination; Mission 2: Synthesis; Mission 3: Development of administrative and regulatory issues and assistance to the Client in trade with the administrations concerned; Mission 4: Establishment of technical specifications diagnostics markets and further studies; Mission 5: Project signage for spaces Outside the limit of the perimeter work; Mission 6: specific studies in connection with the energy Performance and Environmental Quality approach: energy saving Certification (Cee), Thermal Dynamics Simulation, Test air, operating Folder and maintenance.

See Article 1 of the consultation law No. 16361 of 21/10/2016 available at the following address:

https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=309688&orgAcronyme=f2h

Architectural, construction, engineering and inspection services

CHU Toulouse | Published November 9, 2016  -  Deadline December 2, 2016
This consultation concerns the award of a single-attribute framework agreement diagnostic and project management. The framework agreement relates to diagnostic missions and project management on La Grave sites and Hotel Dieu with a majority of listed buildings. Excluded from this framework agreement operations requiring project management competition, specialized technical operations and the services covered by the framework agreement of mastery of work "general" of the notified CHU 19/09/2016.

Works for the construction of a cattle barn with workshop and milk drying barn on the farm of Saint-Médard for lepa Saint Gaudens (No. 50117 operation)

S.p.l midi-pyrenees construction | Published November 25, 2016  -  Deadline December 20, 2016

Redevelopment of the multipurpose room and associative local building

Commune de bram | Published November 30, 2016  -  Deadline January 6, 2017

Damage or loss insurance services

INSA de Toulouse | Published November 19, 2016  -  Deadline January 4, 2017

This consultation focuses on construction insurance services for a construction operation of the laboratory of Microbiology, Biocatalysis, bioproducts and bioprocesses (MB3) at the National Institute of Applied Sciences of Toulouse (INSA).

Insurance "bad work and collective contract of decennial liability."

Insurance "All risks yard."

Insurance "Civil liability of the developer '.

General assistance to management and management companies for the regional epl gie Midi-Pyrénées, the week COGEMIP and spl midi-pyrenees building

Groupement d'interet economique | Published November 30, 2016  -  Deadline January 4, 2017

Architectural, engineering and planning services

Université Toulouse 1, sciences sociale | Published November 15, 2016  -  Deadline December 12, 2016

The contract follows the termination of a previous contract for the same purpose. Operation is to new construction of a building to accommodate the Toulouse School of Economics (Toulouse School of Economics - tse) for research and located south of the island of the arsenal site (31000 Toulouse). The building will have nine levels (two basements, a ground floor and six floors) with a floor area of ​​11,280 square meters. Works contracts are vested in 15 separate lots. The cost of carrying out such work is clear from initial amounts of contracts with companies is 29 898 350.82 EUR (VAT).

The licensee's mission includes the operation and benefits during the following three phases:

1. Site preparation

2. Execution of works contracts

2. Assistance to receiving operations.

It does not include the management of disorders occurring during the period of perfect completion.

Technical inspection and testing services

INP de Toulouse | Published November 10, 2016  -  Deadline December 14, 2016

The purpose of the consultation concerns the operations of required periodic checks and inspections to be carried out at the National Polytechnic Institute of Toulouse (INPT) in accordance with current legislation (Decrees of 06.25.1980 and amendments; orders of 26.2. 2003; decrees No. 88-1056 of 14.11.1988; the Labour code; the code of Construction and housing; safety regulations for ERP; non-exhaustive list).

Total floor area of ​​the heritage of the INPT: 92249 m 2 .

Lot 1 concerns the periodic checks and inspections carried out by approved bodies.

Lot 2 concerns the periodic checks and inspections carried out by "qualified technicians" for fire safety systems and smoke.

Lot 3 for periodic audits and inspections carried out by "competent technicians" for security lighting.

Lot 4 for periodic audits and controls carried out by "qualified technicians" for automatic doors and gates.

Lot 5 for periodic audits and inspections carried out by "competent technicians" for lifelines and anchors.

Lot 6 for periodic audits and inspections carried out by "competent technicians" for backflow preventers on AEP networks for fire hydrants.

  • 1