Call +44 800 9755 164

Public tenders for construction in Strasbourg France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Primary school construction work

SERS | Published November 3, 2016  -  Deadline December 8, 2016
Outdoor Facilities.

Architectural, construction, engineering and inspection services

CUS Habitat — Office public de l'habitat de l'eurométropole de Strasbourg | Published November 4, 2016  -  Deadline December 5, 2016
Candidates must present alone or in a consortium, the following skills:

Architectural, construction, engineering and inspection services

DRE Alsace | Published December 7, 2016  -  Deadline January 23, 2017

The operation concerns the implementation of the current section of the second phase of the ring road south of Strasbourg (Rn353) between the south roundabout interchange Geispolsheim (A35 / RD400) and interchange Fegersheim (Rn353 / Rd1083). It also includes the demolition of the southern floor of the a35 and a work of art, rendered useless due to the shift of the southern floor of the a35.

Consultant's job mainly consists of mission elements act, det, aor, defined in Annex III to the decree of 21.12.1993, specifying the technical procedures for implementing the project management mission entrusted by elements of public clients in private law providers. Two complementary missions are assistants (Mc1 Inspection prior to commissioning (IPMS) and Mc2 Definition of operational measures of roads during construction (Exploit)).

Share of VAT provisional budget allocated to the works by the contracting authority: 20 meur ht value in October 2014.

Architectural, construction, engineering and inspection services

Eurométropole de Strasbourg | Published November 23, 2016  -  Deadline January 10, 2017

Design and implement the revamping of the plant: Living area: 3500 m 2 - 4000 m 2 , Max:> 25 m without changing the reported expenses, eventual treatment of the metal frame: fire, corrosion. Design and implement the renewal of electrical networks and other: quantities electrical cables: several hundred meters, all sections - quantities other networks: unknown - recharge all industrial equipment (furnaces, boilers), machinery, auxiliaries, making regulatory level switchboards, SSI renewal. Design and produce the inner lining of the sheath of the elevator, various works. BASE mission with EXE + DIA + OPC + SSI + REL + SIGN. estimated share of the financial envelope for the work: € 2.5 million before tax. Estimated intervention period: May 2017 to December 2019 with final completion of the single market to guarantee farm .Tranche optional tranches: Mission BASE with EXE.

Optional single market closes .Tranche tranches: Mission BASE with EXE + DIA.

DC6515VC | construction of the new theater in Strasbourg Link Lots 4, 7, 10 and 12

Ville de Strasbourg | Published November 28, 2016  -  Deadline January 10, 2017

DC6515VC4_PL Construction of the new theater of Link in Strasbourg. Territory of the City of Strasbourg, revival of lots 4, 7, 10 and 12

Ville de strasbourg | Published November 25, 2016  -  Deadline January 10, 2017

DC6528VA | Mission planning studies for the construction of a new school on the site of the School of the teaching and education (ESPE) in Strasbourg - Meinau

Ville de Strasbourg | Published November 21, 2016  -  Deadline December 20, 2016

DC6528VA - Mission planning studies for the construction of a new school on the site of the School of the teaching and education (ESPE) in St

Ville de strasbourg | Published November 18, 2016  -  Deadline December 20, 2016

Heating, ventilation and air-conditioning installation work

Ville de Strasbourg | Published November 29, 2016  -  Deadline January 10, 2017

Dc6515vc3 Construction of the new theater Link in Strasbourg revival of Lots 1, 3 and 11 ordinary market.

Hot water production by exchange substation connected to the urban network, water chiller cold air cooled monobloc unit, distribution of hot water and chilled water, ventilation of all premises building air conditioning mandatory variant theaters 1: Air conditioning split the training room and meeting room R + 1.

site installations, earthworks, deep foundations and low slab work superstructure, implementation sails, concrete slabs beams cast in place including frames, framing mandatory Variant metal structure 1 Concrete Fronts: gray concrete stained black instead of mass dyed mandatory Option 2: Removing interior architectural cladding Variant mandatory 3: Changing the shuttering skin.

Sets automatic sliding doors and fixed frame, exterior steel joinery: all fixed and sashes, fixed sets, curtain wall: - Mandatory Option 1: Replace the curtain wall type 03bis by aluminum curtain walls - mandatory variant 2: Change the type of profile North facade frame - mandatory option 3: facade curtain wall south, cross the optional sliding glass -Variante 1: modification of the curtain wall of the south facade -Variante optional 2: modification of the glass sliding frame r + 1 North facade.

Drilling and exploration work

Électricité de Strasbourg | Published December 3, 2016  -  Deadline January 11, 2017

Works include the construction of two drilling 3500 meters, energy supply, the supply and transport of tubing and accessories necessary for the execution of works, the screw Services tubing, cementing, deviation, providing drilling tools and accessories, providing the sludge product manufacturing, processing services, disposal and landfill of waste, logging services, and mud-logging.

Concrete piles

Port autonome de Strasbourg | Published November 29, 2016  -  Deadline January 13, 2017

The works mainly comprise the design studies and construction of:

- Drilled foundation piles cased by 1,200 mm Ø 15 m: 56 units

- 2 * Longrine of reinforced concrete foundation, 140 ml length: about 650 cubic meters,

- Supply and installation of rail-type PRI 85 r 87 MRS was 280 ml.

ordinary single market.

Environmental improvement works

Habitation Moderne | Published December 3, 2016  -  Deadline January 3, 2017

design-build contract for improving the energy and environmental performance of buildings 12 "Quarter Green Mountain" in Strasbourg.

The site consists of 12 buildings with 367 housing to rehabilitate approximately 28,000 m 2 SHAB. These buildings are supplied with heat and domestic hot water (DHW) by 12 collective boiler located in the attic of each building.

The contractor will be responsible for the design and construction of a program covering:

- On energy renovation of buildings.

- On that a mission of information, and awareness of tenants and technical staff of Modern Housing will integrate well as a monitoring of consumption on the 3 full years following receipt of the work.

From an energy and environmental point of view, the holder must undertake, inter alia, the following objectives:

- Achieve a minimum level of consumption of conventional energy label "BBC reno"

- Achieve and maintain a level of power consumption observed and measured sensor for heating and DHW, for - 50% compared to baseline.

The provisional budget allocated to the project is 6.8 million euros HT based on the program that will be provided to the selected candidates.

The successful tenderer will be given a contract with a commitment to a price, a fixed amount of work, energy objectives and overall timetable intervention.

The entire mission of architectural and engineering design and construction work that follow will be for his own account.

Using a design-build contract is justified under the subject of the contract and Articles 33 II of Ordinance No. 2015-899 of 07/23/2015 and 18 of the Law of 12.07.1985 on the mastery public project contracting and its relationship to the masters private project.

  • 1