Call +44 800 9755 164

Public tenders for construction in Saint-nazaire France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionFrancesaint-nazaire

Construction of the rural house

Cte de communes de l'ile d'oleron | Published February 8, 2017  -  Deadline March 15, 2017
cpvs
45212313

Construction of the rural house

CONSTRUCTION OF CIS PONTRIEUX. PONTRIEUX

Sdis 22 | Published February 2, 2017  -  Deadline March 9, 2017
cpvs

CONSTRUCTION OF CIS PONTRIEUX

Construction work

Expansiel Promotion — DOA | Published February 4, 2017  -  Deadline March 3, 2017
cpvs
45000000

Design realization about 59 collective housing, and a Home for All for the city of Chevilly-Larue DRC residence.

Design realization about 59 collective housing in Psla, and a Home for All for the city of Chevilly-Larue DRC residence, Chevilly-Larue, ZAC Sorbiers Saussaies, Lot 7, on a plot of about 2757 m 2 .

The operation is part of an energy efficiency approach RT 2012-10% and certification NF HQE housing and an optimization approach of costs and construction time.

Financing: equity + bank loan.

Master contractor for the construction of a nursery

Cte de communes de l'ile d'oleron | Published February 14, 2017  -  Deadline March 3, 2017
cpvs

Master contractor for the construction of a nursery

Construction of the Municipal Market Maripa-Soula

Mairie de maripa-soula | Published February 15, 2017  -  Deadline March 17, 2017
cpvs
45000000

Construction of the Municipal Market Maripa-Soula

Construction consultancy services

Société du Grand Paris | Published February 10, 2017  -  Deadline March 13, 2017
cpvs
71530000, 71000000, 71321100, 71541000

assistance missions in project management in the field of construction economics and contract management of works contracts.

Société du Grand Paris wants to use a (the) assistant (s) with project management on all structures of the railway network of the Grand Paris Express. The provider has a mission of expertise and support for auditing, monitoring estimates and prices of works contracts and equipment.

Following the II.2.4) Description of benefits is described in the appendix to this notice, downloadable via the procedure described in Section VI.3) Additional Information.

Société du Grand Paris wants to use a (the) assistant (s) with project management on all structures of the railway network of the Grand Paris Express. (S) supplier (s) will (have) an assistance mission with project management, in phase of works for the contract management of works to control the proper execution of works contracts and the appropriate treatment of potential hazards.

Following the II.2.4) Description of benefits is described in the appendix to this notice, downloadable via the procedure described in Section VI.3) Additional Information.

Construction of a multi-activity hall to cultural dominance

Commune de saint christophe de double | Published February 13, 2017  -  Deadline March 13, 2017
cpvs
45000000

Construction of a multi-activity hall to cultural dominance

technical supervisor of construction-development of a sports field

Ville de saint marc jaumegarde | Published February 8, 2017  -  Deadline February 27, 2017
cpvs

technical supervisor of construction-development of a sports field

Mission of project management for the construction of a central kitchen

Cdc du pays de saint gilles cx de vie | Published February 15, 2017  -  Deadline March 14, 2017
cpvs

Mission of project management for the construction of a central kitchen

multi beneficiaries framework agreement for the construction of roads, the construction, maintenance and repair of municipal roads

Commune de chabeuil | Published January 30, 2017  -  Deadline February 27, 2017
cpvs
45233000

multi beneficiaries framework agreement for the construction of roads, the construction, maintenance and repair of municipal roads

road works and construction of a pedestrian bridge Path of Ozon in Chaponnay

Cte cnes du pays de l'ozon | Published February 3, 2017  -  Deadline February 24, 2017
cpvs
45233140

road works and construction of a pedestrian bridge Path of Ozon in Chaponnay

Assistance Mission to project owner for the construction of 98 bed nursing home

Centre hospitalier de st - brieuc | Published February 10, 2017  -  Deadline March 10, 2017
cpvs
79933000

Assistance Mission to project owner for the construction of 98 bed nursing home

programming mission and assistance with project management for the construction of a combat room and a multi-associative structure

Ville de saint-romain-le-puy | Published February 16, 2017  -  Deadline March 10, 2017
cpvs

programming mission and assistance with project management for the construction of a combat room and a multi-associative structure

Motorway construction works

APRR | Published January 26, 2017  -  Deadline February 28, 2017
cpvs
45233110

Châtillon viaducts are mixed structures.

Given the nature of the work and importance of the access means to implement to perform, complete interior control provisions are included in the specifications (internal and external controls).

For information:

Description of structures and access:

Châtillon viaducts are joint works in concrete slabs resting on piles and abutments.

North viaduct has 6 spans for a total length of 220 m and South Viaduct 5 spans with a total length of 196 m.

The underside South viaduct is only accessible by the highway direction Geneva / Macon while North viaduct batteries feet are only accessible by a towpath since 1084 RD in the municipality of Châtillon-en-Michaille .

Analysis of the state of the structure and access to the book:

Some sections of beams of laminated heels.

Their range is the only crossing section in the inner influence of batteries.

Only a mobile carriage supply seems mobilizable on these raceways.

Work to be done:

Resumption of the corrosion protection of all of the steel structure of a surface of 6500 m 2 .

- Establishment of stairs and walk scaffolding on areas identified in CCTP,

- Setting up scaffolding cantilevered advancement,

- dry cleaning,

- Abrasive blasting for obtaining a DS3 or preparation DS 2.5,

- dusting,

- Application layer primary and finish paint.

All the stages of implementation will be in accordance with the provisions of the GTCC easy 56 concerning the protection of metal structures against corrosion.

The same service will occur during the construction period for carrying out checks on the implementation process, the breakpoints for stripping operations, dust, and paint application (total thickness, layer adhesion test, color)

Means of access and protections:

The objective of the operator is to minimize disruption to customers, it is envisaged to carry out the work under scaffolding implemented under viaducts.

The access means hard at work will be installed from the feet of works excluding current section.

In this sense also, evacuation chutes treatment particles will be set up for immediate rejection in processing skips.

This confinement will also ensure better management of conditions of application of anticorrosion complex.

Particular attention should also be paid to networks present in the works.

environmental constraints:

To verify existing paintings, the client will execute withdrawals from the paintings in place to verify the absence of asbestos and lead.

project management contract for the construction of a new wastewater treatment plant in the municipality of Saint-Donan.

Saint-brieuc agglomeration | Published January 31, 2017  -  Deadline March 10, 2017
cpvs

project management contract for the construction of a new wastewater treatment plant in the municipality of Saint-Donan.

OPC Mission (Following termination of the initial mission) and additional benefits - Construction of a power plant

Chu de la reunion | Published February 20, 2017  -  Deadline March 10, 2017
cpvs

OPC Mission (Following termination of the initial mission) and additional benefits - Construction of a power plant

Road bridge construction work

APRR | Published January 26, 2017  -  Deadline February 23, 2017
cpvs
45221111

Upgrade work 5 OA located on A6 direction P / L for the following works:

PICF 309 + 870.

PICF 312 + 180.

PICF 313 + 350.

PIBA 314 + 250.

Preliminary operations:

- Cleaning of the area around the work.

Work done on work:

- Complete reconstruction of the seal including statements sealing,

- Demolition and reconstruction of the GBA,

- Jacking of OA apron 314 + 250,

- Replacement of bridge bearings,

- Repair pavement joints,

- Strengthening vis-à-vis the impact of the top cross by shotcrete,

- Replacement or repair cornices,

- Removal / installation of GC S8,

- Implementation of an SEL on eaves and cornices-cons,

- Delivery / installation cable trays.

Work carried out under item:

- Implementation of barbicans

- Treatment of cracks,

- Recovery degraded concrete beams and abutment OA 314 + 250,

- Uncoupling and re-coupling hitch 2 aprons device

- Repair corrosion protection coupling devices.

Facilities, construction and folding means of access (including scaffolding, etc) 4 u.

Placing two cofferdams and driving diarrhea Creek 4 u.

execution of studies and methods (EQUIP, PPSPS, gluing folder, etc.) 4 u.

Diarrhea networks binding 2 u.

trial tests and control 4 u.

Cleaning of the area around the work 4 u.

Media Preparation including statements 800m 2 .

Supply and implementation of the asphalt layer 8 + 22, including the impregnation layer 790 m 2 .

Removing gutter 30m.

Recovery gutter by concreting including PVC sleeves 30m.

Supply and implementation including statements sealing protection mortar fence 80 m.

planing floor including sawing and waste disposal 550 m 2 .

F ...

Restricted competition of project management for the construction of a alsh to braud and saint-louis

Communaute de communes de l'estuaire | Published January 24, 2017  -  Deadline March 6, 2017
cpvs
71200000

Restricted competition of project management for the construction of a ALSH in Braud and St. Louis

Master contractor for the construction of a greenhouse bioclimatic experimental - Professional high school of fazanis

Ets pub local enst form prof agric lot | Published February 17, 2017
cpvs

PROJECT MANAGEMENT FOR CONSTRUCTION OF GREENHOUSE BIOCLIMATIC EXPERIMENTAL - SCHOOL PROFESSIONAL FAZANIS

Project management for the construction and rehabilitation of alévoles storage of non-hazardous waste on the ISDND

Smictom du centre-ouest | Published February 13, 2017  -  Deadline March 17, 2017
cpvs

Project management for the construction and rehabilitation of alévoles storage of non-hazardous waste on the ISDND