Public tenders for construction in Poitiers France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction of a medical and surgical building on the hospital site of Montmorillon

Chu de poitiers | Published December 14, 2017  -  Deadline February 9, 2018
cpvs
45000000

Construction of a medical and surgical building on the hospital site of Montmorillon

Construction work for engineering works except bridges, tunnels, shafts and subways

SRD | Published November 28, 2017  -  Deadline January 15, 2018
cpvs
45222000

Renewal work starting from HOMMAIZE Part 2.

Building materials

EKIDOM (86) | Published December 1, 2017  -  Deadline January 15, 2018
cpvs
44111000

Purchase of various supplies, products, materials and equipment for Ekidom.

Products suppliers (chemical, cleaning, maintenance, paper ...) - 2 providers maximum will be retained.

Supplier materials (cleaning, drugstore, plastic bags ...) - 2 providers will be retained.

Hardware - Locksmith - Plastic products (Plexiglas) - maximum 2 providers will be retained.

Electricity - Heating - 2 providers maximum will be retained.

Plumbing - Sanitary - maximum 2 providers will be retained.

Products - Materials - Adapted companies or establishments and help services through work (cleaning, maintenance, paper, etc.) - a maximum of 4 service providers will be retained.

Construction Materials - Earthenware - 2 providers maximum will be retained.

Carpentry - Carpentry - 2 providers maximum will be retained.

Paint - Soils - Wallpaper - 2 providers will be selected.

Glazing - maximum 2 providers will be retained.

Technical control services

CHU de Poitiers | Published November 22, 2017  -  Deadline December 19, 2017
cpvs
71356100

Technical control missions in the context of new construction, development or rehabilitation of buildings.

Single-frame master agreement lot 1 on works and equipment less than or equal to 50 000 EUR, multi-award winner lot 2 on works and equipment over 50 000 EUR. University Hospital of Poitiers 90 000 EUR HT per year; Nord-Vienne hospital group: 5,000 EUR HT per year; EFS site of Poitiers 15 000 EUR HT per year.

Technical control missions in the context of new construction, development or rehabilitation of buildings.

- lot 1 single-award framework agreement corresponding to the work operations, equipment ... Less than or equal to 50 000 EUR excl.

Technical control missions in the context of new construction, development or rehabilitation of buildings.

- lot 2 multi-beneficiary framework agreement corresponding to works operations, equipment, ... Exceeding 50 000 EUR HT.

Electrical wiring and fitting work

SRD | Published November 24, 2017  -  Deadline December 14, 2017
cpvs
45311000

Electrical network construction works HTA - Connection of the wind farms of CHAUNAY and LIMALONGES.

Tranche 1: connection of the CHAUNAY wind farms

- option 1: link Limalongs part 1 of 1 cable 240 2 Alu (1),

- option 2: link Limalongs part 1 of 2 cables 240 2 Alu (1),

- option 3: optical fiber.

(1) Note that the completion of this work is conditioned by the signing of the connection agreement by the Producer.

Tranche 2: connection of the LIMALONGES wind farm (1)

- option 1: link Limalongs part 2 of 1 cable 240 2 Alu,

- option 2: link Limalongs part 2 of 2 cables 240 2 Alu.

Drilling under the railway.

Construction of salt shelters for the exploitation center of departmental roads of mirebeau (86)

Departement de la vienne | Published November 21, 2017  -  Deadline December 12, 2017
cpvs

Construction of salt shelters for the Mirebeau Departmental Roads Operations Center (86)

Construction de la nouvelle usine de production d'eau potable de Preuilly - Commune de Smarves

Si des eaux de la vienne | Published September 15, 2017  -  Deadline November 24, 2017
cpvs
45252126

Construction de la nouvelle usine de production d'eau potable de Preuilly - Commune de Smarves

Construction of the new sewage treatment plant in the village of Nieul l'Espoir

Si des eaux de la vienne | Published September 12, 2017  -  Deadline November 17, 2017
cpvs
45232410

Construction of the new sewage treatment plant in the town of Nieul l'Espoir (4,000 PE)

Building-inspection services

Grand Poitiers Communauté urbaine | Published October 18, 2017  -  Deadline November 15, 2017
cpvs
71315400, 71631100, 71631300, 71631400, 71631200

Regulatory audits, technical controls and diagnostics.

Regular periodic inspections of electrical installations, gas, SSI, mechanical smoke extraction.

Regular periodic inspections of playgrounds, goals, equipment, pneumatic equipment, machine tools, power tools, ladders, scaffolding, personal protective equipment, lifting.

Diagnostics buildings, construction and public works.

Pipe inspections.

Technical inspection of light vehicles.

Technical inspection of heavy goods vehicles.

Structural work for the construction of salt shelters and material pens on the site of the future departmental technical center sis zi of the republic in Poitiers

Departement de la vienne | Published October 26, 2017  -  Deadline November 15, 2017
cpvs

Structural work for the construction of salt shelters and material pens on the site of the future departmental technical center sis ZI of the Republic in Poitiers

Construction of a new wastewater treatment plant - Lencloître bourg

Ca de grand chatellerault | Published August 25, 2017  -  Deadline November 6, 2017
cpvs
45232420

Construction of a new wastewater treatment plant - Lencloître bourg

Building demolition and wrecking work and earthmoving work

EPF de Poitou-Charentes | Published October 10, 2017  -  Deadline October 30, 2017
cpvs
45110000, 71500000, 45112300, 45200000

Deconstruction of 2 houses and repairs of a roof in Charentes.

Project management mission requiring the skills: rehabilitation, demolition, asbestos removal, economy construction and structure.

Underwriting of contracts for property and casualty insurance against the construction of the second tranche of restructuring of the Cité Universitaire Rabelais in POITIERS (86).

Crous de poitiers | Published May 17, 2017  -  Deadline June 9, 2017
cpvs
66515000

Underwriting of contracts for property and casualty insurance against the construction of the second tranche of restructuring of the Cité Universitaire Rabelais in POITIERS (86).

Electrical wiring and fitting work

SRD | Published April 26, 2017  -  Deadline June 2, 2017
cpvs
45311000

Construction work for electricity networks HTA - connection of the wind power Leigné-les-Bois - connection of the Photovoltaic Park of Saint-Sauveur.

Connection of the per wind Leigné-les-Bois.

Connection of the photovoltaic park of Saint-Sauveur.

Power distribution cables

Soregies SAEML | Published May 13, 2017  -  Deadline May 29, 2017
cpvs
31320000

Supply of HVA cable in connection with the construction of electrical networks HTA necessary for connection to the public distribution network HTA of the wind farm on the Commune of Leigné-les-Bois.

See the CCTP.

Construction work

CROUS de Poitiers | Published April 20, 2017  -  Deadline May 22, 2017
cpvs
45000000, 45223220, 45261420, 45261000, 45421000, 44316500, 39000000, 45421141, 45330000, 45331000, 45311000, 45432111, 45431000, 45442100, 90900000, 45313100, 45112500, 77310000

The main dominant of the project are: buildings concerned: A / B / C / D current constitution: common premises + 371 buildings housing a total of 420 housing to implement restructuring (change of use of premises) The total duration of operation is 36 months. Initial work will be performed on the C building or ground floor is the administration of the city.

Lot 1-shell.

Lot 2-tightness.

Lot 3-coverage siding.

Lot 4-outer carpentry.

Lot 5-locksmith.

Lot 6-inner carpentry.

Lot 7-arrangement.

Lot 8-plastering, insulation, false ceilings.

Lot 9-plumbing.

Lot 10, heating and ventilation.

Lot 11-electricity CFA CFO.

Lot 12-flexible floor covering.

Lot 13-tiled stove.

Lot 14-painting.

Lot 15-cleansing.

Lot 16-lift.

Lot 17-HHT earth.

Lot 18 green-space.

Single-awarded framework agreement of insurance services for the operations of construction and rehabilitation of CH Laborit

Centre hospitalier laborit | Published April 10, 2017  -  Deadline April 28, 2017
cpvs
66510000

Single-awarded framework agreement of insurance services for the operations of construction and rehabilitation of CH Laborit

Construction work for engineering works except bridges, tunnels, shafts and subways

SRD | Published March 21, 2017  -  Deadline April 24, 2017
cpvs
45222000

renewal work The HTA starting the Evescault - Part 2.

Construction d'un centre médico-psychologique de l'enfant et de l'adolescent

Centre hospitalier laborit | Published March 23, 2017  -  Deadline April 21, 2017
cpvs
45210000

Construction d'un centre médico-psychologique de l'enfant et de l'adolescent

Construction-site supervision services

CHU de Poitiers | Published February 28, 2017  -  Deadline March 31, 2017
cpvs
71521000, 71000000

OPC mission as part of the construction of a medical and surgical building after decommissioning of the existing surgery building. Work will take place in three main phases:

- Phase 0: preparations stage that brings together network diarrhea work, work related to the establishment of early technical installations (heating, PBX), asbestos removal and demolition,

- Phase 1: BMC construction: phase is to build a medical-surgical building of 3 levels,

- Phase 2: Restructuring: Phase 2 which allows sub-phases to restructure the emergency and SMUR, and UHCD and USC service. Living in work: 7711 square meters at the stage APS.

Mission control scheduling and coordination site for the construction of a medical and surgical building on the site of Montmorillon.