Dual carriageway construction work

DREAL ALPC | Published January 11, 2017  -  Deadline February 23, 2017

Construction of additional lanes in TPC, strengthening existing channels and BAU, construction of an underground retention basin and 3 open ponds, restraints including 4000 m of GBA, horizontal and vertical signage including 10 cranes, jib cranes or high -mâts, dynamic equipment, all signs and protection of the site.

The work involves three distinct types of technical services:

- Benefits (A + B + C): earthworks, pavements, drainage, permanent signage and restraints,

- D benefits: dynamic equipment,

- Benefits E: temporary signs and exploitation under construction.

Construction work for highways

DREAL ALPC | Published December 15, 2016  -  Deadline January 31, 2017

RN 10 Landscaping 2 x 2 lanes between Reignac and Chevanceaux - completion of earthworks, engineering structure (PI 1), sanitation and roads - South section.

Realization of earthworks, an OA (Plate 1), sanitation and roads - South section.

The main quantities provided to the market are:

Spoil furniture / rippables = 290 600 m 3 current section and 87,000 m 3 on recoveries / basins.

Embankments SC = 100 000 m 3 .

Embankments embankments = 168 000 m 3 .

lime supply treatment = 5 500 t.

Supply hydraulic binder = 7 200 t.

subgrade materials intake = 10 300 m 3 .

Gutters grass = 5345 m.

Concrete gutters = 3565 m.

Trenches excavated peak slope = 11 000 m 3 .

Gutters slots = 945 m.

Open channel (30 x 30-50 x 50) = 975 m.

Trapezoidal ditch = 5010 m.

Trenches = 6360 m.

Earthmoving OA = 4340 m 3 .

reinforced concrete frames nuance B500 b = 53 400 kg.

Excavations trench wall = 1 550 m 2 .

Slurry wall frames = 89 600 kg.

Concrete diaphragm walls = 900 m 3 .

BBTM = 7 340 t.

BBSG (link or bearing) = 23 880 t.

GB3 (base / foundation) = 63 650 t.

GNT0 / 315 = 34 315 t.

GNT0 / 20 = 26 270 t.

Urban planning and landscape architectural services

EPF de Poitou-Charentes | Published December 14, 2016  -  Deadline January 30, 2017

The Purpose of this market to purchase orders is the realization of intellectual services such preliminary studies / pre-operational and map-guide type of property valuation.

It is renewable twice by tacit agreement.

Each study is broken down into firm phase and conditional phase.

Lot # 1: Feasibility studies on land small / simple

Lot # 2: Rehabilitation Feasibility Studies

Lot # 3: Feasibility studies on land of medium / complex size

Lot # 4: Studies "guide map".

The land concerned may generally be less than 1ha in size, depending on the complexity of constraints.

It can be as rehabilitation of deconstruction / reconstruction partial.

Aspects of urban development and networks will be more sensitive: urban integration, landscaping, routes, possibly public spaces.

This lot covers small areas of up to 20 ha.

  • 1