Wastewater treatment plant construction work

Perpignan Méditerranée Communauté | Published February 15, 2017  -  Deadline March 2, 2017
cpvs
45252127

This design-build contract is for the work to achieve tertiary treatment intended to equip the treatment plant Perpignan. The works constructed and equipment installed will treat pollution:

- Phosphorus,

- And bacterial.

Ultimately, the implementation of this work will limit the qualitative alteration of the river "La Tet" guarantee the quality of bathing water and meet the discharge standards set by regulatory step.

Benefits are broken down into two tranches:

- Firm phase: treatment with phosphorus industry dedicated sludge treatment and technical local hardware store,

- Optional tranche No 1: bacteriological treatment.

Wastewater treatment plant construction work

Perpignan Méditerranée Communauté | Published February 18, 2017  -  Deadline March 13, 2017
cpvs
45252127

This design-build contract is for the work to achieve tertiary treatment intended to equip the treatment plant Perpignan. The works constructed and equipment installed will treat pollution:

- Phosphorus,

- And bacterial.

Ultimately, the implementation of this work will limit the qualitative alteration of the river "La Tet" guarantee the quality of bathing water and meet the discharge standards set by regulatory step.

Benefits are broken down into two tranches:

- Firm phase: treatment with phosphorus industry dedicated sludge treatment and technical local hardware store,

- Optional tranche o 1: bacteriological treatment.

Wastewater treatment plant construction work

Perpignan Méditerranée Communauté | Published February 25, 2017  -  Deadline March 20, 2017
cpvs
45252127

This design-build contract is for the work to achieve tertiary treatment intended to equip the treatment plant Perpignan. The works constructed and equipment installed will treat pollution:

- Phosphorus,

- And bacterial.

Ultimately, the implementation of this work will limit the qualitative alteration of the river "La Tet" guarantee the quality of bathing water and meet the discharge standards set by regulatory step.

Benefits are broken down into two tranches:

- Firm phase: treatment with phosphorus industry dedicated sludge treatment and technical local hardware store,

- Optional tranche 1: bacteriological treatment.

Earthmoving work

Département des Pyrénées-Orientales | Published February 17, 2017  -  Deadline March 28, 2017
cpvs
45112500

RD117 - deviation of Estagel - preparatory work.

This contract is for the completion of the preparatory work, including compensatory cuttings in the bed of the Agly, as part of the construction of the future deviation of Estagel on Rd117.