Call +44 800 9755 164

Public tenders for construction in Paris France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Ville de Paris | Published January 21, 2017  -  Deadline February 14, 2017

Construction of a comprehensive school and a childcare equipment in Chapelle-sector Internationale in Paris 18ème.

Construction work

Ville de Paris | Published January 17, 2017  -  Deadline February 14, 2017

Construction of a comprehensive school and a childcare equipment in Chapelle-sector Internationale in Paris 1 8th .

This project concerns the construction of a complex of about 5200 m 2 floors grouping:

- A creche 99 cradles,

- A comprehensive school: kindergarten and elementary classes of 12,

- In the housing estate in Chapel-International 18 th arrondissement of Paris (75)

- The whole is located on a rectangular plot of 2 900 square meters, situated north of the subdivision. The footprint of the building is about 1700 m 2 .

The project is to make all states of the body, including the facilities of outdoor spaces.

Construction work

France Télévisions | Published January 7, 2017  -  Deadline February 23, 2017

This is the construction of a building of approximately 3000 m 2 floor area of ​​R + 2 to accommodate the new station France 3 Normandie on the quay Ferdinand de Lesseps in Rouen.

Structural work / foundations / earthwork / facades / VRD / metal / coverage beams.

Seal.

External joinery / occultation.

Locksmith.

Elevator.

Flexible floor coverings, floors / tiles / false floor.

Partitions / dubbing / plastering / false ceilings.

Interior woodwork / signage.

Painting / wall coverings.

high and low voltage electricity.

Heating / ventilation / smoke / plumbing / sanitary.

Building construction work

Paris Habitat — OPH | Published December 30, 2016  -  Deadline January 30, 2017

Works:

- New construction of a student residence with 47 rooms,

- Major renovation of an existing building, including:

- A relay house 34 rooms,

- An official residence,

- Common premises,

- Business premises,

- An agency (office)

- Demolition of a building R + 1 + attic.

Building construction work

RIVP Construction | Published December 23, 2016  -  Deadline January 24, 2017

Building design and construction of a wooden Student Residence (R + 6/7), about 100 dwellings (T1 and T1 ') on an existing concrete slab built over the ring road at the Porte de Vanves .

As part of the call for Expression of Interest (Friend) "Real live wood" device designed by Adivbois and launched by the City of Paris, RIVP wants to develop, on the slab built over the ring road at level of Vanves on the corner of Julia Bartet Street and Claude Garamond Street and across from the square Anna Marly, a temporary housing residence wood to a young audience, including students and of around 100 apprentices housing (T1 and T1 ').

This building will rise in R 6 / R 7 + imperative wooden structure.

The plot size is 860 square meters.

Multi-dwelling buildings construction work

Elogie-SIEMP | Published January 11, 2017  -  Deadline February 14, 2017

New construction 10 homes and 2 business premises - 96 rue de Meaux / 3 rue Petit - 75019 Paris.

Gros Work, carpentry, roofing, waterproofing, facades, interior and exterior joinery, bulkheads, locks, hard flooring, resilient flooring, painting, VRD, construction and facilities management account pro rata.

Plumbing / Heating / Ventilation / DHW Solar.

Electricity Strong currents and currents Low.

Elevator.

Building construction work

ICF La Sablière SA HLM | Published December 24, 2016  -  Deadline February 1, 2017

The project is envisioned as a global market performance (design, construction, operation and maintenance), with research of an innovative construction method respecting the lot sheets and allowing:

1. An improved energy consumption through a thoughtful design of the built favoring the installation of easy technical operating systems;

2. Reduced time and site nuisance compared to traditional methods;

3. An architectural style making room for revegetation / vegetation and coming integrate the neighborhood.

performance levels and expected environmental certifications are:

Compliance with RT 2012.

Label Effinergie +

The NF HQE habitat certification to the latest vintage in force.

The plan air Territorial Climate Energy (PCAET) of East Ensemble.

The share of ENR consideration heating and hot water will exceed 30%.

Building construction work

ICF La Sablière SA HLM | Published December 23, 2016  -  Deadline January 25, 2017

The project is envisioned as a global market performance (design, construction, operation and maintenance), with research of an innovative construction method promoting the majority using wood and respecting the lot of the developer sheet .

performance levels and expected environmental certifications are:

- Compliance with the RT 2012 -30%

- The NF HQE habitat certification to the latest vintage in force

- Respect for the climate plan of the city of Paris,

- Compliance with technical and environmental guidelines of the planning area (low carbon objective)

- Labeling ADIV wood.

It is expected an optional slice: Heating operation. This optional tranche will be encrypted phase provides that if the group proposes a gas heating solution.

The project is envisioned as a global market performance (design, construction, operation and maintenance), with research of an innovative construction method promoting the majority using wood and respecting the lot of the developer sheet .

performance levels and expected environmental certifications are:

- Respect for the Rt 2012 -30%

- The NF HQE habitat certification to the latest vintage in force

- Respect for the climate plan of the city of Paris,

- Compliance with technical and environmental guidelines of the planning area (low carbon objective)

- Labeling ADIV wood.

there is provided an optional tranche: Heating operation. This optional tranche will be encrypted phase provides that if the group proposes a gas heating solution.

1600356 | damage-work insurance market and CCRD - Development and construction of the leisure Vaires Torcy Ile (77)

Conseil Régional d'Ile-de-France | Published January 9, 2017  -  Deadline February 15, 2017
damage-work insurance market and CCRD - Development and construction of the leisure Vaires Torcy Ile (77)

Construction work

OSICA | Published January 6, 2017  -  Deadline March 6, 2017

energy rehabilitation of 93 collective housing buildings of 6 (V817).

Macro Lot A: closed and covered (demolition, carcass work, exterior joinery, ITE cleaning, sealing, metalwork).

Macro lot B: finishing work (Common, housing).

Macro Lot C: technical trades (electrical, plumbing, heating, ventilation).

Macro Lot D: outdoor areas (parks and VRD).

Construction work

OSICA | Published January 10, 2017  -  Deadline February 3, 2017

design-build contract to rehabilitate 224 homes, 188 parking spaces, 4 shops, Eugénie Cotton residence in Tremblay-en-France.

Construction work

MJL/SG/2S2M/SDI/SIPJP | Published January 14, 2017  -  Deadline February 28, 2017

This consultation concerns a restricted competition on project management outline for the restructuring of the High Court of Chartres. It includes a basic mission within the meaning of the MOP Act of 12.7.1985 and 29.11.1993 of its implementing decree carries an additional task "Diag."

The work includes the restructuring of services in existing buildings (main building and annex) and the creation of an extension of the schedule bearing surface of about 800 square meters building at 1400 m 2 .

Delivery of the work is desired for the end of the first half 2020.

Construction work

CNAM | Published January 18, 2017  -  Deadline February 13, 2017
The market is broken down into six lots. 

The lot owner will be responsible for installation, rent and removal of the base life, setting common places skips all items, installation of site influence in the farmyard (Ground -Garden).

The owner of the lot will be responsible for all the work of interior joinery: doors, baseboards, corner guards, movable.

Ventilation work is to be performed for the air extraction blind premises.

The work covered by this lot are essentially the site installation, removal and disposal of electric fluids of the existing plate, installation of a new cabinet, the complete renovation of the electrical system of the area, the lighting circuits and outlets, creating a set of security lighting.

The work is described in the CCTP.

It should allow to connect each workstation to the various telephone and computer systems (minimum application class E).

Construction work

Ville de Paris | Published January 18, 2017  -  Deadline February 28, 2017

Work for the restoration of facades and woodwork of the Town Hall of the X - 72 rue du Faubourg Saint-Martin - lot 1 Masonry, stone, cleaning, scaffolding lot 2 sculpture lot 3 Marble, gilding lot 4 roofing slates, zinc and lead lot 5 Joinery and locksmith occultation lot 6, lot 7 ironwork Stained glass, painted glass lot 8 Painting.

Masonry, stone, cleaning, scaffolding.

Sculpture.

Marble, gilding.

Slate roof, zinc and lead.

Joinery and occultation.

Locksmiths, ironwork.

Stained glass, painted glass.

Painting.

2016V72024390 | Regroup training services and logistics Brigade Fire Brigade of Paris - Construction of the building restoration - 35 Avenue Guy Moquet? 94450 LIMEIL-BREVANNES

Ville de Paris / Mairie de Paris | Published January 9, 2017  -  Deadline February 23, 2017
Regroup training services and logistics Brigade Fire Brigade of Paris - Construction of the building restoration - 35 Avenue Guy Moquet? 94450 LIMEIL-BREVANNES

Architectural, construction, engineering and inspection services

Aéroports de Paris | Published January 5, 2017  -  Deadline January 23, 2017

Technical assistance during the construction phase as part of the reception building by the Property Directorate (see II.2.4 below).

The purpose of this framework agreement is the accompaniment of management of real estate of Aéroports de Paris in its role of assistance to project owners (AMOA), mainly in the following tasks:

- Preliminary Visits to the receipt by the owner

- Pre receipt and acceptance of the work by the owner

- Establishment of reserves and monitoring of lifting of reservations

- Perfect completion guarantees Tracking

The services focus on:

- All types of structures where IMO comes from office buildings, industrial facilities, warehouses, ...

- New construction or rehabilitation.

Architectural, construction, engineering and inspection services

Ville de Paris | Published January 5, 2017  -  Deadline February 7, 2017

development work for the implementation of CAD services and CCA at 11 rue du Pre, Paris 18 th .

The operation involves the construction of the building 11 rue du Pre (Paris 18 th ) To install the services of management of cultural affairs and management of heritage and architecture.

It affects around 13 000 m 2 of surface. Work will be performed free of occupation site for the building B, and Site partially occupied in Building C. In addition, the site will manage the operation of outdoor spaces in relation to already established services.

The timing of the operation and thus the work is very constrained.

Part of the work finishing work will be performed in-house.

It is planned reuse of materials in the site.

Roundabout construction work

Société concessionnaire française pour la construction et l'exploitation du tunnel routier sous le Mont Blanc (ATMB) | Published December 14, 2016  -  Deadline January 26, 2017

This contract is for the completion of redevelopment connecting hubs "A40 / RD 2 straps" and "RD 2 / RD 1206" at the right of the diffuser Annemasse (exit 14) in the municipality of 'Étrembières.

This contract relates to redevelopment work of connecting junctions of DR 2 and DR 1206 Étrembières.

Building construction work

RIVP Construction | Published December 20, 2016  -  Deadline February 14, 2017

This contract aims to achieve the City of Paris climate plan rehabilitation of a housing complex of 243 homes and 90 commercial premises located 1-7 Rue Charlemagne, 1 and 5 rue Ave Maria, 10-26 rue des Jardins Saint -Paul and 5-27 rue Saint-Paul in Paris 4th said the St. Paul Village.

This contract aims the climate plan rehabilitation work Ville de Paris of a housing complex of 243 homes and 90 commercial premises of the St. Paul Village (Paris 4).

The company's attention is specifically drawn to the fact that all the units are occupied by tenants, that all business premises are in operation during that serve as access to housing and shops, that whole village should not be simultaneously starts but be divided into 3 or 4 phases. The company's offer is deemed to incorporate all the provisions, constraints, and costs arising from this state of tenure, shops and business courses.

Court building construction work

APIJ | Published January 4, 2017  -  Deadline February 6, 2017

slices contract awarded pursuant to Article 77 of the Decree of 03/25/2016 on public procurement.

The market is not alloti, it is divided into a firm phase and an optional slice.

The project led by the Ministry aims at TGI courts of consolidation, IT, CT and CPH currently dispersed to the creation of the new court of Lisieux.

For this, it was decided to convert the old factory Wonder, now abandoned, which is a remarkable building of industrial architecture of the late 19 th century (building R + 2 with a mezzanine floor, no basement).

The work includes the complete rehabilitation of the building, a floor partial demolition and asbestos removal work / lead removal and remediation.

The project areas are:

- Land easement: 4260 square meters,

- Surface in work: 3988 square meters,

- Usable area: 2191 square meters.