Call +44 800 9755 164

Public tenders for construction in Pantin France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work for school buildings

Région Île-de-France | Published December 15, 2016  -  Deadline January 23, 2017

works contract in 5 lots for the construction of a boarding school of 100 seats Marcelin Berthelot in Pantin (93500).

-charpente Structural work, wood facade, cleaning, waterproofing, roofing, exterior joinery - -occultations sunscreens, partition-lining, interior woodwork - movable equipment, suspended ceilings, floor tiles, tiles, lining soft floors, painting, signage, métallerie- locksmith-fences.

Fluids: plumbing, sanitary, heating-ventilation.

Electricity - fire safety.

Elevators.

Vrd - green areas: external-Vrd improvements, green spaces.

Insurance services

Région Île-de-France | Published January 11, 2017  -  Deadline February 15, 2017

This consultation is to subscribe to an insurance damage-work and collective contract of decennial liability for risks related to work on the development operation and construction of the Island leisure Vaires - Torcy, Vaires-sur-Marne (77), an estimated amount of € 54,305,740 excluding VAT, or 65,166,888 euros TTC.

This contract underwriting object of a construction insurance policy to ensure the development operation and Leisure Island construction Vaires - Torcy, Vaires-sur-Marne (77) to cover:

- The decennial nature of disorders in accordance with Article L. 242-1 of the Insurance Code and the provisions of Articles R. 243-1 and following of the Insurance Code relating to the collective contract of decennial liability (CCRD) .

- The following additional benefits:

- Proper functioning warranty for equipment separable elements,

- Consequential damage to a guaranteed property damage,

- Damage to existing: not applicable.

Architectural services for buildings

Région Île-de-France | Published December 21, 2016  -  Deadline January 24, 2017

The operation includes (the mentioned surfaces are Sho):

- Demolitions for 5988 square meters including the demolition of the building plan (600 square meters), demolition A (4888 square meters), demolition of staff houses scattered on the website (C and D buildings for 500 square meters) l

- The creation of a home court, and the creation of new buildings for about 8598 square meters, including 7,773 square meters dedicated to high school and 825 square meters dedicated to the construction of 7 staff houses;

- Complete restructuring of the "square" building to an area of ​​about 1546 square meters;

- Renovation of the building housing the B workshops (3808 square meters);

- The implementation of demountable buildings during the construction and the creation of an athletics track.

the operation will be conducted by an environmental quality approach without certification.

part of the projected budget allocated to the work: EUR 25.3 million excl.

  • 1