Call +44 800 9755 164

Public tenders for construction in Montpellier France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work for school buildings

Ville de Montpellier | Published January 12, 2017  -  Deadline February 20, 2017

The purpose of this contract is the construction of a school group. It is a formalized procedure subject to the provisions of 25.i articles 66 to 68 of Decree 2016-360 of 25/03/2016. The works comprise a firm phase and two optional phases (for lots 13 and 14) and are divided into 15 lots with separate award. The market has for lot 1 of execution conditions of a social nature whose detail is shown in the SCC.

For information, the Lot "Excavation - support" relative to this market has already been the subject of a tendering procedure which the notice of public solicitation was posted on 04/11/2016 and the OJEU BOAMP.

structural work. This lot includes performance clauses social nature whose detail is shown in the SCC. Compliance with these provisions is a condition of conformity of the offer.

Waterproofing and photovoltaic.

Exterior joinery work.

dubbing work, partitions, false ceilings.

flooring works and walls.

Construction of interior woodwork.

Locksmiths.

Painting and complete clean finish.

Façade work.

Installation work of lifts - maintenance.

Electrical work.

of boiler installation, ventilation, plumbing and sanitary.

road works and various networks.

Work for green areas.

structural work and covering the exterior walkway.

Construction insurance market casualty book 'for the construction of the regional delegation Languedoc-Roussillon in Montpellier CNFPT.

Cnfpt represente par la soderec | Published December 19, 2016  -  Deadline January 27, 2017
Construction insurance market book damage 'as part of the construction of the Regional Delegation of Languedoc-Roussillon in Montpellier CNFPT.

works contracts for the construction of the ARCAD project and integrative equipment. A firm contract, the construction of a housing complex grouping including tertiary spaces,

Inra de montpellier | Published January 20, 2017  -  Deadline March 31, 2017
works contracts for the construction of the ARCAD project and integrative equipment. A firm contract, the construction of a housing complex grouping including tertiary spaces, laboratories and logistics spaces, automated storage equipment. In optional tranche, the construction of a local workshop and a storage room for lots No. 12 (elevators), A (Laboratory Equipment) and B (Stacker crane), this consultation is a procedure adapted in accordance with Article 22 of Decree no2016-360.Pour information, batches from January to November are the subject of a formal procedure>, subject to 42-1o articles no2015-899 order of 07.23.2015 and 25 65 to 68 of no2016-360 Decree of 25.03.2016 relating to public procurement (reference PLACE: INRA-C24-2017-002) .For lot 12, lot A and lot B, the work of master reserves the right to negotiate with the three (3) candidates whose bids have been classified as the most economically advantageous based on the criteria set out in Article 3.2. Bidders imperatively specify in their bid the person's name and email address to contact for negotiation.

SPS Mission Coordinator for the realization of improvements instead Laissac and construction of the new Hall, located in the southern district Patch Laissac station in Montpellier (34).

S.a.3.m. | Published January 11, 2017  -  Deadline February 1, 2017
Mission coordinator for safety and health protection for the realization of improvements instead Laissac and construction of the new Hall

Waste-treatment plant construction work

SAAM | Published December 23, 2016  -  Deadline January 31, 2017

overall performance of public contract covering the design and realization of the sorting process and the operation and maintenance of the selective collection sorting center for dry recyclable household waste Demeter in Montpellier.

See section VI.3) Additional information, below.

6D00508191 | Construction of the school group Malbosc - Cross Lavit

Ville de Montpellier | Published January 10, 2017  -  Deadline February 20, 2017

Creating a pumping station wastewater perversion of conduct had cast gravity of 300 mm diameter and construction of a parking area

Montpellier mediterranee metropole | Published January 10, 2017  -  Deadline February 10, 2017
Creating a sewage pumping station, dévoiemen a pipe EU gravity cast iron 300mm diameter and construction of a stationnement- Plot area AZ01596 CFAI- Town Baillargues

4704EA16 | creating a pumping station wastewater dévoiemen a pipe EU gravity cast iron 300mm diameter and construction of a parcel stationnement- area Az01596 common CFAI- Baillargues.

Montpellier Méditerranée Métropole | Published January 10, 2017  -  Deadline February 10, 2017
Creating a pumping station wastewater dévoiemen a pipe EU gravity cast iron 300mm diameter and construction of a parcel stationnement- area Az01596 common CFAI- Baillargues.

4634EP16 | construction of a footpath to the boxing gym John Farre

Montpellier Méditerranée Métropole | Published January 6, 2017  -  Deadline February 3, 2017

Architectural and related services

ACM OPH de la CA de Montpellier | Published December 31, 2016  -  Deadline February 2, 2017

Restricted competition of project management on study under no2015-899 order of 07.23.2015, the Decree 2016-360 of 03/25/2016 and pursuant to Article 88 of Decree 2016-360 of 25/03/2016.

The mission entrusted to the winner of the competition will be a core mission Exe + + Opc for the construction of 36 collective housing about R + 2 and attic.

The operation will be located on lots 59 (area 1802 M2) and 60 (area 1492 M2) the allotment gardens of helios in Cournonterral. The floor area of ​​2700 square meters.

The projected budget affected by the Client for the building is 2.65 million euros HT. The operation is financed through loans Plus / Plai and subsidies.

Site-development work

Société d'équipement de la région montpelliéraine (SERM) | Published January 17, 2017  -  Deadline February 20, 2017

Framework Agreement for subsequent contracts for construction works (terrassement- roads, wet systems, dry networks, landscaping) Unit 3 of the BIA Cantaussel in Saint-Bres (34).

The works are divided into 4 lots. Subsequent markets will be cut into a firm phase and two optional phases defined as:

Firm phase: implementation of road networks and Unit 3 to serve the various lots (individual plots and macro lots).

optional tranche 1: treatment of earthmoving leveled. Only concerns Lot No 1. This optional section is to provide a treatment at the leveled earth after backfilling platforms. It will be triggered if the lift is less than 20 MPa.

Optional Unit 2: development of two parcels named on the macro level lots 6 and 7. Concerns lots 1 to 4. The provisional date for start of works is May, 2017.

Preparations and earthworks, adjustment and compaction form of funds; realization of all views surfaces: roads, parking lots, sidewalks, squares, bike path; realization of boundary walls in breeze blocks and rigid lattice, street furniture and vertical and horizontal signaling.

Networks of rain water, waste water, drinking water (civil engineering, supply and installation of pipes, manholes, connections to existing networks, testing, water works in retention basins).

telecom network and lighting (civil engineering, and massive candelabra); realization of networks and HV and low voltage connections, including civil engineering, sheaths, cabinets; gas network (civil engineering, installation and welding / connecting pipes (supply provided by GRDF)).

irrigation network (earthworks, supply and installation of pipelines and all equipment needed for operation, control and regulation); plantations; completion and reinforcement.

  • 1