Call +44 800 9755 164

Public tenders for construction in Mont-de-marsan France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionFrancemont-de-marsan

Construction of 13 housing 'pyramides2' in mimizan

O.p.d.h.l.m. des landes | Published April 6, 2017  -  Deadline April 27, 2017
cpvs

Construction of 13 housing 'pyramides2' in mimizan

Construction of 2 housing 'bourg' and 5 housing 'center bourg' in haut mauco

O.p.d.h.l.m. des landes | Published April 20, 2017  -  Deadline May 11, 2017
cpvs

Construction of 2 dwellings 'Bourg' and 5 housing units 'Center Bourg' in HAUT MAUCO

Project management contract for the construction of a library

Commune de saint cyr au mont d'or | Published April 14, 2017  -  Deadline May 12, 2017
cpvs

Project management contract for the construction of a library

16-AOR-SEM-AEB 069 | THE RHEU-35-COLLEGE THEODORE MONOD - OP 15I29F -Construction of a scientific bâitment - Mission project management

Région Bretagne | Published April 10, 2017  -  Deadline June 10, 2017
cpvs

THE RHEU-35-COLLEGE THEODORE MONOD - OP 15I29F - Construction of scientific bâitment - Mission project management

Construction work

Sorgem (Société d'économie mixte) | Published March 31, 2017  -  Deadline April 28, 2017
cpvs
45000000

This consultation relates to the execution of works for the realization of the City Val Verde, hurepoix the avenue in the town of Plessis-Pâté (91200), in the ZAC Val Verde - White Cross. This public facility is a 5 storey building 3200 square meters approximately SDP, with a partial basement, ERP ranked 1st category. It will be implemented on a plot of 11,648 square meters, which will be landscaped. In a first phase the landscaping field should take into account a temporary shunt whose influence is on the ground plate. The second phase will include the removal of the shunt and the development work planned by the contractor. The Val Verde City must be done in n hqetm certification process and Effinergie + certification.

Construction work

SPLA Maraïna | Published April 15, 2017  -  Deadline May 15, 2017
cpvs
45000000, 45453100

This contract is for the repair work of the chimney of the old distillery Isautier within the rehabilitation of regional radiation conservatory works in Saint-Pierre.

Construction work

Valophis Habitat Office Pub. Habitat Va. | Published April 15, 2017  -  Deadline May 15, 2017
cpvs
45000000, 71000000

Design and production in the thermal rehabilitation project site occupied with restructuring and extension of a residence for the elderly.

Construction work

CEA — Centre de Cadarache | Published April 22, 2017  -  Deadline May 22, 2017
cpvs
45000000, 45111000, 45112500

This contract concerns the work of VRDs necessary for the establishment of dry networks at the controlled access zone of the CEA / Cadarache center within the framework of the Pcmnit project (strengthening the protection of civil installations housing Nuclear materials, their installation and Of their Transport).

Work will include:

- the demolition of existing abandoned concrete structures located in the project's right-of-way,

- earthworks in trenches in grounds of any kind,

- the planing of old bituminous coatings,

- the taking back of the underground form funds if necessary, including the necessary purges,

- the realization of embankments for advancement,

- the realization of dry networks (CFO, CFA),

- the resumption of wet networks, rainwater collectors impacted by the works,

- the realization of the drawing rooms, manholes and masks,

- the penetration of dry networks into existing structures,

- the recovery of the rolling layers,

- the setting of all the glances and gutters located in the right-of-way of the works,

- the execution of civil works of punctual reinforcement.

Primary school construction work

Ville de Saint-Maur-des-Fossés | Published March 31, 2017  -  Deadline May 3, 2017
cpvs
45214210

Rehabilitation works and accessibility at nursery and elementary schools The Pie and East Park. Open call for tenders awarded under sections 25-i °, 33, 36, 38 44, 67 to 68 of Decree No 2016-360 of 25.3.2016 relating to public procurement.

Global price contract and lump divided into 2 lots:

Lot 1: Kindergarten and elementary magpie.

Lot 2: Kindergarten and Elementary School Park East.

A candidate may not hold more batches. Detailed technical specifications of work are contained in CCTP of lots 1 and 2.

rehabilitation and accessibility at work Lot 1: kindergarten and elementary magpie. The work of the technical specifications are described in the CCTP the lot.

rehabilitation and accessibility at work Lot 2: kindergarten and elementary Is Park. The work of the technical specifications are described in the CCTP the lot.

Primary school construction work

Ville de Saint-Maur-des-Fossés | Published April 21, 2017  -  Deadline May 10, 2017
cpvs
45214210

Rehabilitation and accessibility works for kindergartens and elementary schools La Pie and Parc-Est. Open invitation to tender pursuant to Articles 25-i °, 33, 36, 38 to 44, 67 to 68 of Decree No 2016-360 of 25.3.2016 on public procurement. Market at a global price and divided into 2 lots: Lot 1: Kindergarten and elementary school. Lot 2: kindergarten and elementary park-east. A candidate may not hold several lots. The detailed technical specifications of the works are included in the CCTP of lots 1 and 2.

Construction work for school buildings

Commune de Saint-Pierre | Published March 31, 2017  -  Deadline May 12, 2017
cpvs
45214200, 45112500, 45111291, 39221000, 45112712

The work involves the reconstruction of a nursery school in 11 classes, including all ancillary necessary for proper operation.

The lot of work No. 1 includes the demolition of existing structures and surface treatment systems; implantation of the works to be executed; general earthworks; excavations for networks (eu ep, AEP, ft, Cf / Cf, Edf); the EU network; EP network; AEP and Fire networks; civil engineering FT network; surface treatment works; retaining walls; fences and green spaces.

The lot of work No. 2 include the shell; sealing; timber framing - metal frame; coverage; hard coating; drywall - false ceiling - acoustic correction; the exterior and interior joinery; movable; metalwork - locksmith; the painting; soft floors; Electricity - Telephone - TV and plumbing Sanitaire - VMC - ECS.

The work of lot No. 3 include the provision, installation and connection waiting on fluids of all new equipment restoration including isothermal boundaries, the refrigeration production; removal of existing materials in local work, transport and storage on a secure site; the installation and connection of waiting fluids existing equipment dismantled and reused in the current kitchen, including transport from the storage site.

The Lot No. 4 works include picketing and implementation; earthworks jobs and land facilities before planting; the supply and implementation of earth mixture; the supply and planting of the plants, including staking and planting accessories; the supply and implementation of mulching canvas; achieving engazonnements; the realization of a network of drip irrigation on beds planted; the supply and installation of furniture for garden workshop ...

Construction project management services

Commune de Saint-Pierre | Published March 31, 2017  -  Deadline May 10, 2017
cpvs
71541000

This is to appoint a proxy (referred to within the meaning of Law No. 85-704 of 07.12.1985) to provide the specialized assistance missions administrative, legal and technical concerning the operation indicated for the account of power contracting (the client).

Foul-water piping construction work

CEA — centre de Cadarache | Published March 31, 2017  -  Deadline May 15, 2017
cpvs
45232411

trenchless rehabilitation diagnosis and separation of sewerage CEA / Cadarache

This work will be Order of services (OS) successive; according to the needs expressed by the CEA.

Each quotation will be valued on the basis of rates and prices per unit price schedule (BPU).

Quantity works.

Architectural, construction, engineering and inspection services

Commune de Pont de Claix | Published April 22, 2017  -  Deadline May 22, 2017
cpvs
71000000

Project management: refurbishment of public spaces in the Îles de Mars district.

Redevelopment of public spaces.

Special trade construction works other than roof works

Ville de Salon-de-Provence | Published April 11, 2017  -  Deadline May 9, 2017
cpvs
45262000

This framework agreement concerns the maintenance work, maintenance and rehabilitation of municipal buildings. The work will cover all premises belonging to the heritage of the town or the CCAS. Moreover, local which can be purchased or leased by the city or the CCAS during the validity period of the framework agreement will be included in this Framework Agreement. The work, subject of the framework agreement will be executed either under maintenance of premises, or in connection with various transactions renovations or development, maintenance and major repairs, and intervention of emergency. The precise nature and location of work will be designated in the subsequent contracts or purchase orders. This consultation concerns only lot 12 "difficult access work (rope access)" filed away at a previous consultation.

difficult access work (rope access).

Architectural, engineering and planning services

Commune de Saint-Jean-de-Moirans | Published April 11, 2017  -  Deadline May 9, 2017
cpvs
71240000

The town of Saint-Jean-De-Moirans has decided to proceed with the demolition and reconstruction of House website for All and Leisure Center Without Accommodation. The projected area of ​​the new equipment is about 750 square meters SU. The building will be built in the village.

Reinforcement works of the cliff of the drilling of the ghouls to the pebbles - territory of the country salonais

Metropole d aix marseille provence | Published April 18, 2017
cpvs

Construction of the cliffs of the Goules drilling in Pélissanne - Territoire du Pays Salonais

This consultation relates to designation of a task manager for the realization of a pedestrian walkway crossing the tracks between the ZAC de Bois Milon and g

Mairie de saint andre de cubzac | Published April 12, 2017  -  Deadline May 9, 2017
cpvs
71000000

This consultation will be the appointment of a master work for the construction of a pedestrian footbridge crossing the railway tracks between the ZAC Bois Milon and the station of Saint André de Cubzac.
  • 1