Call +44 800 9755 164

Public tenders for construction in Limoges France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction of ehpad Marcel faure - contôle Office.

Ccas de limoges | Published January 9, 2017  -  Deadline January 30, 2017
Construction of the EHPAD Marcel Faure - Office control unit.

Construction of ehpad Marcel faure - scheduling, management and coordination of the site.

Ccas de limoges | Published January 9, 2017  -  Deadline January 31, 2017
Construction of the EHPAD Marcel Faure - scheduling, management and coordination of the site.

Architectural, construction, engineering and inspection services

Limoges Habitat | Published January 12, 2017  -  Deadline February 17, 2017

The operation involves the construction in two phases, multiple housing defined as follows:

Phase 1: Construction of 35 collective housing + 1 commercial ((The work of this website will include a cleanup component / deconstruction of existing buildings)..

Phase 2: Construction of 11 collective housing.

The consultation is subject to a discount of architectural intent to enable a full understanding of each project team and a comparison of their respective strengths and weaknesses.

On the basis of the project owner program, the prime contractor for Contractor will ensure the following mission elements according to the MOP law (Law No 85-704 of 07/12/1985):

- Total core mission with EXE;

- Complementary mission: Scheduling steering coordination "UCI".

The project management team will integrate into its core mission the recognition of the certification process "habitat nf hqe" issued by CERQUAL.

estimated overall amount of work: € 4,635,000 HT distributed as follows:

Phase 1: € 3.73 million excluding VAT.

Phase 2: 905 000 EUR excluding VAT.

Duration of walking.

Phases 1 and 2: Studies 8 months including annual leave.

Works phase 1: 20 months including two months of site preparation and annual leave.

Phase 2 work: 16 months including two months of site preparation and annual leave.

Track construction works

Communauté d'agglomération Limoges Métropole | Published December 10, 2016  -  Deadline January 30, 2017

Following recent erase networks work, sanitation and drinking water made on the influence of the streets within the subdivision "Buis" on the village of Couzeix, it is essential today to restructure the floor, and the resumption of sidewalks and curbs. The affected streets are: rue du Buis, the Mas of age, of Biards, Aurence and Moulin Rabaud.

Restructuring of the road and resumption of sidewalks and curbs.

Track construction works

Communauté d'agglomération Limoges Métropole | Published December 14, 2016  -  Deadline January 23, 2017

Securing pedestrians and road trips to better identify the urban center of Boisseuil. Reducing vehicle speeds, up to accessibility standards PRM (Persons with Reduced Mobility) buses and sidewalks docks, upgrading of existing space and integration of alternative modes of travel.

- General repaving.

- Creation of an against-way.

- Repair of sidewalks.

- Supply and laying of concrete and granite curbs.

- Creation of stormwater networks.

Creating retention of wastewater.

project management assignment for the construction of 12 adapted housing for Travellers in Couzeix 87270

Limoges habitat | Published December 16, 2016  -  Deadline January 25, 2017
oeuvreLieu said prime mission ANGLARD - 87270 COUZEIXConstruction 12 adapted housing for Travellers

construction works for the implementation of Assured Career Home to the headquarters of the CPAM

Cpam de la haute-vienne | Published January 13, 2017  -  Deadline February 6, 2017
construction works for the implementation of Assured Career Home to the headquarters of the CPAM
  • 1