Call +44 800 9755 164

Public tenders for construction in Lille France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Partenord Habitat | Published January 6, 2017  -  Deadline February 8, 2017

works contract in design / development for the construction of 292 housing units in 5 buildings with 120 student apartments, 1 Service residence 34 senior housing, 45 PLS housing, 55 units in accession, 38 housing PLUS / PLAI seniors, 1 business space on the ground floor of one of the buildings, various roadworks networks and facilities necessary for the project located in Villeneuve d'Ascq - rue Baudouin IX and place Léon Blum - Wood Bridge neighborhood .

This involves the construction of 292 dwellings in 5 buildings including:

- 120 housing students and 30 parking spaces,

- 34 senior housing in residential service (catering, laundry, etc.), and 15 parking spaces,

- PLS housing 45, and 45 parking spaces,

- 55 housing Accession, and 55 parking spaces,

- 38 PLUS housing / PLAI seniors, and 38 parking spaces,

- 1 surface activity on the ground floor of one of the buildings and 3 parking spaces,

- Various road works networks and facilities necessary for the project as well as the internal roads of routes.

The total floor area is created in the order of 15 300 m 2 .

The buildings will be constructed on two separate land holdings totaling approximately 8600 m 2 and with high altitude.

The date of provisional start of studies is September 2017.

Construction work for water projects

Métropole européenne de Lille | Published December 10, 2016  -  Deadline February 2, 2017

The public market is to work as part of the Melbourne operation in Tourcoing. The works include the construction of a storage basin, rehabilitation of sports city, various networks and roads. As part of its fight against floods, the European metropolis of Lille decided to create a storage pool of 25 000 m 3 Tourcoing to preserve the Sentier district, the Port of Boulogne, of Snowflake, frequently flooded during major rain events.

Construction of a storage tank and return of 25 000 m 3 Melbourne buried under the sports complex, the implementation of a framework collector street Espierre and Marseille dock basin for the supply, construction of a technical building emerge within a fenced area of ​​operation the implementation of water related works.

Reconstruction of sports field with a synthetic coating, construction of a new locker room, carrying landscaping and fencing.

Laying of sewerage connections and recovery, the diverting dealer networks, renewal of the adductor drinking water dock in Marseille, the abuse of the digital network European city of Lille and the road layout of the street Espierre in zone 30.

Construction work for water projects

Métropole européenne de Lille | Published December 16, 2016  -  Deadline February 2, 2017

The public market is to work as part of the Melbourne operation in Tourcoing. The works include the construction of a storage basin, rehabilitation of sports city, various networks and roads. As part of its fight against floods, the European Lille Métropole decided to create a storage pool from 25 000 m3 in Tourcoing to preserve the Sentier district, the Port of Boulogne, of Snowflake, frequently flooded during major rain events.

Architectural, construction, engineering and inspection services

Partenord Habitat | Published January 11, 2017  -  Deadline February 10, 2017

mastery of market lumber for the construction of 47 multi-family rental, including the achievement of VRD (internal service and construction parking lots) and construction of 18 garages in Armentières rue Marcel Wramour. This contract is concluded pursuant to Ordinance No. 2015-0899 of 23/07/2015 and Decree No. 2016-0360 of 03/25/2016 on public procurement.

The mission entrusted will be a core mission "building works" as defined by the MOP law of 12/07/1985 and its implementing regulations, and for "infrastructure works" in accordance with Annex 3 of the decree of 21.12.1993. The operation has the following mission elements: "Studies of sketches", "preliminary studies", "pre-project studies", "Building permit or statement of work", "project studies", "Assistance awarding works contracts "," compliance Review and visa execution studies "," Directorate of works contracts "," Assistance during receive operations "," File of executed works " "Assistance for the perfect completion period" completed the mission Scheduling Management and Coordination (Opc).

Road construction works

Soreli | Published December 24, 2016

Work for the development of public spaces on the perimeter of Phase 1 - West End - operation Fives Cail Babcock Lille Fives

The works include the construction of approximately 2.9 hectares of public spaces including roads and utilities operations (about 900 ml of roads), landscaped areas of development (approximately 2700 m 2 massive, 120 trees), paving realization (about 5650 m 2 ), Supply and installation of street furniture (including about 930 ml low smooth, support 65 bicycle units, 12 baskets, 42 grates of trees, 210 posts, etc.), children's playground, lighting (130 luminaires) and signaling, development of traffic lights, construction of linear gardens including the supply and installation of automatic sprinklers and and metal goulettes (about 230 ml), earthworks and disposal inert and non-inert rubble, site preparation.

Work on about 1.7 hectares of public spaces: - earthworks (cut and fill) - realization of sanitation and connections - achieving basins with storage control - realization of pavement to the road surface there including the borduration - achieving sheaths floor crossing (water, gas, electricity, and Orange Network Cable, lighting) - completion of the withdrawal sanitation - realization sidewalks, and pedestrian access including borduration - including achievement of parking borduration - realization of the wearing course on roads and parking lots - making final level of ancillary works (sanitation and key mouths) - realization of signaling.

Work on about 1.2 hectares of public spaces: - earthworks (cut and fill) - realization of sanitation and connections - achieving basins with storage control - realization pavement until ROULEME layer. ..

Road construction works

Soreli | Published January 10, 2017  -  Deadline February 15, 2017

Work for the development of public spaces on the perimeter of Phase 1 - West area - operation Fives Cail Babcock Lille Fives

The works include the construction of approximately 2.9 hectares of public spaces including roads and utilities operations (about 900 ml of roads), development of landscaped areas (approximately 2700 m2 of massive, 120 trees), paving realization (about 5650 m2), supply and installation of street furniture (including about 930 ml low smooth, support 65 bicycle units, 12 baskets, 42 grates of trees, 210 posts, etc.), children's playground, lighting (about 130 luminaires) and signaling, development of traffic lights, construction of linear gardens including the supply and installation of automatic sprinklers and and metal goulettes (230 ml), earthworks and disposal of inert and non-inert rubble, site preparation.

Work on about 1.7 hectares of public spaces: earthworks (cut and fill) - realization of sanitation and connections - achieving basins with storage control - realization of pavement to the road surface including the borduration - achieving sheaths floor crossing (water, gas, electricity, and Orange Network Cable, lighting) - completion of the withdrawal sanitation - realization sidewalks, and pedestrian access including borduration - achievement of parking including borduration - realization of the wearing course on roads and parking lots - making final level of ancillary works (sanitation and key mouths) - realization of signaling.

Work on about 1.2 hectares of public spaces: earthworks (cut and fill) - realization of sanitation and connections - achieving basins with storage control - realization of pavement to the road surface including the borduration - achieving ...

works contract in states of separate bodies for the construction of 29 rental housing in small individual drill Avenue of Correzzola

Partenord habitat | Published January 19, 2017  -  Deadline February 20, 2017
works contract in states of separate bodies for the construction of 29 rental housing to individual SMALL FOREST, Avenue of Correzzola

works contract and vrd in states of separate bodies for the construction of 13 houses and garages 6, rue de neuville to tilloy-les-cambrai

Partenord habitat | Published January 4, 2017  -  Deadline February 7, 2017
works contract and VRD in states of separate bodies for the construction of 13 houses and garages 6, rue de Neuville TILLOY-LES-CAMBRAI

Architectural, construction, engineering and inspection services

Partenord Habitat | Published January 17, 2017  -  Deadline February 16, 2017

Framework Agreement to purchase project owner assistance services to control on the implementation of audit missions, preparation of work programs, improvement of procurement and related services policy for collective installations of production of heating and hot water and assessment missions, monitoring, analysis, optimization and capitalizing on energy efficiency and user comfort due to investment operations Partenord Habitat.

This is project owner assistance benefits on the implementation of audit missions, preparation of work programs, improvement of procurement and related services policy for collective facilities production of heating and hot water Partenord Habitat.

This is project owner assistance benefits for assessment missions, monitoring, analysis, optimization and capitalizing on energy efficiency and user comfort due to investment operations Partenord Habitat.

Architectural, construction, engineering and inspection services

Partenord Habitat | Published January 18, 2017  -  Deadline February 20, 2017

Project management - rehabilitation of 76 individual housing - Stassin street - Brel - Brassens in Courchelettes. This contract is concluded pursuant to no2015-0899 order of 23 July 2015 and no2016-0360 Decree of 25 March 2016 on public procurement.

The market is unique and focuses on missions elements necessary for the execution of works under the MOP law of 12 July 1985 and its implementing decrees, completed missions "Technical diagnostics", "Diagnosis of Energy" and "Scheduling Control and Coordination (Opc). "

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Dreal5962 SG | Published January 17, 2017  -  Deadline February 24, 2017

RN17 - up to 2x2 lanes between Arras and Lens - section Vimy Avion: Earthworks, sewerage, roads, bridges, safety equipment The market will include a firm phase and 6 tranche (s) option (s); Nature and scope of work: All slices include the work described, the linear sanitation, supply and installation of safety equipment and the horizontal and vertical signs and reinstatements of routes crossed, if any. For work located in urban area, the work also includes the supply and installation of noise barriers.

RN17 - up to 2x2 lanes between Arras and Lens - section Vimy Avion: Earthworks, sewerage, roads, bridges, safety equipment.

Restructuring work

Conseil départemental du Nord | Published January 13, 2017  -  Deadline February 21, 2017

The CD of the central services are spread over Lille in 3 sectors and 12 buildings. The Department owns the building "Forum" is considering the consolidation of its headquarters on the site through a major renovation and expansion. (Rest of the description in the presentation of the operation downloadable on the websites: - http://www.lenord.fr / topic Procurement - https://marchespublics.lenord.fr/)

The holder of the partnership contract, the supplier of the County Council of the North, will be entrusted with a global mission on:

- Heavy restructuring of the Forum building about 22 000m 2

- The construction and development of an extension of about 8000m 2

- Temporary and permanent transfer of central services on site

- Renovation of the reception of the hotel's Department

- Redevelopment Site goshawks urban spaces

- The construction of one hundred parking spaces in the basement

- Maintenance, maintenance and heavy maintenance-renewal of the whole work

- The funding of all works and services entrusted to it under the contract

- The construction of a third building within the project boundary

- Benefits in connection with the management and economics of the project.

2016.066 | agricultural vocational school Haute Somme Peronne structural diagnosis of the main building

Conseil Régional Nord Pas De Calais Picardie | Published January 4, 2017  -  Deadline January 27, 2017
agricultural vocational school Haute Somme Peronne structural diagnosis of the main building

Lille - Hellemmes - Flanders Square - Restoring the concrete structures, metalwork, VRD and retaining wall

Metropole europeenne de lille | Published January 12, 2017  -  Deadline February 20, 2017
Lille - Hellemmes - Flanders Square - Restoring the concrete structures, metalwork, VRD and retaining wall
  • 1