Call +44 800 9755 164

Public tenders for construction in La-valette-du-var France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionFrancela-valette-du-var

RD559 - PR 13 + 620-13 + 680 - Sanary sur Mer - Work of Master on the construction of a retaining wall following a slip

Conseil general du var | Published January 10, 2017  -  Deadline January 31, 2017
RD559 - PR 13 + 620-13 + 680 - Sanary sur Mer - Work of Master on the construction of a retaining wall following a slip

Construction of a multipurpose center breast

Ville de mandelieu la napoule | Published December 16, 2016  -  Deadline January 30, 2017
Construction of a multipurpose center breast

Retirement home construction work

CH de l'arrondissement de Montreuil | Published December 23, 2016  -  Deadline January 27, 2017

This consultation follows the infructuosité declaration of a first procedure dated 08.11.2016 and bearing reference No. 16-161688 .She concerning the appointment of the company that will be responsible for the construction of a nursing home 84 beds, psychiatric services and consulting premises in Etaples for the hospital of the district of Montreuil (CHAM).

For timing reasons which compliance is mandatory, the operation will include a single batch consisting of 24 state bodies. The contract will be awarded as a general contractor.

According to Article 38 of the Order of 23/07/2015, the performance of the contract will include an integration initiative by compulsory economic activity.

DCE is downloadable on Klekoon platform under the reference K3088773.

Construction of a nursing home 84 beds, psychiatric services and consulting premises in Etaples for the Hospital of the district of Montreuil (CHAM). For time reasons which compliance is mandatory, the contract will be awarded to a general contractor.

Motorway construction works

Escota | Published January 18, 2017  -  Deadline February 24, 2017

The contract is for the detailed design of PRO level, and monitor the realization of the work and the performance of works last 2 times 3 lanes of the A57 between Benoit Malon and Pierre Ronde.

Work will be performed under traffic in dense urban development sector and in limited land holdings.

The single market, inclusive, will comprise the following services:

The detailed design includes the production of the PRO level study materials, monitoring the performance of work.

The execution of the work includes the completion of engineering designs, scheduling, coordination and control of companies working.

Attendance at the reception of the work, including monitoring the quality control of work performed and take stock of the completed works.

The expansion work will include, indicatively: the rights of way clearance, earthworks, drainage and sewerage, Demolition built, demolition / construction or enlargement of structures, structures for protection and water treatment , roads, communication recoveries, acoustic shields, interim and final safety equipment, operating equipment related to the highway, horizontal and vertical signage, landscaping

Significant amounts indicated: demolition of built: 15 u, cuttings 100 000 m³, embankment 130 000 m³, retaining walls: 4000 m², demolition and reconstruction of structures (overpasses and underpasses) 3 u, expansion or construction of structures (overpasses and underpasses): 5 u, footbridges built: 3 u, slot gutters: 17 000 ml concrete collectors: 5 500 ml asphalt: 120 000 t, concrete restraints: 27 000 ml, gantries, cranes and high-mast: 40 u-tube concrete: 20 000 ml, control and containment basins: 12 u, acoustic shields: 25 000 m².

The exhaustive detail the tasks and work to be performed will be specified in the specifications.

Master contractor for the construction of a sports complex in aspremont

Sivom val de banquiere | Published December 21, 2016  -  Deadline January 27, 2017
Master contractor for the construction of a sports complex in Aspremont

Construction work for college buildings

CCI du Var | Published December 21, 2016  -  Deadline February 13, 2017

setting out of water and out of air works, finishing works and additional facilities under construction on the site Chalucet by the CCI of Var of a building of 5200 m2 of floor area for notament international business school Kedge Business school and of economic activities trays. Lot "Gros Oeuvre - Earth - Metal framing" of the project to build the area of ​​creativity and knowledge (site of the former hospital Chalucet) is the subject of a specific consultation group control and is closely nested with the object of this consultation process.

Cover - etanchéité - metal siding.

Outside joinery - occultations.

Metalwork Locksmith.

Hvac - plumbing - sanitary.

Cfo - CFA - electricity.

elevators - monte loads.

Interior woodwork.

Partitions - -Processing Acoustic ceilings.

Flooring and walls.

Painting - cleaning.

movable walls.

damage insurance services work and all risks relating to the construction of a ehpad, psychiatric services and consulting to local etaples.

Ch de l' arrondissement de montreuil | Published January 3, 2017  -  Deadline February 17, 2017
Insurance services Damage and Work Site All Risks relating to the construction of a nursing home, psychiatric services and consulting to local ETAPLES.L'établissement is predictive kind of U 4th catégorie.L'estimation the book is of 16,194,180 euro TTC including 1,940,580 euro TTC prime oeuvre.La projected construction time fee is 21 mois.La consultation comprises 2 lots: Lot 1: Damage insurance Contract work; Lot 2: insurance contract all risk chantierLe DCE can be downloaded from the platform KLEKOON under reference K3091294

17DTP040 | Construction of the inter-arts education school Plateau Caillou

Territoire de la Côte Ouest | Published January 16, 2017  -  Deadline February 16, 2017
Construction of the inter-school art education Plateau Caillou Recovery unsuccessful lots: - Lot 6: aluminum joinery - Lot 12: Signage and revival of 9: Plumbing / Ventilation / Air Conditioning / ECS following the declaration without result

Road construction works

Conseil général de Charente-Maritime | Published January 10, 2017  -  Deadline February 13, 2017

Creation of a roundabout and a soft path.

Construction work for highways, roads

Conseil général de Charente-Maritime | Published January 7, 2017  -  Deadline February 13, 2017

Earthworks, stormwater drainage, pavement and sidewalks.

Pumping station construction work

Vendée Eau | Published January 10, 2017  -  Deadline February 6, 2017

Sector Rochereau - alteration of the pressure & Amp pumping station; Quot; Les Roches & Amp; Quot; in the municipality of Boupere & Amp; Quot;

Sector Rochereau - alteration of the booster pump station "Les Roches" Boupère on the Common.

The works mainly comprise:

- The establishment of a pumping capacity of 100 m3 / h 170 m HMT, allowing the supply of the sheet of the Monnerie;

- The renewal of equipment in place for the supply of Puy Lambert tank, according to the following operation planned:

- Pumping mode with target of 110 m3 / h to 160 m hmt;

- Pressure / distribution mode with target of 110 m3 / h to 189 m HMT.

The upstream connection will be done on the existing pipeline DN 250 mm from the tank Jonchère, the throughput capacity will increase from 100 to 210 m3 / h.

Pumping station construction work

Vendée Eau | Published January 17, 2017  -  Deadline February 6, 2017

Sector Rochereau - alteration of the booster pump station "Les Roches" in the town of Boupère.

Construction d'un court de tennis

Commune de sarlat-la caneda | Published January 9, 2017  -  Deadline January 31, 2017
Numéro de la consultation : 2017TENNISTR Construction d'un court de tennis

release benefits and rights of way management (picketing, deforestation, clearing, fencing) preparatory to the intervention of preventive archeology to the Lyon-Turin rail

Tunnel euralpin lyon turin sas | Published January 6, 2017  -  Deadline January 26, 2017
release benefits and rights of way management (picketing, deforestation, clearing, fencing) preparatory to the intervention of preventive archeology to the construction of the Lyon-Turin rail link

Small road construction and urban development

C.a. sud sainte baume | Published December 30, 2016  -  Deadline January 30, 2017
Small road construction and urban development in the Community passed in the form of a framework agreement without reopening competition later resulting in the purchase order issuance. This contract is for a period of four years and amounts on the total duration, are: Minimum: 200 000,00 euros HT - Maximum: 1 000 000,00 EUR HT.

Landfill Construction of electrical networks, electronic communications and public lighting

Ville de la queue-en-brie | Published January 2, 2017  -  Deadline January 31, 2017
Landfill Construction of electrical networks, electronic communications and public lighting

Structural shell work

EHPAD de Rivet | Published January 20, 2017  -  Deadline March 1, 2017

Travaux de construction d'un EHPAD de 102 lits à Malemort-sur-Corrèze (site annexe de l'EHPAD de Rivet à Brive). Clause obligatoire sociale d'insertion et de promotion de l'emploi en application des dispositions de l'article 38 de l'ordonnance nº 2015-899 du 23.7.2015 relative aux marchés publics. Cette clause est applicable aux lots:

— lot nº 6: étanchéité

— lot nº 11: plâtrerie, isolation, peinture.

Étanchéité.

Plâtrerie-isolation-peintures.

Revêtements de sols résine.

Nettoyage.

Architectural and related services

Ville de La Possession | Published December 31, 2016  -  Deadline February 3, 2017

Estimated project area: 1879 square meters of floor area on a free plot of about 3300 square meters.

Local elementary, home entertainment center / after school, local and school catering equipment, administrative offices.

Common and technical premises.

outdoor spaces, including a sports field and parking.

Tasks entrusted to the contractor: ESQ, APS, APD, PRO, ACT, VISA, DET, AOR.

complementary missions: ISS mission OPC assistance mission to project ownership to the choice of first equipment (furniture), study missions in operations and maintenance. Mission environmental quality of the building included in basic mission.

The operation is part of an ongoing national Ecoquartier labeling. construction project subject to the regulation of Plu, and will be compatible with the planning and programming guidance. Respect repository specific building sustainability in the ZAC.

Transport and construction of chemical analyzes, bacteriological samples from: river water, marine or brackish, and urban sewage discharge on the department of Vendée.

D d t m de la vendee | Published January 4, 2017  -  Deadline January 31, 2017
Transportation and conducting chemical analyzes, bacteriological samples from: river water, marine or brackish water, urban waste water and sewage in the department of Vendée

Roadworks

Conseil général de Charente-Maritime | Published December 8, 2016  -  Deadline January 23, 2017

The work involves the realization of earthwork, pavement reconstruction, rainwater drainage and construction of sidewalks.

The work involves the earthworks, reconstruction of pavement, rainwater drainage and construction of sidewalks.