Call +44 800 9755 164

Public tenders for construction in La-rochelle France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction of a tower indoor ice - production - storage - distribution

Syndicat mixte port de peche | Published November 22, 2016  -  Deadline December 23, 2016

SUPPLY OF BUILDING MATERIALS

Ville de la rochelle | Published November 28, 2016  -  Deadline December 30, 2016

Roadworks

Conseil général de Charente-Maritime | Published December 8, 2016  -  Deadline January 23, 2017

The work involves the realization of earthwork, pavement reconstruction, rainwater drainage and construction of sidewalks.

The work involves the earthworks, reconstruction of pavement, rainwater drainage and construction of sidewalks.

SIMPLIFIED VISITS AND DETAILED STRUCTURES OF THE TOWN OF LA ROCHELLE

Ville de la rochelle | Published November 18, 2016  -  Deadline December 14, 2016

District-heating mains construction work

Communauté d'agglomération Tour(S)Plus | Published November 19, 2016  -  Deadline December 19, 2016

Design, construction, financing and operation of a public service heat distribution (supplying users with heating and hot water) as part of a public service delegation contract by grant (Art. L.1411 -1 & Amp;. s CGCL, Ordinance No. 2016-65 of 29/01/2016 and Decree No. 2016-86 of 01/02/2016 relating to concession contracts).

Main tasks entrusted to delegate: Design, construction and financing of the work of the first establishment of the heating network (construction of the boiler system, silos, boilers, substations ...) / Operation and driving service / maintenance, maintenance, replacement of facilities and equipment / purchase of fuel / Billing charges to subscribers.

predictive characteristics of the heating network build: central heat production from 17.5 to 25 MW via one or more wood boilers from 5.5 to 7 MW, one or more gas boilers and provision of approximately 20 MW boilers existing gas / network length estimated between 10 and 12 km / 60% coverage rate minimum wood / 35-45 potential substations (bidders have the right to propose other users) / annual needs estimated at between 52 000 and 62 000 MWh / purchased power estimated between 30 and 35 mw / envisaged annual operating.

Drinking-water treatment plant construction work

Communauté d'agglomération du Bassin de Brive | Published November 26, 2016  -  Deadline January 6, 2017

competitive procedure with negotiation: Articles 25-II.3, 71-73 and 91 of the Decree of 03/25/2016 on public procurement.

Design and production for the partial or total reconstruction of the plant for producing drinking water from Saint-Germain in Brive.

Design and production for the restructuring of the plant producing drinking water of Saint-Germain in Brive, namely:

- Construction of a drinking water production chain from raw water from the source of the Adoux (90 to 150 m 3 / H - Saint-Cernin-de-Larche) and water retention dam Couze (360 m 3 / H - Sainte-Féréole)

- Construction of a pre-processing unit of the sludge produced by the plant,

- Rehabilitation or reconstruction of the recovery station of the Pigeonnie,

- Any additional services (imposed variant): rehabilitation of water storage tanks treated in Saint-Germain (2 x 3500 m 3 ).

Candidates will be selected will have a premium of 15 000 EUR HT insofar as they present a benefit in conformity with the consultation. The candidate will be awarded the same amount as advance market intervention.

Construction materials and associated items

Conseil général d'Indre-et-Loire | Published November 9, 2016  -  Deadline December 15, 2016
This consultation concerns the supply and transport of cationic emulsion of pure bitumen and modified, fast-breaking designed for surface coatings made by the operational division of the County Council of Indre-et-Loire.

Building construction work

Ville de La Roche-sur-Yon | Published December 7, 2016  -  Deadline January 3, 2017

The building is to build a building in ground floor with 2 floors designed in a rational and functional way to the school complex could accommodate 11 classes. The school complex is 2548 square meters of floor space and 662 square meters of traffic (20.6%), a total of about 3210 square meters. Outdoor spaces include a kindergarten yard 634 square meters with a covered area of ​​77 square meters.

Bored piles: 159 U For more information refer to MCPCC batch.

Concrete walls cast on site: 3050 square meters.

For more details refer to the CCTP batch.

Supply of construction materials

Ville de brive-la-gaillarde | Published November 15, 2016  -  Deadline December 8, 2016

Building construction work

EHPAD Le Grand Cèdre | Published November 2, 2016  -  Deadline December 21, 2016
Painting.

Construction work for school buildings

Conseil général de la Vendée | Published December 6, 2016  -  Deadline January 13, 2017

The work is to achieve an occupied site and are decomposed into a firm phase and an optional slice except for Lots 4, 15 and 16 which do not include optional tranche.

Local Home Construction lifts

Satelc | Published November 10, 2016  -  Deadline December 12, 2016

Construction work for electricity power lines

SDES 73 | Published November 11, 2016  -  Deadline December 9, 2016

The purpose of this open call for tenders for the conclusion of a multi-awarded framework agreement to work on public electricity distribution networks, public lighting and telecommunications to achieve on behalf of the SDES. Associated Subsequent contracts will be awarded on the basis of this framework agreement.

As an indication, the number of subsequent contracts to run on the entire territory of the SDES, is annually between 30 and 60 for a total amount of 3 million EUR HT and HT EUR 6 million.

Construction of 19 collective housing and shops in the corner of René Achille Boiseuf and Nozière at Pointe-à-Pitre

Scp pointoise d'hlm de la guadeloupe | Published November 7, 2016  -  Deadline December 7, 2016
Undefined, Building 19 collective dwellings and shops in the corner of René Achille Boiseuf and Nozière at Pointe-à-Pitre

Construction, foundation and surface works for highways, roads

Epamsa | Published November 2, 2016  -  Deadline December 1, 2016
Green spaces.

Construction of a school and extracurricular St Christophe du Ligneron.

St christophe du ligneron | Published November 29, 2016  -  Deadline December 22, 2016

Architectural and related services

Commune de La Clusaz | Published November 22, 2016  -  Deadline December 28, 2016

This consultation is to select a project management team for the construction of an early childhood center, to give it a market subsequently negotiated project management without publicity or competition (in under Article 30-I-6 of Decree No 2016-360 of 25.3.2016 relating to public procurement).

The project provides:

- The construction of a service road and parking with minute drops,

- The construction of a building 670 square meters, of 1 level comprising:

A nursery of 27 children and a tourist day nursery of 24 children.

- The development of outdoor for the 2 structures.

Rendering projects submitted by the candidates admitted to the competition level is a sketch + (Esq +).

  • 1