Footbridge construction work

Conseil général de l'Ariège | Published April 30, 2016
cpvs

bridges construction work Pedestrian

Construction, foundation and surface works for highways, roads

Conseil général de l'Ariège | Published April 26, 2016
cpvs

construction, foundation and surface works for highways, roads

Road construction works

Conseil général de l'Ariège | Published November 18, 2015  -  Deadline December 28, 2015
cpvs
45233120

Travaux de construction de routes

Construction of 15 social housing units in Foix. LOT 5: plastering - DUBBING - WALLS

Opac de l'ariege | Published July 7, 2016  -  Deadline July 25, 2016
cpvs

Construction of 15 social housing units in Foix - LOT 5: plastering - WALLS - DUBBING

Construction of a place of life for a therapeutic educational and pedagogical institute in Foix

epms la vergniere | Published July 3, 2015  -  Deadline July 29, 2015
cpvs
45000000

construction of a place of life for a therapeutic educational and pedagogical institute Lot 1: Structural work Structural work Masonry paving plasters

Engineering works and construction works

Conseil général de l'Ariège | Published November 19, 2015
Winner
groupement solidaire NGE Génie Civil / Guintoli / Agilis
cpvs
45220000

Rd 117 - deviation Prat-Bonrepaux - construction of acoustic shields - Common Prat-Bonrepaux.

Engineering works and construction works

Conseil général de l'Ariège | Published June 24, 2015  -  Deadline July 29, 2015
cpvs
45220000

Construction of three sections of acoutiques screens, located along the deviation of the RD 117 in the village of Prat-Bonrepaux and installing screens to bat on Lower Passage of works of Gouarège and Passage Lower the Hage. Cuttings of all kinds 2900 1710 m3 m3 backfill for embankments barricade 1700 m3 concrete C30 / 37 325 m3 smooth frames and high adhesion to concrete 50000 kg expanded gba 145 m concrete girders in U reflective screen 142 Acoustic panels 1320 m2 absorbent acoustic panels 440 190 m2 m2 screens bats metal posts 240 U Anti-graffiti Treatment 2200 m2 the candidate is deemed to have visited the site of works before the delivery of the offer. Execution time: 4 months from the start of service order. 30-day preparation period from the notification of the contract, plus the lead time. Expected date of commencement of works: 10.1.2015.

Road construction works

Conseil général de l'Ariège | Published March 16, 2016
Winner
Groupement solidaire COLAS Sud Ouest (mandataire)/Aximum (co-traitant)
cpvs
45233120

RD 117 - deviation Prat-Bonrepaux - realization of pavements - Common Prat-Bonrepaux.

Building construction work

Conseil général de l'Ariège | Published July 28, 2015
Winner
CBB digital (1er titulaire)
cpvs
45210000

Framework Agreement on the implementation of electrical work / ssi - the department of Ariege.

Overpass construction work

Conseil général de l'Ariège | Published February 13, 2015
Winner
Groupement d'entreprises Malet (mandataire) / Cazal
cpvs
45233144

RD 117 - deviation Prat-Bonrepaux earthworks of the current section - Common Prat-Bonrepaux.

Construction of a 22-place guesthouse in Foix Resumption of Lot 15 élevateur device

opac de l'ariege | Published December 19, 2014  -  Deadline January 12, 2015
cpvs

construction of a 22-place guesthouse - lot No. 15 market recovery device élevateur

Construction work for communication lines

Conseil général de l'Ariège | Published November 10, 2017  -  Deadline December 11, 2017
cpvs
45231600, 32420000, 32424000, 32427000

Mono-awarded framework agreement with purchase orders.

- minimum annual amount: 2 000 000 EUR including tax,

- maximum annual amount: 20 000 000 EUR all taxes included.

The WFD provides for the implementation of the social inclusion clause, pursuant to Article 38 of Ordinance No. 2015-899 of 23.7.2015 on public procurement.

The implementation will include a social integration action to promote the employment of people with particular difficulties of integration and fight against unemployment. The candidate undertakes to reserve in the execution of the framework agreement, the labor time specified in Annex 2 of the EA "Action d'insertion professionnelle" (cf.Article 3- 2-2 of the SCC).

The candidate is deemed to have taken knowledge of the sites concerned by the project and all the constraints and constraints related to its environment, including the access routes and the nature of the work sites.

Estimated date of commencement of works: 1.2.2018.

Mono-awarded framework agreement with purchase orders.

- minimum annual amount: 2 000 000 EUR including tax,

- maximum annual amount: 20 000 000 EUR all taxes included.

The WFD provides for the implementation of the social inclusion clause, pursuant to Article 38 of Ordinance No. 2015-899 of 23.7.2015 on public procurement.

The implementation will include a social integration action to promote the employment of people with particular difficulties of integration and fight against unemployment. The candidate undertakes to reserve in the execution of the framework agreement the labor time specified in Annex 2 of the EA "Action for professional integration" (see Article 3- 2-2 of the SCC).

The candidate is deemed to have taken knowledge of the sites concerned by the project and all the constraints and constraints related to its environment, including the access routes and the nature of the work sites.

Estimated date of commencement of works: 1.2.2018.

Footbridge construction work

Conseil général de l'Ariège | Published December 23, 2015  -  Deadline January 29, 2016
cpvs
45221113

Open tender. Expected date of commencement of work: 1.4.2016. Lead time: four months from the start of service order. 30-day preparation period from the notification of the contract, plus the lead time.

RD 12 Construction of a bus stop and a Common carpool area of ​​Arvigna

Conseil general de l'ariege | Published June 6, 2016  -  Deadline June 20, 2016
cpvs
45233140

RD 12 Construction of a bus stop and a carpool lot - Town of Arvigna

Establishment of offices and construction of a dining hall on the site of Bellissen in FOIX

Conseil general de l'ariege | Published June 13, 2016  -  Deadline June 28, 2016
cpvs
45454000

Establishment of offices and construction of a dining hall on the site of Bellissen in FOIX

Construction work

OPAC de l'Ariège | Published July 21, 2015  -  Deadline September 9, 2015
cpvs
45262660

Framework Agreement - Maintenance and Big investment works for the entire portfolio of public office of the habitat of Ariege spent living the procedure of the call for tender opened under Articles 11, 28 32 and 42 of Decree No. 2005-1742 of the modified order of 6.6.2005.

Construction of a reception area in the high valley of Aston - Sites Rieutort and pla Las Peyres

Conseil general de l'ariege | Published March 13, 2017  -  Deadline April 3, 2017
cpvs
45112500

Construction of a reception area in the high valley of Aston - Sites Rieutort and pla Las Peyres

Bridge renewal construction work

Conseil general de l'Ariege | Published November 23, 2017  -  Deadline December 22, 2017
cpvs
45221119, 45262522, 45262620

Indicative annual amount: 1 150 000 euro (s) (including tax).

The works concerned are bridges, retaining walls and aqueducts.

The framework agreement will be awarded to 6 companies that will be selected on the basis of their offer for a qualifying transaction.

The candidate will complete the Pbu, Dqe related to the project of operation attached to the Dce.

When awarding each of the subsequent contracts, the 6 incumbent companies will be consulted.

Each subsequent contract determines its own turnaround time.

The conclusion of the subsequent contracts awarded on the basis of the framework agreement can only be done during the period of validity of the framework agreement.

Estimated start date of the tx (launch of the 1st consultations on subsequent contracts): April 2018.

In all cases, the candidate will be deemed to have visited the site before submitting his proposal.

Indicative annual amount: 1 150 000 euro (s) (including tax).

The works concerned are bridges, retaining walls and aqueducts.

The framework agreement will be awarded to 6 companies that will be selected on the basis of their offer for a qualifying transaction.

The candidate will complete the Pbu, Dqe related to the project of operation attached to the Dce.

When awarding each of the subsequent contracts, the 6 incumbent companies will be consulted.

Each subsequent contract determines its own turnaround time.

The conclusion of the subsequent contracts awarded on the basis of the framework agreement can only be done during the period of validity of the framework agreement.

Estimated start date of the tx (launch of the 1st consultations on subsequent contracts): April 2018.

In all cases, the candidate will be deemed to have visited the site before submitting his proposal.

Mission Project management assistance for the design and construction of the museum and the scenography of the Foix Castle Site

Conseil general de l'ariege | Published July 12, 2016  -  Deadline August 12, 2016
cpvs

Mission Project management assistance for the design and construction of the museum and the scenography of the Foix Castle Site

Road construction works

Conseil général de l'Ariège | Published November 11, 2015  -  Deadline December 18, 2015
cpvs
45233120

Expected date of commencement of work: 2.5.2016. Lead time: 5 months after the start-service order. 30-day preparation period from the notification of the contract, plus the lead time.