Call +44 800 9755 164

Public tenders for construction in Dunkerque France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Road construction works

Communauté urbaine de Dunkerque | Published January 31, 2017  -  Deadline March 7, 2017
cpvs
45233120

1st road program 2017 - pavement improvement works and sidewalks in the territory of the Urban Community of Dunkirk (framework agreement for purchase orders).

The benefits result in a framework agreement running at progressively by the issuance of purchase orders under sections 78 and 80 of Decree No 2016-360 of 03/25/2016, the amounts are excluding taxes following: minimum 1 666 666.67 EUR and maximum € 5,000,000.

Construction work for electricity power lines

Communauté urbaine de Dunkerque | Published January 25, 2017  -  Deadline March 2, 2017
cpvs
45231400, 45232310

1 2017 program erasure work LV electrical and telephone networks in the territory of the Urban Community of Dunkirk (framework agreement for purchase orders).

The benefits result in a framework agreement running at progressively by issuing purchase orders under sections 78 and 80 of Decree No 2016-360 of 25.3.2016 the annual amounts are excluding taxes the following: minimum and maximum 333 333.33 EUR 1 666 666.67 euros.

Consultative engineering and construction services

Grand port maritime de Dunkerque | Published January 28, 2017  -  Deadline February 27, 2017
cpvs
71310000

The tasks of project management to achieve in the market focus on the restoration of a set of seven bridges on the Canal Outlet and Diversion Canal in Dunkirk: Carnot Bridge, Old Bridge Rosendaël des Bains Bridge Bridge Emery, Bridge St. Charles Bridge and Bridge Gutenberg Jean Jaurès. They include one firm phase and 7 optional phases defined in the WFD.

General contractors for rehabilitation of seven bridges Schedule service to Grand seaport of Dunkirk.

Consultative engineering and construction services

Le groupement de commandes constitué entre le service annexe au grand port maritime de Dunkerque et la Communauté urbaine de Dunkerque représenté par son coordonateur : service annexe au grand port maritime de Dunkerque | Published February 2, 2017  -  Deadline February 27, 2017
cpvs
71310000

The tasks of project management to achieve in the market focus on the restoration of a set of seven bridges on the Canal Outlet and Diversion Canal in Dunkirk: Carnot Bridge, Old Bridge Rosendaël des Bains Bridge Bridge Emery, Bridge St. Charles Bridge and Bridge Gutenberg Jean Jaurès. They include one firm phase and 7 optional phases defined in the WFD.

Construction work for multi-dwelling buildings and individual houses

Communauté urbaine de Dunkerque | Published November 15, 2016  -  Deadline March 13, 2017
cpvs
45211000

Realization of a collective housing program and activities instead of Leffrinckoucke Train Station and the neighborhood of the Green Tent of Dunkirk.

To allow the completion of a housing operation and activities, CUD, owner of the land, wants to make a sale with charges after a consultation with terms outlined in the specifications available download.

1 lot is offered for sale with loads firm phase. These are plots AK 246, AK 245, AK 916, AK 243, AB 949, AB 942 and AB 995. The entire parcels will not be offered to the sale because their area straddles the boundary between future projects and public spaces made by the CUD in support of the project. Applicants should refer to comic-way into the specifications.

The aim is to achieve the creation of a joint program of 25 to 40 multiple units with a minimum of 40% of social housing on the site. The ground floor will be dedicated to both business premises and parking.

1 lot is offered for sale with loads conditional phase. This is the plot AK 247. It will also be dedicated to the realization of a collective housing program and host on the ground floor of the premises and / or parking spaces.

Marine construction works

Grand port maritime de Dunkerque | Published February 10, 2017  -  Deadline March 1, 2017
cpvs
45244000, 34516000, 45442120

Alterations and creation of a dock face on Flanders dock.

Firm phase (TF) on defenses on the existing dock and the extension of 350 m.

optional section on defenses on the extension of 150 m.

The work of the firm section will be conducted in four phases.

The work of the optional tranche will be held in a single phase.

The operation will be maintained throughout the duration of the work will have to adapt to the call of the vessels. A historical stops in 2016 will be provided to companies that can assess the risk of downtime or shift their work at the No. 1 and No. 2 phases (preparatory work and equipment on the existing wharf) of the TF.

Close consultation with the terminal operator will be essential for a proper work. The company will demonstrate the flexibility to adapt to tides, climatic vagaries and uncertainties regarding ships stop schedules.

Sewerage work

Grand port maritime de Dunkerque | Published February 24, 2017  -  Deadline March 24, 2017
cpvs
45232410, 45112500, 45315300, 45454100, 45232454

Port of Dunkerque - Clean renovation and medians of Grande-Synthe dock.

Roads and utilities.

Construction of a buffer tank and settling rainwater.

Excavating and earthmoving work

Grand port maritime de Dunkerque | Published February 18, 2017  -  Deadline March 6, 2017
cpvs
45112000, 45112500, 45233120

Framework agreement for the construction of port roads.

Cut and fill-carriage with all types of materials (sand, severe untreated, marine sediments, ungraded)

Subgrade and foundation with the serious slag or according to the asphalt binder processing techniques.

surfacing with asphalt, the road percolated asphalt or concrete.

Planing pavement with all types of material.

Series stormwater ditches, pipe network in PVC or concrete watertight basins and infiltration basins.

Stormwater treatment with hydrocarbon separators or lamellar decanters.

various networks by setting up all kinds of sleeves and drawing rooms.

horizontal and vertical signs when the amount of such benefits does not exceed 5% of the amount of other work.

Otherwise a specific consultation would be launched, small amounts of material to demolish and evacuate (concrete blocks, masonry walls tires, scrap metal, ...).

  • 1