Call +44 800 9755 164

Public tenders for construction in Bordeaux France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Aquitanis | Published November 17, 2016  -  Deadline December 23, 2016

101 housing construction and industrial premises - block B 1.1 Ginko in Bordeaux.

This consultation is open to business in separate trades (10 lots).

Variables offers are accepted.

Special foundation / structural work.

Sealing / frame coverage / exterior joinery occultations / siding / locksmith.

Plastering / walls / ceilings.

interior wood joinery.

Coating floors / tiles.

Painting.

CVPS.

Electricity.

Elevators.

VRD / concrete terrace soils R + 2 / green areas watering furniture.

Construction work

Région Nouvelle-Aquitaine | Published November 22, 2016  -  Deadline December 21, 2016

Markets divided into 18 lots.

Setting up scaffolding.

Asbestos removal in accordance with the regulations.

various demolition.

Earthworks, frame and reinforced concrete, masonry.

carpentry work.

various sealing work.

Insulation work facades from the outside.

aluminum and steel joinery.

Various plastering and false ceilings.

Joinery wood fire doors.

various works of locksmithing.

Linoleum / tile.

various works of wall covering.

low current strong current.

various plumbing work - Health - Heating - ventilation.

various equipment of science rooms.

various external works and green areas.

Modular buildings during the construction phase.

Footbridge construction work

DREAL ALPC | Published November 11, 2016  -  Deadline January 5, 2017

The work involves three distinct types of technical benefits: benefits A: civil engineering; Benefit B: earthworks and VRD; Benefit C: metal frame.

CAUDERANRELANCEMR | CONSTRUCTION OF LIBRARY IN BORDEAUX CAUDERAN

Mairie de Bordeaux | Published November 10, 2016  -  Deadline December 5, 2016
Bordeaux city wants to build a library in the district of Caudéran. It is located in the neighborhood of the current Stehelin place Eugène Gauthier. It takes place in the heart of the island Stehelin, vast urban space. following a first consultation LOTS 4 5 or 6 declared without following are restarted

Assistance to the project owner for two construction projects

Centre hospitalier charles perrens | Published November 25, 2016  -  Deadline December 15, 2016

MAPA Construction work for a Home Health Multidisciplinary in Aunac-sur-Charente (16)

Cc du pays manslois | Published November 22, 2016  -  Deadline December 19, 2016

RD8 - Municipalities Toulenne and Langon - Construction of a roundabout with DR 8e1 - PR 2 + 245

Departement de la gironde | Published November 18, 2016  -  Deadline December 9, 2016

Fire-prevention services

Rectorat de Bordeaux | Published November 22, 2016  -  Deadline December 19, 2016

This contract relates to a fire safety mission and continuously persons with assistance 24 hours / 24 hours and 7 days / 7 days of the Tour de Sèze Paul Victor, located at 3 Front terrace of the Medoc in Bordeaux, 1 IGHW classified under articles R.122-2 and R.122-5 of the Code of Construction and housing and governed by the decree of 30.12.2011 regarding security regulations for the construction of high rise buildings and protection against fire and emergency risks amended by the decree of 24/10/2016. The description of the main services and their technical specifications are shown in the CCTP market (Article 2).

PALMER-cv | Urban Renewal District Palmer / Saraillère / May 8, 1945 in Cenon - Framework Agreement urban development project architect and coordinator Mission

BORDEAUX METROPOLE | Published November 15, 2016  -  Deadline December 19, 2016
Urban Renewal District Palmer / Saraillère / May 8, 1945 in Cenon - framework agreement for developing the urban project coordinator and architect mission. This is a single-attribute framework agreement for orders of 4 years to entrust a project team an accompanying mission EPCI including: -Phase 1 development of the urban project -Phase 2: Ensuring the compatibility of construction / rehabilitation programs with urban and architectural objectives -Phase 3: provision of advice, education or public presentations. The minimum amount of the framework agreement is 112 500 euros HT and its maximum amount is 450 000 euros.

Urban planning and landscape architectural services

Bordeaux Métropole | Published November 18, 2016  -  Deadline December 19, 2016

This framework agreement is launched by the open tender procedure governed by Articles 67 to 68 of Decree 2016-360 of 03/25/2016 on public procurement.

This consultation will be passed pursuant to Articles 78 to 80 of Decree 2016-360 of 25/03/2016 on Public Procurement, concerning framework agreements. This is a single-attribute framework agreement to purchase orders of a 4-year term. The minimum amount of the framework agreement is 112 500 euros ht and the maximum amount is 450 000 euro (VAT).

A company may be a member of several groups as co-contractor.

This is a single-attribute framework agreement for orders of 4 years to entrust a project team an accompanying mission including EPCI: -Phase 1 development of the urban project -Phase 2:

Guarantee the compatibility of construction / rehabilitation programs with urban and architectural objectives -Phase 3: provision of advice, education or public presentations.

16GYMBAF | A GYM BASIN FLOOD - CONTROL WORK ON COMPETITION OUTLINE

Mairie de Bordeaux | Published November 18, 2016  -  Deadline January 5, 2017
The City of Bordeaux wants to build a nearby sports equipment including: - A multi-sport gymnasium with an area of ​​44X24X9 games, bleachers, 6 cloakrooms / collective showers, 2 referees changing rooms, a living area of ​​staff and a convivial space; - A sports hall (500 m2) for practicing judo, gymnastics with 4 changing rooms / showers and a fitness training room; - Additional premises: technical rooms, storage space, public toilets. The share of the financial envelope for the work by the master of the book is set at 3 296 400,00 Euros VAT (value in July 2016). The designation of teams admitted to the competition is scheduled for March 2017. The submission of contest projects would be in July 2017. From the announcement of the winner of the contest project management, construction of gymnasium Pools will fit in Flot in an estimated overall period of studies, monitoring and completion of work estimated at 32 months (not including any offset linked to a preventive excavation site).

GSBAF1-cv | SCHOOL BASIN A FLOT No.1 - C11 ISLAND - WITHIN THE PROGRAM PLANNING A FLOOD BASIN - project management competition on Sketch

BORDEAUX METROPOLE | Published November 3, 2016  -  Deadline December 5, 2016
SCHOOL BASIN A FLOT No.1 - C11 ISLAND - WITHIN THE PROGRAM PLANNING A FLOOD BASIN - Project management This consultation includes specific conditions of social-execution details of which will be indicated in the specifications of Contract particular phase of consultation package offer. Urban Community of Bordeaux wants to build a school, consisting of one kindergarten in 6 classes, elementary 1 of 8 classes of common premises (Pole restaurants, leisure centers, multivalent rooms, equipment rooms ...) outdoor spaces (playgrounds, playgrounds, parking ..), 1 housing for an agent. The financial framework for the work by the project management of 6945 000,00 Euros VAT (value in October 2016). This market comprises two tranches (TF: GS Construction, TO1: environmental remediation demolition, adaptation). The implementation period from the date of notification and ends with the expiry of the GPA work. For information, building delivery is scheduled for September 2020. The market consists of the following basic elements: ESQ, APS, APD, PRO, ACT, VISA, DET, AOR and the following additional tasks: SSI QCES, STD OPC

works contract for the structural consolidation of the workshops at the Lycée Saint Exupéry in Parentis (40)

Region alpc | Published November 29, 2016  -  Deadline January 3, 2017

Telecommunications network

Syndicat mixte Gironde Numérique | Published November 19, 2016  -  Deadline March 3, 2017

The Delegation envisaged public service take the form of a works concession and public service for the design, construction, financing and operation of electronic communications infrastructure on the territory of the Gironde, in coherence with other networks of public initiative in the territory or the neighboring departments. It also includes the recovery in farming and the evolution of RIP 1 G.

Design, construction, financing and operation of electronic communications infrastructure on the territory of the Gironde in coherence with existing RIP and recovery in farming and evolution RIP 1G. The delegate will be responsible for operating the service operating at its peril. The network will be made available to operators and users by conventional route, in an objective, transparent and non-discriminatory, at rates to be determined. The delegate will undertake to market the services to operators and interested users to allow access to more competitive and complete offers of electronic communications at very high speed. The services will include hosting services, provision of dark fiber, the fiber support on activated services, terminal services connection, sheaths rental offers, etc.

  • 1