Call +44 800 9755 164

Public tenders for construction in Bagnols-sur-ceze France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionFrancebagnols-sur-ceze

Industrial quality control services

CEA Marcoule | Published December 20, 2016  -  Deadline March 3, 2017

This contract is for technical inspection mission related to sustainability and islanding SVM (Storage Marcoule glasses). This technical mission addresses the GC works planned under the MOE contract for this sustainability (strengthening in particular fan assembly) but also on technical batches for ventilation, strong and weak current Courant needed to islanding and renovation of auxiliary functions of the SVM.

The mission includes firm benefits during the pre-project study phases and constitution / preparation Company Consultation Records for works contracts, on the following missions:

- The Mission on the soundness of the construction and equipment of inseparable elements,

- S Mission on the security of people,

- Mission PS on the safety of people in buildings in an earthquake,

- Mission THE on the strength of existing impacted by the renovation work,

- Mission P1 on the strength of separable equipment.

The mission includes optional services during the implementation phase of study and realization of renovation works on the following tasks:

- The Mission on the soundness of the construction and equipment of inseparable elements,

- S Mission on the security of people,

- Mission PS on the safety of people in buildings in an earthquake,

- Mission THE on the strength of existing impacted by the renovation work,

- Mission P1 on the strength of separable equipment.

Construction of a multi-home

Commune de saint-yrieix sur charente | Published January 9, 2017  -  Deadline February 3, 2017
Construction of a multi-home

Construction work for college buildings

CCI du Var | Published December 21, 2016  -  Deadline February 13, 2017

setting out of water and out of air works, finishing works and additional facilities under construction on the site Chalucet by the CCI of Var of a building of 5200 m2 of floor area for notament international business school Kedge Business school and of economic activities trays. Lot "Gros Oeuvre - Earth - Metal framing" of the project to build the area of ​​creativity and knowledge (site of the former hospital Chalucet) is the subject of a specific consultation group control and is closely nested with the object of this consultation process.

Cover - etanchéité - metal siding.

Outside joinery - occultations.

Metalwork Locksmith.

Hvac - plumbing - sanitary.

Cfo - CFA - electricity.

elevators - monte loads.

Interior woodwork.

Partitions - -Processing Acoustic ceilings.

Flooring and walls.

Painting - cleaning.

movable walls.

Construction work

Centre hospitalier d'Aunay-sur-Odon | Published January 12, 2017  -  Deadline February 20, 2017

Works contract-modernization Hospital overall Aunay-sur-Odon-operation.

Construction period: 44.5 months including preparation period (1 month), weather, operations prior to receipt and leave.

Masonry - shell.

Seal.

Facelift.

Existing siding and wood-frame coverage.

composite cover-cladding and zinc siding.

External aluminum joinery.

metal joinery locksmith metal frame.

interior wood joinery.

drywall insulation.

Suspended ceilings.

Faience tiles soft floors.

Paint wall coverings.

Lifts.

Signage.

sanitary plumbing.

medical fluids.

Smoke ventilation heating.

Strong currents and low current electricity SSI.

Roads various networks.

Green spaces.

Construction of a multidisciplinary health house lot 4 - external joinery

Communaute de communes pays belmontais | Published December 26, 2016  -  Deadline January 25, 2017
Construction of a multidisciplinary health house Lot 4 - external joinery

project management contract for the construction of a cultural and sports center

Ville de saint marcel sur aude | Published January 12, 2017  -  Deadline February 20, 2017
project management contract for the construction of a cultural and sports center

Construction of 9 multi-family housing and a medical center in Tillières sur avre

Le logement familial de l'eure | Published December 16, 2016  -  Deadline January 25, 2017
Construction of 9 multi-family housing and a medical center in Tillières Sur Avre

CONSTRUCTION OF CLASSROOM SCHOOL LION. This consultation provides for mandatory visits places (see the provisions of the settlement of the consultation). . Romilly Sur Seine

Ville de romilly-sur-seine | Published January 20, 2017  -  Deadline February 24, 2017
CONSTRUCTION OF A LION ROOM SCHOOL CLASS

MDOI_CREPS_CT | Technical control mission on the construction of CREPS the Loire Valley at the Chapel on Erdre (44)

Conseil Régional des Pays de la Loire | Published January 11, 2017  -  Deadline February 6, 2017
Technical control mission on the construction of CREPS the Loire Valley at the Chapel on Erdre (44)

project management contract for the construction of a building of economic activities in the Roches St Symphorien sur Coise

Cc monts du lyonnais | Published January 17, 2017  -  Deadline February 14, 2017
project management contract for the construction of a building of economic activities in the Roches St Symphorien sur Coise

2017P72025800 | Regroup training services and logistics Brigade Fire Brigade of Paris - Construction of the building restoration - 35 Avenue Guy Moquet? 94450 LIMEIL-BREVANNES

Préfecture de Police de Paris | Published January 11, 2017  -  Deadline February 23, 2017
Regroup training services and logistics Brigade Fire Brigade of Paris - Construction of the building restoration - 35 Avenue Guy Moquet? 94450 LIMEIL-BREVANNES

44SN-12D21959-TRX | Construction of the aerospace cluster in high school Aristide Briand in Saint Nazaire (44)

Conseil Régional des Pays de la Loire | Published December 1, 2016  -  Deadline January 25, 2017
This contract is for the construction of a center to host aviation sections of Aristide Briand and BROSSAUD BLANCHO schools in Saint Nazaire (44). This provides for: - Building restructuring in R + 1, which will eventually include a lobby, various side rooms (staff rooms, meeting room, living room of students ...), practical work rooms, teaching rooms, changing rooms, toilets, ancillary rooms (boiler room, storeroom, local household ...), part of the workshop aircraft and aircraft sections, work rooms and a room of technical documentation; - Extension to R + 1 also, which will include an expansion of the workshop, practical work rooms, teaching rooms, two shops and technical rooms.

Construction d'un complexe municipal

Ville de saint palais sur mer | Published January 17, 2017  -  Deadline February 17, 2017
Construction d'un complexe municipal

Building construction work

Résidences sociales de France, représentée par Laurence Boucard | Published January 5, 2017  -  Deadline February 3, 2017

Rehabilitation, design-build, a hotel socially oriented residential housing and 1 171 Local 103-107 Marten street activities in Clichy (92).

This contract is for rehabilitation, design-build, a hotel complex social purpose of housing 171 and 1 local activities for SDP 5500 m 2 103-107 rue Martre Clichy (92).

This program will label the BBC renovation.

The winning consortium will develop the project in BIM mode.

Pumping station construction work

Vendée Eau | Published January 10, 2017  -  Deadline February 6, 2017

Sector Rochereau - alteration of the pressure & Amp pumping station; Quot; Les Roches & Amp; Quot; in the municipality of Boupere & Amp; Quot;

Sector Rochereau - alteration of the booster pump station "Les Roches" Boupère on the Common.

The works mainly comprise:

- The establishment of a pumping capacity of 100 m3 / h 170 m HMT, allowing the supply of the sheet of the Monnerie;

- The renewal of equipment in place for the supply of Puy Lambert tank, according to the following operation planned:

- Pumping mode with target of 110 m3 / h to 160 m hmt;

- Pressure / distribution mode with target of 110 m3 / h to 189 m HMT.

The upstream connection will be done on the existing pipeline DN 250 mm from the tank Jonchère, the throughput capacity will increase from 100 to 210 m3 / h.

Pumping station construction work

Vendée Eau | Published January 17, 2017  -  Deadline February 6, 2017

Sector Rochereau - alteration of the booster pump station "Les Roches" in the town of Boupère.

Building a local for the preparation of food products

Cte de cnes de la baie de st valery | Published December 29, 2016  -  Deadline February 13, 2017
Building a local for the preparation of food products

MAPA Construction - rehabilitation of the 'Big House' Bures sur Yvette

Commune de bures sur yvette | Published December 22, 2016  -  Deadline February 6, 2017
MAPA Construction - rehabilitation of the 'Big House' Bures sur Yvette

Construction of a fish and a valve system to the right of the water intake of the ASA viette life on viette

Syndicat mixte du bassin de la dives | Published January 20, 2017  -  Deadline February 17, 2017
Construction of a fish and a valve system to the right of the water intake of the SAA Life on Viette Viette

project management assignment for the construction of two buildings at the operations center of use, maintenance and intervention (CEMI) Digoin (71)

Voies navigables de france | Published December 22, 2016  -  Deadline January 30, 2017
project management assignment for the construction of two buildings at the operations center of use, maintenance and intervention (CEMI) Digoin (71)