Public tenders for construction in Aubervilliers France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionFranceaubervilliers

Engineering works and construction works

SNCF Réseau | Published July 9, 2016  -  Deadline July 28, 2016
cpvs
45220000

This contract notice relates to the production of all the work necessary for the construction of a new railway bridge said OA NO0 * * under the line No. 570000 from Paris to Bordeaux at kilometer 23 + 263 and associated rail works path for the transaction.

This contract includes the types of works necessary for the completion of the work of art (railway bridge):

- Construction of bridges and civil engineering (earthworks, foundations, concrete, various civil engineering, etc.)

- Related road work related to the implementation of the work of art (after shifting prefabrication work) during a blitz.

Brief description of work to be done:

Construction of bridges and civil engineering:

* Preparatory work:

- Site area including access,

- Decommissioning water prefabrication area (production of a sealed enclosure):

- Pumping Basic Solution

- Alternative technical solution: piles,

- Prefabrication area for work,

- Interim storage area for reception of earthworks during the blitz (OCP)

* Prefabrication of a book-type bridge-frame reinforced concrete in the immediate vicinity of the railway platform consists of 4 tracks:

- Range: 15.85 m (right opening)

- Overall length: 37 m (with approach spans)

- Width: 18.50 m

- Minimum height: 8.56 m

- Total weight: 4400 t

- Excavation (during the blitz): 12 000 m3

* Creation of a storage area for earthworks,

* Earthworks,

* Ripping the prefabricated structure during operation dune punch 72 hours

Related work pathways:

* Removing the tracks and provisional deposit prior to the introduction of the book operation,

* Evacuation of materials,

* Supply and implementation of materials including compaction layers, <...

Works for complete or part construction and civil engineering work

SNCF Réseau * DTA IDF | Published October 8, 2016  -  Deadline November 4, 2016
cpvs
45200000

The amounts shown below are given simply as an indication.

Construction work for buildings relating to railway transport

SNCF | Published December 19, 2015  -  Deadline January 15, 2016
cpvs
45213320

This Service hull takes its place at the north end of the cross dock, in the Avenue de France. The newly created local therefore include: - relay toilet with an area of ​​114.7 m *, operated by a dealer - Instructions and found objects and spaces dedicated staff for operating these services, with an area of ​​324.4 m * - A storage space door luggage trolleys to the station, with an area of ​​92.5 m2 - Two local total area of ​​48 m * Technical. - Vacant premises in website background with a total area of ​​160m * The surface of the hull is 570 m *, excluding outstanding and stock rear carriages. For looks impossible to avoid, technical rooms are created to ensure their access. The local sealing is ensured by a sealed steel container detached from the roof slab overhangs. The project constituting the extension of an existing building and located in a particular site, in a traffic lane, it is not concerned with the RT 2012.

Engineering works and construction works

SNCF réseau, représenté par la direction territoriale achats Île-de-France (DTA IDF MN) | Published November 25, 2015  -  Deadline January 11, 2016
cpvs
45220000

Civil works market, art work and related work VRD, sanitation, track and catenary, to replace the steel deck of Marly-le-Roi Viaduct (Bridge-Rail) and the reinforcement of its support. The work includes mainly: The apron is based on the existing abutments and piles after reinforcement and adaptation.

Engineering works and construction works

SNCF Reseau | Published July 5, 2016  -  Deadline July 22, 2016
cpvs
45220000

This contract notice relates to the production of all the work necessary for the construction of a new underpass (PASO) with its emergence and track rail related work required for the operation.

This contract includes the works of nature necessary for the completion of the work (underpass and Emergence):

* Works of art works and construction works (earthworks, foundations, concrete, civil engineering platforms, etc.)

* Road works related to the realization of the work of art (PASO) with installation of auxiliary aprons (TA) during a blitz.

Brief description of work to be done:

Legislative history:

* Removal of existing shelters ropy

* Route works:

- Cutting LRS normal bars

- Interim expander Creation

- Removal of part of the channels 1 and 1Bis for setting up auxiliary aprons

* Works of art work:

- Establishment of two auxiliary aprons 27 meters

- Camarteaux Realization based on micro stakes

- Establishment of temporary docks aprons

- Lowering of the water table

- Creation technique sealed enclosure of Jet Grouting

* Civil work platforms:

- Partial demolition of fences (side docks 1)

- Partial demolition of platforms (platforms 1 and 2)

- Installation and removal of temporary docks

Major works:

* Create a new underpass (PASO) under the tracks 1 and 1a (end of future correspondence corridor GPE) and its emergence on the quays (quay side channel 1 and central quay No. 2):

- Type: concrete frame

- Working width: 10.10 m

- Length: 18.59 m

- Minimum height: 4.19 m

- Height at the key: 4.65 m

- Width of the hoppers: 4.00 m

* Earthmoving

* Reconstruction of a new marquee:

- New canopy that will cover the ascenseu ...

Engineering works and construction works

SNCF Réseau | Published August 5, 2016  -  Deadline September 9, 2016
cpvs
45220000, 45221112, 45262620, 45112500, 45232410

Zone 6 is the second ramp aprons side Le Havre (firm section)

- VRD (zones 4, 5 and 6): equipment of the air link (coatings and various signs) and road improvements for access to the soft link at the bottom of the ramps (furniture, curbs, barriers, ...) and other road improvements required by third parties,

- Electric power (optional tranche): lighting of the air link (ramp and work on the Seine).

Engineering works and construction works

SNCF Réseau — DTA IDF et MN | Published August 10, 2016  -  Deadline September 5, 2016
cpvs
45220000, 45221112, 45262620, 45112500, 45232410

This wall has the head of a baffle to reduce noise pollution,

- The establishment of an acoustic screen based on sill near the PRa Meissonier.

Engineering works and construction works

SNCF Réseau — DTA IDF et MN | Published April 23, 2016  -  Deadline May 11, 2016
cpvs
45220000, 45221112, 45262620, 45112500, 45232410

This wall has the head of a baffle to reduce noise pollution,

- The establishment of an acoustic screen based on sill near the PRa Meissonier.

Construction work for buildings relating to railway transport

SNCF | Published April 7, 2016  -  Deadline April 27, 2016
cpvs
45213320

The Chartres Pole Station project is a complete redevelopment of the station of Chartres and its surroundings, led by the town of Chartres to build homes, shops, offices and other facilities, and facilitate intermodal transport. This project requires between other liberation by SNCF website said the Epargne, adjacent to the station, for its disposal in local public company Chartres Facilities for the construction of a sports and cultural complex, parking and a bus station.

The Savings site now hosts approximately 3500 m2 of offices, technical rooms, workshops and other local SNCF, 11 sidings and multiple rail equipment * * back office. About 300 agents SNCF SNCF Network Mobility and take and / or cease service on this site.

This project is very sensitive, the Memorandum of Understanding between the city of Chartres and SNCF provides for a release of all of the savings allowances in December 2017.

This contract is for the reconstruction of buildings for offices and the technical premises infrapôle Parisian SNCF Network, existing on the site said the Epargne, the site says Gallardon Chartres.

The amenities of Gallardon site under the contract provide for the reconstruction of offices, workshops, storage parks and shops of different services Routes, Catenary and Mechanical Services SNCF NETWORK or 2990 m2 of construction and 2900 m2 of storage.

This call for applications concerns the work as general contractor of reconstruction of INFRA Maintenance Buildings on site Gallardon.

The market consists of a:

- Firm phase (all the buildings listed in II.2.1 except building A and building on pit)

- Conditional phase (building A and building on pit).

Engineering works and construction works

SNCF | Published October 7, 2017  -  Deadline October 23, 2017
cpvs
45220000

Construction of a retaining wall along Future Lane 43 to maintain the existing embankment and to protect maintenance and maintenance personnel.

Description of the proposed situation

It is an inverted T-reinforced concrete wall, built to protect from tie-up temporary shielding to support neighboring land (roads, roads, riverside buildings)

The top of the sole is rigged about 50 cm under the future track of the V43 except at its southern end where it is rigged under a deeper drainage network.

The head of the wall has a top track of 70 cm and then a slope.

The wall has a catenary niche on the south side.

A catenary awning will be located at the level of the wall of the catenary niche.

These vertical or perforated vertical catenary canopies shall have an IP2X degree of protection and a minimum height of 1,80 m (in accordance with the specifications for the design of protective awnings, side guards and passages IGTE 21476/01570 and 21476 / 215750).

The north end has a crinoline ladder for access to the upper runway.

An entrance staircase will be present.

A vegetation of the slope is present on the structure.

The wall has a high concrete runway and a low asphalt runway.

Significant quantities:

Excavations for civil engineering works 3 800 m³

Rigid forms for ordinary facing 1 100 m²

Rigid formwork for fine cladding 650 m²

Concrete for reinforced concrete 950 m³

Steel frames 142 500 kg

Supply of embankment materials contiguous to the masonry and base structure 2,400 m³

Implementation of embankments contiguous to masonry and base structure 2,400 m³

Retaining Berlin berth, including platforms 1,300 m²

The quantities indicated above are given merely for information purposes.

Engineering works and construction works

SNCF Réseau | Published January 23, 2016  -  Deadline February 22, 2016
cpvs
45220000

This contract notice relates to the completion of all the work for the construction of docks and setting accessibility of the station-Aubergenville Elisabethville in the EOLE project, extension of the RER E in the west.

Brief description of work to be done:

* Public Construction / Civil Engineering miscellaneous:

- Enhancement of both platforms up to 920 mm from the running surface,

- Adapting the length of platforms for a useful length of 225 m, creating a ramp 11 ml at each end of platform 1 and adaptation of ramps on platform 2,

- Creation of two hoppers elevators in the docks, giving access to the underpass,

- Realization of micropiles for shelter,

* Masonry:

- Resumption of stair cavities, garden walls, steps, platforms enhancement next, etc,

* Metalwork / Metalworking:

- Handrail, guardrail, fencing, gates, etc.

* Metal frame:

- Replacement of existing shelters by shelter-type Pompadour,

* Electrical energy / telecommunications:

- Lighting, power, sound system, remote display, video, etc.

* Safety equipment.

Engineering works and construction works

SNCF Réseau, représenté par la direction territoriale achats Île-de-France (DTA IDF MN) | Published December 23, 2015  -  Deadline January 13, 2016
cpvs
45220000

The law requires the STIF to make the stations accessible to people with reduced mobility (PRM). This is done as part of a project which is called - blueprint of accessibility Île-de-France - (SDA) In this case, the project is to make it accessible to people with reduced mobility (PRM) the Station Issy Val de Seine The works mainly comprise: Comprehensive implementation studies, site facilities, Public Construction: Creating an underpass (PASO) in channels 1 and 2 Civil Engineering (hoppers lift Body docks): Creation of 2 hoppers lift, 3 stairs and asphalt work on the docks Second works: dock furniture, metalwork, painting signage High Current (lighting building the station, change electrical installations) Current Low (Video, Telecom).

Track construction works

SNCF réseau — DTA IDF et MN — direction territoriale achat Île-de-France et marchés nationaux | Published October 22, 2015  -  Deadline November 23, 2015
cpvs
45234116, 45234113, 45112500, 45232410

As part of the creation of a rapid succession dense areas in Île-de-France, SNCF Network decided to create 5 work bases including one in Vaires-sur-Marne located on the line No. 70 000 Noisy-le-Sec in Strasbourg. The realization of a fast track after renewal involves having a site with one hand a sufficient number of channels to receive, train and maintain different work trains and construction equipment, second take into account the needs of the fast following in terms of provision of future pathways based projects to achieve. The created facilities will receive all the materials (ballast, rails, turnouts, sleepers, materials menus) and temporarily store the removed materials that will be shipped later (old rails, turnouts, catenary, ... ). As regards the storage platforms new materials or scraps, they must offer substantial areas served by roads and railways.

Engineering works and construction works

SNCF Réseau | Published October 31, 2017  -  Deadline November 20, 2017
cpvs
45220000

This contract notice concerns the completion of all the work necessary for the creation of a rail bridge under the line 990000 (Grande Ceinture de Paris) at PK 104 + 235 as well as related railway works (track and catenaries). ) directly related to the realization of the work.

This contract includes the work necessary to complete the construction of a bridge structure and consists mainly of the following works:

Works of art and civil engineering necessary for the realization of the railway bridge including sealing works:

earthwork

Realization of a definitive retaining structure (lg 87ml)

Wall with secant piles of 800 diameter

Bed anchor anchors active in temporary situation

Realization of temporary retaining structures in sheet piles

Sheet pile curtain (lg 104 ml)

Buttress sheet pile curtain (lg 17 ml)

Bed anchor anchors active in temporary situation

Realization of a prefabrication area for the structure

Realization of a rail bridge

Placing of filter points for tablecloth

Installation of the rail bridge during a punch operation (OCP)

Installation of waterproofing screed

Sealing against casing

Realization of access to future wharves (fixed stairs and elevator shafts)

Conducting remediation works in conservatory measures (works in interfaces with the structures of discharges of rain water (EP) of the quays towards the urban network)

Related railway works (track and catenary) related to the implementation of the bridge structure during a punch operation (OCP):

Removing and installing tracks associated with the shifting of the book

Moving existing catenary supports (to release the footprint of the structure)

Significant quantities:

The main quantities listed below are synthesized and globalized.

The d ...

Construction work

SNCF réseau en son nom propre ainsi qu'au nom et pour le compte de SNCF mobilités | Published July 5, 2016  -  Deadline July 22, 2016
cpvs
45000000

PRM accessibility at the station of Epinay Villetaneuse *

Works include:

- Disburse the high zone of the court.

- Disburse access to remove the steps.

- Demolish the box / local to facilitate the flow

- Removing and installing the line of CABs (with an additional trunk)

- Cover the line Cabs with a light shelter.

- Realize the pit lift.

- Create a platform to the pylon to access the dock.

- Removing and installing sales and telecom equipment.

- Add the intercom, video support and the intensification of passenger information.

Building construction work

SNCF Réseau | Published March 17, 2016
cpvs
45210000

Glades Verneuil

Railway construction works

SNCF Réseau | Published August 13, 2015
cpvs
45234100

Lot no 07

Engineering works and construction works

SNCF Réseau | Published January 26, 2016  -  Deadline February 26, 2016
cpvs
45220000

This contract notice relates to the completion of all works necessary for the construction of a rail bridge in the 4 railway line Massy in Choisy-le-Roi (985000), at kilometer 11 + 426, in the town of Orly (94), including the realization of the track works related to the book.

Brief description of work to be done:

Works of art work:

- Precast concrete Work to be completed in two parts, one to the west, the other east,

- Junction of two frames between tracks 1 and EV2,

- Half frames make a raft of prefabrication also acting raft guide during shifting,

- Prefabrication of half frames closest to the tracks,

- Realization of temporary shields (butonnés side lanes SNCF / tirantes for the rest).

Track Works:

- Deposed and installing pathways involved in the creation of the rail bridge.

Track construction works

SNCF Réseau | Published June 10, 2016
cpvs
45234116

RVB 2018 — lot 3 (base V60)

Construction project management services

SNCF Réseau | Published July 23, 2016
cpvs
71541000

project management assistance 2 missions