Building construction work
SNCF | Published December 23, 2015 - Deadline January 22, 2016
The objective is the construction of four buildings. - Workshop (8425 m2), including the Hall of corrective and preventive maintenance of rolling stock, office building, annex building and sand station, lathe, bridge, bridges, washing machine and 1/2 paint booth, - the local goalkeeper (73 m2), located in the entrance of the site, - the local waste (644 m2), installation for the treatment of effluents and waste of the Workshop - cover outdoor pits on channels 52 and 53 in storage area. Options are provided: - security guard police dog - vaults overhead lighting with solar protection.