Call +44 800 9755 164

Public tenders for construction in Aix-en-provence France

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionFranceaix-en-provence

Insurance Market 'construction'

Ville de mons-en-pevele | Published April 13, 2017  -  Deadline May 23, 2017
cpvs

Insurance Market 'construction'

Construction work

Semcoda service maîtrise d'ouvrage | Published April 8, 2017  -  Deadline May 12, 2017
cpvs
45000000

Pont d'Ain (01160) - ZAC Maladières - Construction of 75 collective housing.

Earthworks - HHT.

Big work.

Timber - rooftiles - zinc works.

Seals.

PVC exterior woodwork.

interior wood joinery.

Partitions - dubbing - false ceiling - painting.

Sanitary Plumbing - Heating - VMC.

Electricity - high and low voltage.

Façade renovation of facades.

Locksmith - input sets.

Screed - tiles - tiles.

Coatings thin soils.

glued floors.

Elevators.

Green spaces.

Construction work for water and sewage pipelines

Société du Canal de Provence et d'Aménagement de la Région Provençale | Published April 12, 2017  -  Deadline May 10, 2017
cpvs
45231300, 45232100

Diversification and securing the water supply Durance Val - adduction - the operation comprises the laying of 12 km adduction DN 600 + renovation of Pontoise network of about 5 km between Vinon-sur-Verdon ( department 83) and Manosque (department 04).

Construction work

GPT Semcoda/Commune Lons-le-Saunier | Published April 22, 2017  -  Deadline May 22, 2017
cpvs
45000000, 45111290, 45112500, 45223220, 45261100, 45261210, 45262650, 45261420, 45421150, 45421000, 45421152, 45421146, 45442100, 45330000, 45232460, 71314100, 45331000, 45443000, 44316500, 45432110, 45431000, 45432111, 45313100, 45112710

Construction of a health center, business premises and 20 housing units in Lons-le-Saunier (39).

Market with a firm slice city: building health house, a firm slice Semcoda: housing buildings and an optional slice City: interior design of the building Go élan.

As an indication, the works will start on 7.8.2017 for the TF Ville and for the TF Semcoda, the deadline for realization of the firm tranches carried out concomitantly is 17 months each including the month of preparation and 4 months and Half for the optional tranche including the month of preparation.

As an indication, the decision to strengthen the optional tranche will take place in April 2018.

Attention: site visit compulsory for lots 010 - outdoor networks, 020 - earthworks and 690 - approaches: appointment with A.Ddi.C'T, M. Chalumeau on 03 84 47 13 62.

External networks.

Earthworks.

Big work.

Timber framing - zinc roofing - zinc cladding.

Waterproofing.

PVC exterior joinery.

Wood / Aluminum Exterior joinery.

Interior woodwork.

Doublings - partitions - ceilings - paints.

Sanitary Plumbing.

Electricity - strong currents.

Low voltage.

Heating - ventilation.

Stone facades.

Locksmithing.

Tiles - tiles - earthenware.

Flexible floor coverings.

Lifts.

Approaches.

Construction work for industrial buildings

DALKIA Centre Est | Published April 15, 2017  -  Deadline April 26, 2017
cpvs
45213250, 45251250, 45251142

Market consists of three lots on the key achievement in buildings intended to shelter hand power generation equipment for the hot network and district cooling Metropolis Center.

The following work will be executed to the completion of the book:

- outdoor area (general earthworks, networks diarrhea, management of polluted land, demolition, VRD)

- civil engineering (foundations, structural works and metal constructions out process);

- realization of facades and external aspects in accordance with architectural requirements transmitted by the originator

- Finishings (facades, exterior joinery, roofing / waterproofing, flooring, false ceilings / false floors, wall / plastering / painting, plumbing / sanitary, HVAC control room).

This item will house a central chilled water of 10 MW, a cold storage 64 000 kWh and a sub heat exchange station HP / LP 30 MW in the third district of Lyon (69).

The work to be performed include:

- The closure of the site and its maintenance during the construction period

- temporary site feeds

- the making available of a life based on the complete duration of the project including finishing and process

- realization:

o diaphragm walls

o of the injection plug

o earthmoving

o groundwater pumping

o the floor

o elevations

o internal structures

o of the upper cover slab

o finishing work

o embankment

o locksmith

o breakdowns

o etc ...

The following work will be executed to the completion of the book:

- outdoor area (general earthworks, networks diarrhea, demolition, soil consolidation, storm water basin, VRD, outdoor furniture)

- civil engineering (foundations, structural works and metal constructions out process);

- realization of facades and external aspects in accordance with architectural requirements transmitted by the originator;

- Finishings (facades, exterior joinery, roofing / waterproofing, flooring, false ceilings / false floors, dubbing / partition / plastering / painting, plumbing / sanitary, office space HVAC (~ 900 m 2 )).

Technical control mission relating to the construction operation headquarters and central services of the University of Reims Champagne Ardenne

Region grand est | Published March 27, 2017  -  Deadline April 24, 2017
cpvs
71631300

Technical control mission relating to the headquarters building and operation of the central services of the University of Reims Champagne Ardenne

Security Mission and coordination of health protection related to the construction operation headquarters and central services of the University of Reims Champagne Ardenne

Region grand est | Published March 27, 2017  -  Deadline April 24, 2017
cpvs
71317210

Security Mission and coordination of health protection related to the headquarters building and operation of the central services of the University of Reims Champagne Ardenne

Architectural, construction, engineering and inspection services

EPGT | Published April 8, 2017  -  Deadline May 10, 2017
cpvs
71000000

client agent of mission.

owner to attorney mission (within the meaning of the MOP law) as part of the reconstruction of a nursing home operation (Accommodation facility for dependent elderly people).

Capacity: 158 beds.

Living in work: 8256 square meters.

the transaction completion process:

Design and production.

District-heating mains construction work

DALKIA Centre Est | Published April 21, 2017  -  Deadline May 5, 2017
cpvs
45232140

Consultation for the supply and installation of 3 sections of low-pressure urban heating and cooling networks in pre-insulated tubes in Lyon.

The contract will include the design of the network (execution studies, flexibility calculation note ...), supply of pre-insulated elements, realization of the trench, installation and welding of pre-insulated parts, realization Junction kits, testing, trench fill and temporary repairs.

Consulting for the supply and installation of a low-pressure district heating network in pre-insulated tubes on Lyon 3 Th , Between rue Félix Faure and boulevard Pinel, via avenue Lacassagne:

- a firm section of about 1,800 meters in DN450 and about 450 meters in DN250 to be completed on 2017 - 2018,

- an optional section No. 1 of PE pipes with diameters of between 200 and 350 mm, of a linear length of approximately 300 meters to be produced on 2017 - 2018,

- an optional tranche n ° 2 in DN450 of approximately 1100 meters to be carried out in a predicted way over 2020.

The projected duration of the works for the firm tranche and the optional tranche n ° 1 will be between 6 and 8 months between September and April 2018 and around 4 to 6 months out of 2020 for the optional tranche n ° 2.

The contract will include the design of the network (execution studies, flexibility calculation note ...), supply of pre-insulated elements, realization of the trench, installation and welding of pre-insulated parts, realization Junction kits, testing, trench fill and temporary repairs.

Consultation for the supply and installation of a low-pressure district heating network in pre-insulated tubes on Lyon 8 Th , And Bron between rue Professor Beauvisage in Lyon 8 Th And Lionel Terray street in Bron: about 400 meters in DN600 and about 4 300 meters in DN450 to be realized in 2017 - 2018.

The market will include the design of the network (study ...

Landfill Construction of electrical networks, electronic communications and public lighting

Ville de la queue-en-brie | Published March 31, 2017  -  Deadline April 27, 2017
cpvs

Landfill Construction of electrical networks, electronic communications and public lighting

Special trade construction works other than roof works

Ville de Salon-de-Provence | Published April 11, 2017  -  Deadline May 9, 2017
cpvs
45262000

This framework agreement concerns the maintenance work, maintenance and rehabilitation of municipal buildings. The work will cover all premises belonging to the heritage of the town or the CCAS. Moreover, local which can be purchased or leased by the city or the CCAS during the validity period of the framework agreement will be included in this Framework Agreement. The work, subject of the framework agreement will be executed either under maintenance of premises, or in connection with various transactions renovations or development, maintenance and major repairs, and intervention of emergency. The precise nature and location of work will be designated in the subsequent contracts or purchase orders. This consultation concerns only lot 12 "difficult access work (rope access)" filed away at a previous consultation.

difficult access work (rope access).

Reinforcement works of the cliff of the drilling of the ghouls to the pebbles - territory of the country salonais

Metropole d aix marseille provence | Published April 18, 2017
cpvs

Construction of the cliffs of the Goules drilling in Pélissanne - Territoire du Pays Salonais

2017-EAUXUSEES | Network Works wastewater sanitation

Commune de Parentis en Born | Published April 13, 2017  -  Deadline May 19, 2017
cpvs

This contract is for the execution of works on sanitation, building, pipe replacement and construction of connections on the territory of the commune of Parentis

Engineering services

Commune de Vaulx-en-Velin | Published April 20, 2017  -  Deadline May 19, 2017
cpvs
71300000, 71631300

alloti market. Period of 48 months from the notification, notification scheduled for July 2017.

Monitoring the design stage since the sketch phase.

Monitoring the performance of work.

Level Mission 2.

Monitoring the design stage since the sketch phase.

Monitoring the performance of work.

requested tasks: L, P1, S, SEI, PS, AT PS, HAND, AT HAND, PH.

PHA, TH, AT TH, PV, GTB VIEL.

Monitoring the design stage since the sketch stage

Monitoring the performance of work

2-3 passages per week minimum during construction.

The study of safety and public security will be made upstream in the design phase of the filing of the permit application to build.

  • 1