Call +44 800 9755 164

Public tenders for construction in Pielavesi Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Piela local and central kitchen, a construction consultant and construction supervision

Pielaveden kunta | Published December 18, 2015  -  Deadline January 20, 2016
cpvs
71530000, 71520000

Municipality Pielaveden ask for a quotation housing unit Piela home and was built in connection with the central kitchen rakennuttajakonsultti- and site supervision tasks of the extent stated in the invitation to tender. Site address is Tapiontie 1, 72400 Pielavesi. The building has a gross area approx. 3,500 gross m2, of which 60-seat accommodation unit accounted for approx. 3,000 gross m2 and a central kitchen share of approx. 500 brm2. Construction is carried out turn-key contract, which the contracting entity to tender for yourself. The indicative timetable is as follows: - February - June 2016 in the design, - June 2016 - June 2017 construction - June-September 2017 the yard and the area of ​​work. The construction of the object Turnkey career have been published in the tender 01.12.2015, http://www.hankintailmoitukset.fi/fi/notice/view/2015-027393/

Särkijärvi wetland construction phase 2

Särkikylän kyläseura ry | Published April 25, 2017  -  Deadline May 9, 2017
cpvs
45200000

1 the insulating film mounting 3150m (Appendix drawing) shall complete the work by volunteers two embankment and excavating drainage ditch and the embankment forming 2950M three wheeled deep water areas and construction countries piling embankments excavator 4 Ruununojan and Vistinnevanojan lower portion 620m peeling and deposition of sediments 5 Topsoil reunapenkereisiin 20 ha six mounting structures 6.1 drums 4 Chapter 6.2 Valtaoja alitusputkitus 2 x 6.3 Ylivirtauspadon and donut pit 7 construction of excavation drainage ditches of 1800m 8 Rock Excavation drainage ditch review 250 m2 1 the insulating film mounting 3150m (Appendix drawing) shall complete the work by volunteers two embankment and excavating drainage ditch and the embankment forming 2950M three wheeled deep water areas and construction countries piling embankments 4 Ruununojan construction and Vistinnevanojan lower portion 620m peeling and deposition of sediments in a surface reunapenkereisiin 5 20 hectares structures installation 6 6.1 6.2 4 pieces drums Valtaoja alitusputkitus 2 x 6.3 Ylivirtauspadon and drain donut 7 construction of Dry tusojien excavation of the 1800m 8 Rock Excavation drainage ditch Review 250 m2

Building construction work

Pielaveden kunta | Published December 4, 2015  -  Deadline January 18, 2016
cpvs
45210000

Project has the overall shape of the construction contract, turnkey -urakka. Turnkey contractors as undertakes to reconciling the contract price for the design and build municipal Pielaveden use Piela home, 60-seat service for the elderly part of the enhanced service for housing and municipal central kitchen in new a building, aluetöineen completely finished working order as discontinued subscriber mentioned documents at the time.

The sports hall renovation and extension works on 2nd phase of construction

Juupajoen kunta | Published October 7, 2015  -  Deadline October 30, 2015
cpvs
45000000

The construction project comprises both sports hall renovation works.

Building construction work

Pielaveden kunta | Published June 16, 2016
cpvs

Building a house

Building construction work

Pielaveden kunta | Published January 6, 2016  -  Deadline January 29, 2016
cpvs
45210000

Building a house

The health-Phase II renovation, plumbing and Construction

Pielaveden Kunta | Published October 27, 2015  -  Deadline November 20, 2015
cpvs
45210000

Health Centre Renovation, Phase 2, Savikontie 15, 72400 Pielavesi. The project consists of the renovation of the health center Pielaveden 2-phase LV-work. The renovations of the former changed from long-term Kyster administrative premises and auxiliary facilities acute compartment are also made room for social services, family counseling and home care. The so-called. Kitchen wing is dismantled and the necessary technical facilities transferred to the renovation of the area.

Puustellintien, Market Road, Square, Ikäläntien and Ainola road renovation, Step 1

Pielaveden kunta | Published February 27, 2015  -  Deadline March 25, 2015
cpvs
45200000

The building site is located in the center of Pielaveden, urban planning area. The work includes the first construction phase: - the square surface of the building in - Market Road fundamental improvement, - street lighting renewal and construction, - municipal and storm water management system and construction of a new, - the pedestrian pavement construction Tori road. The project is implemented as a package contract, a civil engineering contractor operates a total contractor, and the legislation referred to in the main implementer.

Dental salon demolition

Pielaveden kunta | Published January 22, 2015  -  Deadline February 20, 2015
cpvs
45111300

Demolition site consists of Pielaveden municipality-owned dental clinic dismantling, demolition waste matter in accordance with the further processing of the construction site, as well as trimming. Target is a 1968's built one-storey, flat-roofed, a surface area of ​​322 m2 of construction. The building has been demolished foundations. All construction waste is sorted and properly treated, and transported out of the property. The building site should be clean and smooth the ground surrounding the interest rate. The building has been carried out for asbestos and harmful substances in the mapping and the demolition works included in the contract.

Puustellintien, Market Road, Square, Ikäläntien and renovation of Ainola Road, Phase 2

Pielaveden kunta | Published March 11, 2016  -  Deadline April 11, 2016
cpvs
45200000

The work includes the construction of the second Ikälän- and Ainola Road fundamental improvement of street lighting

The total construction contract covers mm. the following works:

- All measurement and quality control work. (Tiiveysmäärityksiä made twelve builder shown from 12 x 3 pcs = 36 pcs)

- Clearing work (the developer performs commercial tree felling);

10 kilometers (equalization stacking areas include The contract),

- The protection of trees and shrubs during construction,

- Maanleikkaus- and earthmoving work,

- Cutting the masses driving the developer to demonstrate a location, drive to max.10 km (equalization stacking areas The contract includes, removable soils belong to the developer),

- Rock excavation works,

- Quarried stone by driving the developer to show the place and treatment there, drive to max.10 km,

- Päällysrakennekerrosten construction,

- A coating (Ab) construction,

- Purchase and installation of traffic signs,

- Road markings,

- Street lighting and electrical work to the extent of the electrical plan,

- Green jobs,

- Drainage works (storm sewers, storm water drains, soakaway, drains, open ditches and Connecting constructed drains / storm sewers to the new system);

- (Supply pipes and fittings and installation, as well as the construction of plot lines on the plot, constructed from the road area and the shut-off valve plugging and Connecting pipes) water pipes and sewers,

- Sewage and storm sewer inspection / well cards related to the acquisition gully,

- Purchase and installation of the edge supports,

- Post-production (regions placed the order, as they were prior to the start of construction),

- Accurate length,

- The final drawings (three paper copies as well as a series of numerical form, pdf to dwg)

- Job-term traffic and dust suppression.

The project is implemented as a package contract with civil engineering contractor is a contractor for the overall meaning of the legislation and the main implementer.

VIRTELÄNTIE 4 apartment block DISASSEMBLY

Kiinteistö Oy Pielaveden Vuokratalot | Published March 1, 2016  -  Deadline March 31, 2016
cpvs
45111300

Real estate company Pielaveden Vuokratalot ask for an offer in 1983 built three-storey blocks of flats owned demolition. The building floor area of ​​1084 m2 and a volume of 3670 m3.

The building has been demolished foundations. All construction waste and construction material must be transported away from the property. the necessary permits Waste submit all showing the construction of waste reception facilities or the contractor must submit an environmental permit if construction waste is disposed of in any other way. Pielaveden the municipal landfill may not be delivered other than soil.

Demolition work traces should be leveled with clean sand or gravel at ground level of the existing surrounding. Provide the necessary intensification of the fills to prevent collapse.

demolition of building subscriber searches purkamisluvan.

The building has undergone asbestos and hazardous substances inventory. Asbestos and hazardous substances demolition work included the demolition contract.

Property dismissal of district heating, water supply and power supply takes care of the subscriber before the start of the demolition work. Demolition work must not start before the em. Networks dismissals have been made. discharging the separated network of pipes and cables included to the work of land border with / connection to the Lock.

Demolition in the project is to comply with the Waste Act and Pielaveden municipal waste management regulations.

Piela local and central kitchen

Pielaveden kunta | Published December 1, 2015  -  Deadline January 18, 2016
cpvs
45210000

Project has the overall shape of the construction contract, turnkey -urakka. Turnkey contractors as undertakes to reconciling the contract price for the design and build municipal Pielaveden use Piela home, 60-seat service for the elderly part of the enhanced service for housing and municipal central kitchen in new a building, aluetöineen completely finished working order as discontinued subscriber mentioned documents at the time.

Pielaveden the municipality of the eastern part of the beach drafting of the component master plan

Pielaveden kunta | Published December 17, 2014  -  Deadline January 7, 2015
cpvs
71000000

The task is to draw up the eastern part of the municipality of the lakes to the beach area of ​​the Land Use and Building Act waterfront master plan of construction and special permits, business development, and environmental and landscape management basis. -Osayleiskaava Is intended to prepare the so-called. the legally rantaosayleiskaavana. Meaning partial master plan can be seen as a complex. From a general point of view, explaining the use of areas, so that the landscape and nature on behalf of precious beaches and areas can be preserved in their natural state as possible, as well as regional plan and other decisions of the authorities to ensure implementation. Private landowners point of view, the design is inextricably related to the construction opportunities settlement so that the landowners as equal treatment should be ensured. Component master plan to ensure the landowners the right to security aspects related to survive in. Therefore, it is necessary to beach areas to examine the premises and the landowner-case basis. The local master plan indicates the municipality's own will on how it wants to own their beaches and sparsely populated territory to develop.

CORRECTION NOTICE: Pielaveden the municipality of the eastern part of the beach drafting of the component master plan

Pielaveden kunta | Published December 18, 2014  -  Deadline January 7, 2015
cpvs
71000000

Original imoitus published in Hilmar 17/12/2014. The specified incorrectly in the statement of participation. Message changed the invitation to tender. Tenders submitted to the contracting entity not later than 07.01.2015 at 12.00. The task is to draw up the eastern part of the municipality of the lakes to the beach area of ​​the Land Use and Building Act waterfront master plan of construction and special permits, business development, and environmental and landscape management basis. -Osayleiskaava Is intended to prepare the so-called. the legally rantaosayleiskaavana. Meaning partial master plan can be seen as a complex. From a general point of view, explaining the use of areas, so that the landscape and nature on behalf of precious beaches and areas can be preserved in their natural state as possible, as well as regional plan and other decisions of the authorities to ensure implementation. Private landowners point of view, the design is inextricably related to the construction opportunities settlement so that the landowners as equal treatment should be ensured. Component master plan to ensure the landowners the right to security aspects related to survive in. Therefore, it is necessary to beach areas to examine the premises and the landowner-case basis. The local master plan indicates the municipality's own will on how it wants to own their beaches and sparsely populated territory to develop.

CORRECTION NOTICE: Piela local and central kitchen

Pielaveden kunta | Published January 4, 2016  -  Deadline January 29, 2016
cpvs
45210000

CORRECTION NOTICE: Correction of notification of the revised paragraph IV of 3.4, the deadline extended. The deadline for receipt of tenders 01/29/2016 at 12:00. Repair of notification of the revised paragraph IV of 3.8, the date of opening of tenders changed. Tenders will be opened 29.1.2016 at 12.00. Repairs also been made in the documents of this notice as a supplement. Project has the overall shape of the construction contract, turnkey -urakka. Turnkey contractors as undertakes to reconciling the contract price for the design and build municipal Pielaveden use Piela home, 60-seat service for the elderly part of the enhanced service for housing and municipal central kitchen in new a building, aluetöineen completely finished working order as discontinued subscriber mentioned documents at the time.

Talvikunnossapito- and tractor work Pielaveden municipal buildings and areas

Pielaveden kunta | Published August 25, 2015  -  Deadline September 18, 2015
cpvs
90600000

Municipality Pielaveden ask for winter maintenance work and tractor works a quotation of real estate and land contract period 1.10.2015-30.9.2015. Properties and areas are divided into 5 areas. Regions, each comprising one piece of the total. The contract includes the winter season for snow removal. In addition, 1-area comprises hiekoitustyöt all regions. Municipality acquires sanding material needed. Municipality brushing and any dust binding acquires, individually. The municipality takes care of himself mm. management and maintenance of structures and equipment. Aurausviitoituksesta and removing the signs POA contract with the winning contractor, as far as promotional fares are not suitable for jewelry. work. Required capes acquires a vehicle and arrange the necessary assistants. Tractor Works municipality of space according to need throughout the year and include a variety of tractor functions maintenance and construction work.
  • 1