Call +44 800 9755 164

Public tenders for construction in Lapua Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Road-construction materials

Lapuan kaupunki | Published December 16, 2016  -  Deadline January 31, 2017
cpvs
44113000

construction of municipal kätyettävien aggregates supply.

See. invitation to tender.

Construction work

Lapuan kaupunki, tekninen keskus | Published May 6, 2017
cpvs
45000000, 45330000, 42512300, 48921000, 45310000

Lapuanjoki high school built in the current Education Center Sedu Trade and administrative building a building C to Vesipalontie 2. The size of the new part of the project is about 1 to 900 krsm² be renovated and C-4 building laaajus about 000 krsm². The project is estimated there are about 6 000 000 EUR (VAT 0%).

The construction of the secondary new building forms, together with the Center Sedu C building campus unit. High school classrooms are placed mainly in the structure of a building C south of the new member. C building basement and the 1st floor is placed in the common space Center Sedu and high school. C on the 2nd layer will remain fully operational Center Sedu.

The plans are ready for the contract calculation at the beginning of June 2017. The acquisition of using the open procedure and tender documents will be available for download electronically from the bank project. Construction is scheduled to begin in late summer 2017. The construction project is carried out divided by the contract.

The construction project is carried out divided by the contract. The building contractor acts as the general contractor for the project and page-contractors are subjected to the main contract.

The contractor is sought:

1) The contract Architecture (RU as a general contractor);

2) The contract shafts;

3) The contract ventilation;

4) The contract automation;

5) The contract power.

Automation The contract can be combined with one-page contracts.

Drainage Construction

Lapuan kaupunki | Published December 16, 2014  -  Deadline January 15, 2015
cpvs
45000000, 45231300

Hella Earth - the fabric of the village sewerage consists of three works the whole. Transfer to the sewer, collector sewers and the fabric of the village sanitation. Construction areas are separate, but can be understood as a single entity. For each, however, provide your own contract price, which is based on mass quantities and unit prices. The question is, therefore, the unit price contract. Mass Quantities are not binding. The fabric of the village drainage system is optional.

construction of Viljelysteiden

Kangas Ikola Hellanmaan tilusjärjestelyn jakokunta | Published October 7, 2016  -  Deadline October 20, 2016
cpvs
45200000

See the tender documents.

Lapuanjoki secondary new construction and renovation of partial Center Sedu building C (RU, PU, ​​AU and IU + SU)

Lapuan kaupunki, tekninen keskus | Published June 20, 2017  -  Deadline August 7, 2017
cpvs
45000000

Lapua high school be built in the current Vocational Education Center Sedu and Trade in connection with the administration of the building, ie the C building at Vesipalontie 2. The new section of the project is approx. 2000 m2 and the renovated Building C n. 4950 brm2. C-building, most significant reorganization measures are 0 and 1. floor. The construction of the secondary new building forms, together with the Center Sedu C building campus unit. High school classrooms are placed mainly in the structure of a building C south of the new member. C building basement and the 1st floor is placed in the common space Center Sedu and high school. C on the 2nd layer will remain fully operational Center Sedu. The construction project is carried out divided by the contract. The building contractor acts as the general contractor for the project and page-contractor for work other contractors are subjected to the main contract. The contractor is sought: 1) works contract (RU acts as the general contractor); 2) The contract shafts; 3) The contract IVA (ventilation and building automation tasks); 4) The contract power. Lapua high school be built in the current Vocational Education Center Sedu and Trade in connection with the administration of the building, ie the C building at Vesipalontie 2. The new section of the project is approx. 2000 m2 and the renovated Building C n. 4950 brm2. C-building, most significant reorganization measures are 0 and 1. floor. The construction of the secondary new building forms, together with the Center Sedu C building campus unit. High school classrooms are placed mainly in the structure of a building C south of the new member. C building basement and the 1st floor is placed in the common space Center Sedu and high school. C on the 2nd layer will remain fully operational Center Sedu. The construction project is carried out divided by the contract. The building contractor acts as the general contractor for the project and page-contractor for work other contractors are subjected to the main contract. The contractor is sought: 1) works contract (RU acts as the general contractor); 2) The contract shafts; 3) The contract IVA (ventilation and building automation tasks); 4) The contract power.

Alanko nursery-school center CONSTRUCTION, HVAC AND ELECTRICAL ENGINEERING

Lapuan kaupunki, tekninen keskus | Published July 3, 2015  -  Deadline August 14, 2015
cpvs
71320000

It is an EU Registration Procedures Alanko kindergarten-school structure, HEVAC and electrical design for the restricted procedure tender. This notice is applied for the participants to separate structural, HEVAC and electrical design for tenders. Built in Lapua Alanko Alanko area nursery-school center with a gross area of ​​approximately 10 000 m². Nursery-school center is placed in kindergarten, elementary school primary school (0-6), high school, special school, sports hall and central kitchen. Nursery-school center has room for about 450 primary school pupils, secondary school stu- dents 300 and 105 kindergarten children. Attached is an idea from the architect's sketches. Project architect and main design ideas competition held by the consortium was chosen as the best Arkkitehtiitoimisto Aarne von Boehm Ltd and Rudanko + Kankkunen Architects Ltd. The project is planned to be built in the years 2015-2017 and the years 2017-2019. Alanko nursery-school center total cost estimate of about EUR 20.8 million. EUR (VAT 0%).

Nautakasvattamo

Jussi Korpi | Published May 9, 2017  -  Deadline May 23, 2017
cpvs
45000000

Cattle breeding establishment and the slurry tank as well as the construction of the warehouse. join in connection with the construction of the apevaununb acquisition. Cattle breeding establishment and the slurry tank as well as the construction of the warehouse. join in connection with the construction of the apevaununb acquisition.

KT66 and Gustav Tiituntien roundabout and subways

Lapuan kaupunki | Published March 3, 2017  -  Deadline March 20, 2017
cpvs

Merry and subways, as well as the current construction of an underpass repair traffic circle and subways, as well as the current construction of an underpass repair

KT66 and Gustav Tiituntien roundabout and subways

Lapuan kaupunki | Published March 6, 2017
cpvs

Merry and subways, as well as the current construction of an underpass repair traffic circle and subways, as well as the current construction of an underpass repair

Alanko tube - and management arrangements

Lapuan kaupunki | Published January 2, 2017  -  Deadline January 11, 2017
cpvs

Construction of a new hulevesiilinja and transferred to the water and sewer pipes. Construction of a new hulevesiilinja and transferred to the water and sewer pipes.

Aggregates Shipping for 2017-2019

Lapuan kaupunki | Published December 16, 2016  -  Deadline December 28, 2016
cpvs
44113000

aggregates for use in the construction of municipal infrastructure delivery. aggregates for use in the construction of municipal infrastructure delivery.

Nautakasvattamo

Jaakko Leikkola | Published November 13, 2015  -  Deadline November 30, 2015
cpvs
45000000, 16630000

Construction of cattle breeding manure storages and silo 336 cattle. In connection with the construction is also related to the acquisition Feeder.

Aggregates Contract

Lapuan kaupunki | Published December 15, 2016  -  Deadline January 31, 2017
cpvs
44113000

construction of municipal kätyettävien delivery of aggregates see. invitation to tender. construction of municipal kätyettävien aggregates supply Variants will be accepted (alternative tenders): yes

Lapuanjoki secondary new construction and renovation of partial Center Sedu building C (RU, PU, ​​AU and IU + SU)

Lapuan kaupunki, tekninen keskus | Published June 14, 2017  -  Deadline July 7, 2017
cpvs
45000000

Requirements for documents relating to the acquisition in accordance with the specified

Lapuanjoki secondary new construction and renovation of partial Center Sedu building C (RU, PU, ​​IU, AU, SU)

Lapuan kaupunki, tekninen keskus | Published May 5, 2017
cpvs
45000000

List of selection criteria and their short-list of selection criteria and their short-Acquisition Agreement on Government Procurement shall apply: yes

Kesketysilmoitus Aggregates Shipping for 2017-2019

Lapuan kaupunki | Published December 20, 2016  -  Deadline December 28, 2016
cpvs
44113000

EU-wide procurement, declaration number 2016-029508, replaces this acquisition. aggregates for use in the construction of municipal infrastructure delivery. EU-wide procurement, declaration number 2016-029508, replaces this acquisition. aggregates for use in the construction of municipal infrastructure delivery.

Nurmon River pedestrian bridge

Lapuan kaupunki | Published October 7, 2015  -  Deadline November 5, 2015
cpvs
45000000

Nurmon River pedestrian bridge and includes the construction of pedestrian and bicycle road links to the Lapua city. The contract includes all the work and procurement to complete the bridge in accordance with the plans.

Nurmo River pedestrian and bicycle bridge

Lapuan kaupunki | Published January 5, 2015  -  Deadline January 20, 2015
cpvs
71000000

Nurmo Bridge over the river about 35 m long pedestrian and bicycle bridge benefit of a width of 3.0 -3.5 m. The bridge can be either wood or steel construction. Ground surveys are included in the offer.

The latest Lapua junior high windows

Lapuan kaupunki | Published June 13, 2016  -  Deadline July 11, 2016
cpvs
44221100

the old part of the Lapua secondary school (os. Koulukatu 4, 62100 LAPUA) the renewal of the windows is reserved for the 2016 budget appropriations. Due to the scale and timing of invitation to tender for the delay this year is to be the new primary school Koulukatu side yard bordering facades windows (see. Appendix). The old part of the rest of the windows will be repeated in 2017, when the city council to grant the appropriation. Lapua City Technical Centre (subscriber) to ask the total price for the renewal of a quotation Lapua junior high wood-aluminum windows; Option 1) Koulukatu side yard bordering the facades of windows for which the installation date of summer / autumn 2016. Option 2), junior high, after all of the old part of windows for which the installation date of June 2017, provided that the appropriations are granted. Tenders may be submitted both options, or only 1 option. Purchasing will take a package contract, the so-called. "Turnkey" basis, elected in a cross from the provider is operating the project construction and general contractor.

Ward patient call system, Lapua Health Centre

Lapuan kaupunki | Published December 7, 2015  -  Deadline January 21, 2016
cpvs
48800000, 35120000

Lapua health center ward of nursing department has moved to a new service housing unit at the beginning of August 2015. Health Centre Hospital Department will be offering a brief treated before it needs to be renovating the rooms on two floors autumn 2015 - spring 2016 during the period. Sleeps department will be approx. 38 pieces, and the patient rooms 23 pcs. The project covers an automatic fire-extinguishing system, the cooling air ventilation, as well as installing a new patient messaging system. In addition, make subtle changes in the room, as well as floor and wall surfaces of the restoration. Lapua City Technical Centre (subscriber) to request the total price for the renewal of a quotation Lapua health center ward patient call system in accordance with the accompanying documents. The repurchases will be page-build contract, the customer is operating the project construction and the general contractor. Required by the system cabling is implemented in accordance with the accompanying diagrams, ready to go. The system is wired to Cat6 / siam cables patient and not call, corridor, as well as displays and I / O units. I / O units ahead cabling is Cat6 / siam cable tow rope switches, reset devices, huonemerkkilampuille and door magnetic or micro switches. The customer acquires a crossover rack and Cat6 cabling, as well as -rasioinnin ready to wait for a future patient messaging system.
  • 1