Public tenders for construction in Lappeenranta Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

HOWTO the deployment inspection services

Liikennevirasto | Published May 25, 2018  -  Deadline June 28, 2018
cpvs
71630000

Requirements as specified in the Procurement Documentation The remote control system of South East Finland is used to control the operating environment that is limited to the interfaces of the switchgears of these traffic places: - Riihimäki - Kytömaa - Pieksämäki - Kallislahti - Onttola - Kontiolahti More detailed description of the environment and the technical requirements of the inspection are set out in the specifications of the invitation to tender - 7.3). The remote control system is implemented in several stages (2018-2022). The object of the acquisition is the deployment inspection services of the South-East Finland Remote Control System (KAKO). The Remote Control System will be implemented in several phases, starting from 2018. This assignment will be piloted in the publication "Guidance on design, construction and repair of safety equipment" in the appendix to the call for proposals. The above-mentioned publication has been applied to the skills and qualifications requirements of the persons required for the job. CriteriaPressure: Quality Criteria (if best price / quality ratio is used): Price100 Price 100 Requirements as specified in the procurement documents

Lappeenranta Housing Service Ltd / Tyysterniementie 19, New Building, Electricity Works

Lappeenrannan Asuntopalvelu Oy | Published May 4, 2018  -  Deadline June 7, 2018
cpvs
45000000

Requirements as set out in the procurement documents Tyysterniementie 19 is a new building site for electrical works. The object will be 56 apartments with a total living area of ​​1458.5 + 1361.0 = 2819.5 m2. The estimated start date for construction is October 2018 and the duration of the work is 18 months. The construction contractor is the main contractor of the project (main contractor). LVIA and electrical works are subject to subcontracting. The project includes the construction of two five-storey one-staged residential blocks of Lappeenranta Housing Services Ltd with its area of ​​land in Tyysterniemi district of Lappeenranta, at Tyysternimentie 19. The common spaces located on the ground floor of the houses. There will be a total of 56 apartments, with a total living area of ​​1458.5 + 1361.0 = 2819.5 m2. Estimated start date for construction October 2018 and work duration is 18 months. The construction contractor is the main contractor of the project (main contractor). LVIA and electrical works are subject to subcontracting. Requirements as specified in the procurement documents

Lappeenranta Housing Service Ltd / Tyysterniementie 19, new building, LVIA contract

Lappeenrannan Asuntopalvelu Oy | Published May 4, 2018  -  Deadline June 7, 2018
cpvs
45000000

Requirements as specified in the procurement documents Tyysterniementie 19 LVIA contract for a new suburban property. The object will be 56 apartments with a total living area of ​​1458.5 + 1361.0 = 2819.5 m2. The estimated start date for construction is October 2018 and the duration of the work is 18 months. The construction contractor is the main contractor of the project (main contractor). LVIA and electrical works are subject to subcontracting. The project includes the construction of two five-storey one-staged residential blocks of Lappeenranta Housing Services Ltd with its area of ​​land in Tyysterniemi district of Lappeenranta, at Tyysternimentie 19. The common spaces located on the ground floor of the houses. There will be a total of 56 apartments, with a total living area of ​​1458.5 + 1361.0 = 2819.5 m2. Estimated start date for construction October 2018 and work duration is 18 months. The construction contractor is the main contractor of the project (main contractor). LVIA and electrical works are subject to subcontracting. Requirements as specified in the procurement documents

Lappeenranta Housing Service Ltd / Tyysterniementie 19, New Building, Construction Works

Lappeenrannan Asuntopalvelu Oy | Published May 4, 2018  -  Deadline June 7, 2018
cpvs
45000000

Requirements as specified in the procurement documents Tyysterniementie 19 works for a newer site. The object will be 56 apartments with a total living area of ​​1458.5 + 1361.0 = 2819.5 m2. The estimated start date for construction is October 2018 and the duration of the work is 18 months. The construction contractor is the main contractor of the project (main contractor). LVIA and electrical works are subject to subcontracting. The project includes the construction of two five-storey one-staged residential blocks of Lappeenranta Housing Services Ltd with its area of ​​land in Tyysterniemi district of Lappeenranta, at Tyysternimentie 19. The common spaces located on the ground floor of the houses. There will be a total of 56 apartments, with a total living area of ​​1458.5 + 1361.0 = 2819.5 m2. Estimated start date for construction October 2018 and work duration is 18 months. The construction contractor is the main contractor of the project (main contractor). LVIA and electrical works are subject to subcontracting. Requirements as specified in the procurement documents

Works outside the Skinnarila School's sports hall and kindergarten, works (main contract)

Lappeenrannan Kuntakiinteistöt Oy | Published March 12, 2018  -  Deadline April 6, 2018
cpvs
45000000

The construction project covers the building work of the Skinnarila School of the City of Lappeenranta and the work of the day care center (main contract) in accordance with the tender dossier. The construction project covers the building work of the Skinnarila School of the City of Lappeenranta and the work of the day care center (main contract) in accordance with the tender dossier.

Construction of the Imatra Mountains between Mäkikatu - Ainonkatu

Lappeenrannan kaupunki, elinvoiman ja kaupunkikehityken toimiala | Published March 7, 2018  -  Deadline March 22, 2018
cpvs
45200000

Lappeenranta City will ask you to offer the street and water supply at Imatranti in Lappeenranta Kimpinen district between Mäkikatu - Ainonkatu in accordance with the tender dossier with the attached application form. The contractor selected for work will act as the main actor in YSE 1998, with responsibilities and responsibilities. The content of the construction work is described in more detail in the tender documents / appendices annexed to the call for tenders. Lappeenranta City will ask you to offer the street and water supply at Imatranti in Lappeenranta Kimpinen district between Mäkikatu - Ainonkatu in accordance with the tender dossier with the attached application form. The contractor selected for work will act as the main actor in YSE 1998, with responsibilities and responsibilities. The content of the construction work is described in more detail in the tender documents / appendices annexed to the call for tenders.

Small earthworks

Lappeenrannan kaupunki Elinvoima ja kaupunkikehitys toimiala | Published February 19, 2018  -  Deadline March 12, 2018
cpvs
45200000

The price of the offer must be given in the attached application forms: Appendix 1 Small construction work The unit prices must include the necessary equipment (eg measuring instruments, hand tools, sealing equipment, etc.) Participants - Lappeenranta City Consortium of Lappeenranta City Life Exercise and City Development and Lappeenrannan Energia Oy The price of the offer must be given in the attached application forms: Appendix 1 Small construction work The unit prices must include the necessary equipment (eg measuring instruments, hand tools, sealing equipment, etc.) Participants - Lappeenranta City Consortium of Lappeenranta City Life Exercise and City Development and Lappeenrannan Energia Oy

Electric Works / Renovation of Tourism, Catering, Economics and Food Facilities

Etelä-Karjalan koulutuskuntayhtymä | Published December 14, 2017  -  Deadline December 20, 2017
cpvs
45311200

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Ventilation works / Renovation of tourism, catering, and the food industry

Etelä-Karjalan koulutuskuntayhtymä | Published December 14, 2017  -  Deadline December 20, 2017
cpvs
45331200

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Plumbing / Renovation of tourism, catering, and the food industry

Etelä-Karjalan koulutuskuntayhtymä | Published December 14, 2017  -  Deadline December 20, 2017
cpvs
45330000

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Construction engineering / Modernization of teaching facilities in tourism, catering and the economy and food industry

Etelä-Karjalan koulutuskuntayhtymä | Published December 14, 2017  -  Deadline December 20, 2017
cpvs
45000000

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Electric Works / Renovation of Tourism, Catering, Economics and Food Facilities

Etelä-Karjalan koulutuskuntayhtymä | Published November 20, 2017  -  Deadline December 18, 2017
cpvs
45311200

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Plumbing / Renovation of tourism, catering, and the food industry

Etelä-Karjalan koulutuskuntayhtymä | Published November 20, 2017  -  Deadline December 18, 2017
cpvs
45330000

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Ventilation works / Renovation of tourism, catering, and the food industry

Etelä-Karjalan koulutuskuntayhtymä | Published November 20, 2017  -  Deadline December 18, 2017
cpvs
45331200

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Construction engineering / Modernization of teaching facilities in tourism, catering and the economy and food industry

Etelä-Karjalan koulutuskuntayhtymä | Published November 20, 2017  -  Deadline December 18, 2017
cpvs
45000000

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (cladding with equipment, stairwell and loading gantry with equipment and storage) - internal complementary building partitions (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Exodus D1 wing modification works building automation

Etelä-Karjalan sosiaali- ja terveydenhuollon kuntayhtymä | Published November 16, 2017  -  Deadline December 15, 2017
cpvs
45000000

The call for tenders is a construction automation contract for the modification works of the D1 wing of the South Karelia Central Hospital, as described in the tender dossier. The contract form of the project is a shared contract where the building automation contractor acts as a subcontracted contractor for the project. The project includes all the work presented in the plans and the tender documents completed completely. The call for tenders is a construction automation contract for the modification works of the D1 wing of the South Karelia Central Hospital, as described in the tender dossier. The contract form of the project is a shared contract where the building automation contractor acts as a subcontracted contractor for the project. The project includes all the work presented in the plans and the tender documents completed completely.

Construction and main contract for the alteration of Exoten D1 wing

Etelä-Karjalan sosiaali- ja terveydenhuollon kuntayhtymä | Published November 16, 2017  -  Deadline December 15, 2017
cpvs
45000000

The call for tenders is the construction and main works of the transformations of the D1 wing of South Karelia Central Hospital, as described in the tender dossier. The contract form of the project is a shared contract where the contractor acts as the main contractor of the project and the other contractors are subcontracted as side-contractors. The project includes all the work presented in the plans and the tender documents completed completely. The call for tenders is the construction and main works of the transformations of the D1 wing of South Karelia Central Hospital, as described in the tender dossier. The contract form of the project is a shared contract where the contractor acts as the main contractor of the project and the other contractors are subcontracted as side-contractors. The project includes all the work presented in the plans and the tender documents completed completely.

Renovation of office building, construction work

Lappeenrannan seurakuntayhtymä | Published November 2, 2017  -  Deadline November 27, 2017
cpvs
45000000

The project includes a renovation of 1914 completed office buildings, alterations in the extension of the IV engine room and the resulting water tower, exterior plaster repairs and natural stone cleaning of the facade of the facade and sealing, dismantling and rebuilding of the underlying floor and floor floors, coatings (floors, walls), renovation of lightweight partitions, , removal of contaminants The project includes a renovation of 1914 completed office buildings, the work includes, among others, alterations in the extension of the IV engine room and the resulting water tower, exterior plaster repairs and natural stone cleaning of the facade of the facade and sealing, dismantling and rebuilding of the underlying floor and floor floors, coatings (floors, walls), renovation of lightweight partitions, , the removal of contaminants

The South Karelian Educational Community Consortium asks for your offer of construction tasks, construction work site

Etelä-Karjalan koulutuskuntayhtymä | Published December 12, 2017  -  Deadline November 24, 2017
cpvs

The South Karelian Educational Community Consortium asks for your offer of construction tasks, the tasks of construction site supervision, and the tasks of the safety officer. The construction project includes a more detailed part of the teaching building's kitchen and suitcase facilities at the following address: Pohjolankatu 12, 53100 LAPPEENRANTA. The arch-floor plans and the building report are enclosed with the invitation to tender. The tasks of the Building Consultant include the items I (3-6), J5 and K1 to be ordered separately from HJR12 (RT 10-11107) for task management and construction work (RT 10-11107): to arrange 2-year warranty audits with preparatory work, meetings and ex-post audits. In addition, the tasks include participation in the report and contract negotiations (H 4.3 RR) and the drafting of the moisture management plan for the project. Tasks for site monitoring include the tasks assigned to the work site monitoring task list RT 16-11121 for building construction work, including task 2.12. The builder consultant must ensure that designers and contractors document their donation material to the local authority in the electronic service book. The tasks of the builder consultant begin immediately after the end of the consultancy and the appeal period. The project will start on November 17, 2017, and the contracting contract will be made at the meeting of the joint municipal board in January. The contract begins after the January Board meeting and the appeal period expires in January-February. The premises must be ready 31.12.2018 For further information, please contact the property manager Pauli Lipponen, tel. +358 400 750 714.

Repairs to the stone facade façades of the buildings of the Lappeenranta Fortress

Lappeenrannan Kuntakiinteistöt Oy | Published October 18, 2017  -  Deadline November 20, 2017
cpvs
45000000

The construction project covers the plastering and painting repairs of the stone facades of the protected buildings of the Lappeenranta Fortress as planned. The project includes the following buildings: - Cavalry Museum, - Building 19, - South Karelian Art Museum, buildings 23 and 24, - City Archives, Building 1b, - South Karelian Museum, buildings 27 and 28, - Käräjtalo. The construction project covers the plastering and painting repairs of the stone facades of the protected buildings of the Lappeenranta Fortress as planned. The project includes the following buildings: - Cavalry Museum, - Building 19, - South Karelian Art Museum, buildings 23 and 24, - City Archives, Building 1b, - South Karelian Museum, buildings 27 and 28, - Käräjtalo.