Electric Works / Renovation of Tourism, Catering, Economics and Food Facilities

Etelä-Karjalan koulutuskuntayhtymä | Published December 14, 2017  -  Deadline December 20, 2017
cpvs
45311200

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Ventilation works / Renovation of tourism, catering, and the food industry

Etelä-Karjalan koulutuskuntayhtymä | Published December 14, 2017  -  Deadline December 20, 2017
cpvs
45331200

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Plumbing / Renovation of tourism, catering, and the food industry

Etelä-Karjalan koulutuskuntayhtymä | Published December 14, 2017  -  Deadline December 20, 2017
cpvs
45330000

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Construction engineering / Modernization of teaching facilities in tourism, catering and the economy and food industry

Etelä-Karjalan koulutuskuntayhtymä | Published December 14, 2017  -  Deadline December 20, 2017
cpvs
45000000

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Electric Works / Renovation of Tourism, Catering, Economics and Food Facilities

Etelä-Karjalan koulutuskuntayhtymä | Published November 20, 2017  -  Deadline December 18, 2017
cpvs
45311200

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Plumbing / Renovation of tourism, catering, and the food industry

Etelä-Karjalan koulutuskuntayhtymä | Published November 20, 2017  -  Deadline December 18, 2017
cpvs
45330000

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Ventilation works / Renovation of tourism, catering, and the food industry

Etelä-Karjalan koulutuskuntayhtymä | Published November 20, 2017  -  Deadline December 18, 2017
cpvs
45331200

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Construction engineering / Modernization of teaching facilities in tourism, catering and the economy and food industry

Etelä-Karjalan koulutuskuntayhtymä | Published November 20, 2017  -  Deadline December 18, 2017
cpvs
45000000

The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (cladding with equipment, stairwell and loading gantry with equipment and storage) - internal complementary building partitions (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall. The premises were originally completed in 1958 and renovated in 1986. The renovation works mainly carry out internal renovation and renovation work, (including windows renovation and new US structures and ceilings) - demolition of the old roofing room and construction of new roofing rooms with roof tiles - new exterior structures (roofs with appliances, stairwell and loading gantry with equipment and warehouses) - internal complementary building blocks (partition walls , doors, fixtures, fittings, etc.) demolitions - floor demolition and surface demolition - renovation of exterior and interior doors - renovation of wall coatings and coatings - replacement of roof tiles - floor surfaces and coatings The meeting place is Pohjolankatu 12, main hall.

Exodus D1 wing modification works building automation

Etelä-Karjalan sosiaali- ja terveydenhuollon kuntayhtymä | Published November 16, 2017  -  Deadline December 15, 2017
cpvs
45000000

The call for tenders is a construction automation contract for the modification works of the D1 wing of the South Karelia Central Hospital, as described in the tender dossier. The contract form of the project is a shared contract where the building automation contractor acts as a subcontracted contractor for the project. The project includes all the work presented in the plans and the tender documents completed completely. The call for tenders is a construction automation contract for the modification works of the D1 wing of the South Karelia Central Hospital, as described in the tender dossier. The contract form of the project is a shared contract where the building automation contractor acts as a subcontracted contractor for the project. The project includes all the work presented in the plans and the tender documents completed completely.

Construction and main contract for the alteration of Exoten D1 wing

Etelä-Karjalan sosiaali- ja terveydenhuollon kuntayhtymä | Published November 16, 2017  -  Deadline December 15, 2017
cpvs
45000000

The call for tenders is the construction and main works of the transformations of the D1 wing of South Karelia Central Hospital, as described in the tender dossier. The contract form of the project is a shared contract where the contractor acts as the main contractor of the project and the other contractors are subcontracted as side-contractors. The project includes all the work presented in the plans and the tender documents completed completely. The call for tenders is the construction and main works of the transformations of the D1 wing of South Karelia Central Hospital, as described in the tender dossier. The contract form of the project is a shared contract where the contractor acts as the main contractor of the project and the other contractors are subcontracted as side-contractors. The project includes all the work presented in the plans and the tender documents completed completely.

Renovation of office building, construction work

Lappeenrannan seurakuntayhtymä | Published November 2, 2017  -  Deadline November 27, 2017
cpvs
45000000

The project includes a renovation of 1914 completed office buildings, alterations in the extension of the IV engine room and the resulting water tower, exterior plaster repairs and natural stone cleaning of the facade of the facade and sealing, dismantling and rebuilding of the underlying floor and floor floors, coatings (floors, walls), renovation of lightweight partitions, , removal of contaminants The project includes a renovation of 1914 completed office buildings, the work includes, among others, alterations in the extension of the IV engine room and the resulting water tower, exterior plaster repairs and natural stone cleaning of the facade of the facade and sealing, dismantling and rebuilding of the underlying floor and floor floors, coatings (floors, walls), renovation of lightweight partitions, , the removal of contaminants

The South Karelian Educational Community Consortium asks for your offer of construction tasks, construction work site

Etelä-Karjalan koulutuskuntayhtymä | Published December 12, 2017  -  Deadline November 24, 2017
cpvs

The South Karelian Educational Community Consortium asks for your offer of construction tasks, the tasks of construction site supervision, and the tasks of the safety officer. The construction project includes a more detailed part of the teaching building's kitchen and suitcase facilities at the following address: Pohjolankatu 12, 53100 LAPPEENRANTA. The arch-floor plans and the building report are enclosed with the invitation to tender. The tasks of the Building Consultant include the items I (3-6), J5 and K1 to be ordered separately from HJR12 (RT 10-11107) for task management and construction work (RT 10-11107): to arrange 2-year warranty audits with preparatory work, meetings and ex-post audits. In addition, the tasks include participation in the report and contract negotiations (H 4.3 RR) and the drafting of the moisture management plan for the project. Tasks for site monitoring include the tasks assigned to the work site monitoring task list RT 16-11121 for building construction work, including task 2.12. The builder consultant must ensure that designers and contractors document their donation material to the local authority in the electronic service book. The tasks of the builder consultant begin immediately after the end of the consultancy and the appeal period. The project will start on November 17, 2017, and the contracting contract will be made at the meeting of the joint municipal board in January. The contract begins after the January Board meeting and the appeal period expires in January-February. The premises must be ready 31.12.2018 For further information, please contact the property manager Pauli Lipponen, tel. +358 400 750 714.

Repairs to the stone facade façades of the buildings of the Lappeenranta Fortress

Lappeenrannan Kuntakiinteistöt Oy | Published October 18, 2017  -  Deadline November 20, 2017
cpvs
45000000

The construction project covers the plastering and painting repairs of the stone facades of the protected buildings of the Lappeenranta Fortress as planned. The project includes the following buildings: - Cavalry Museum, - Building 19, - South Karelian Art Museum, buildings 23 and 24, - City Archives, Building 1b, - South Karelian Museum, buildings 27 and 28, - Käräjtalo. The construction project covers the plastering and painting repairs of the stone facades of the protected buildings of the Lappeenranta Fortress as planned. The project includes the following buildings: - Cavalry Museum, - Building 19, - South Karelian Art Museum, buildings 23 and 24, - City Archives, Building 1b, - South Karelian Museum, buildings 27 and 28, - Käräjtalo.

Architectural, construction, engineering and inspection services

Lappeenrannan kaupunki / Lappeenrannan Kuntakiinteistöt Oy | Published October 12, 2017  -  Deadline October 23, 2017
cpvs
71000000, 71300000

The City of Lappeenranta will renovate and expand Kesemae's one-off primary school. This call for tenders concerns the design of the repair and extension.

In addition to the functionality of the premises, special attention is paid to the project at the design stage to create sound and safe premises.

Architectural, construction, engineering and inspection services

Lappeenrannan kaupunki / Lappeenrannan Kuntakiinteistöt Oy | Published September 22, 2017  -  Deadline October 23, 2017
cpvs
71000000, 71300000

The City of Lappeenranta will renovate and expand Kesemae's one-off primary school. This call for tenders concerns the design of the repair and extension.

In addition to the functionality of the premises, special attention is paid to the project at the design stage to create sound and safe premises.

The design task is described in the invitation to tender and its accompanying documents.

Construction and main work of the waste and laundry building

Etelä-Karjalan sosiaali- ja terveydenhuollon kuntayhtymä | Published September 15, 2017  -  Deadline October 9, 2017
cpvs
45000000

The call for tenders is the construction of a new waste and laundry building in South Karelia Central Hospital, as described in the tender dossier and as a main contractor for the construction site. The contract form of the project is a shared contract in which the contractor is the main contractor of the project. The project includes all the work presented in the plans and the tender documents completed completely. The call for tenders is the construction of a new waste and laundry building in South Karelia Central Hospital, as described in the tender dossier and as a main contractor for the construction site. The contract form of the project is a shared contract in which the contractor is the main contractor of the project. The project includes all the work presented in the plans and the tender documents completed completely.

Ventilation of the archives of the Käräjäalo archive

Lappeenrannan Kuntakiinteistöt Oy | Published September 13, 2017  -  Deadline September 28, 2017
cpvs
45000000

The construction project covers the renovation of the ventilation of Lappeenranta City's Käräjätalo archive in accordance with the tender dossier. Contract deals are requested as follows: - works (main contractor / main contractor), - plumbing work, - electrical works. The construction project covers the renovation of the ventilation of Lappeenranta City's Käräjätalo archive in accordance with the tender dossier. Contract deals are requested as follows: - works (main contractor / main contractor), - plumbing work, - electrical works.

Field manager garage

Etelä-Karjalan sosiaali- ja terveydenhuollon kuntayhtymä | Published September 1, 2017  -  Deadline September 22, 2017
cpvs
45000000

The call for tenders is the construction of a new field manager of the South Karelian Central Hospital as shown in the tender dossier. The contract form of the project is a total contract. The project includes all the work presented in the plans and the tender documents completed completely. The contract includes the construction of a field manager garage with all the work and the supplies as fully completed in the tender dossier. The contract includes the design and implementation of steel structures and elemental structures with all their work and costs. The call for tenders is the construction of a new field manager of the South Karelian Central Hospital as shown in the tender dossier. The contract form of the project is a total contract. The project includes all the work presented in the plans and the tender documents completed completely. The contract includes the construction of a field manager garage with all the work and the supplies as fully completed in the tender dossier. The contract includes the design and implementation of steel structures and elemental structures with all their work and costs.

Korvenkylä-Peace region for winter maintenance contract 2017-2020 (+ Option 1 year).

Lappeenrannan kaupunki, elinvoiman ja kaupunkikehityken toimiala | Published June 27, 2017  -  Deadline August 4, 2017
cpvs
90620000

the implementation of the Agreement the names of members of the staff and the obligation to indicate the professional qualifications of Lappeenranta Korvenkylä-winter maintenance contract Peace region, winter maintenance periods 2017-2018, 2018-2019 and 2019-2020 (3 yrs.). The contract includes an option winter maintenance period 2020-2021 (1y.). The contract includes mm. Marked työkohdeluetteloon and työaluekarttaan / maps of streets and roads, and others. plowing width to full buses, bus shelters, sidewalks and bicycle paths, as well as sanding, if necessary, in accordance with pedestrian and bicycle paths sanding the client's instructions. Construction, its extent, and the minimum conditions are described in detail in the specifications. Lappeenranta Korvenkylä-Peace region, winter maintenance contract. The contract is subject to the town of Lappeenranta Korvenkylä Peace-area roads, streets, etc. routes winter maintenance work, details of the contract areas. The subject of the contract areas and work sites shown in tender documents työaluekartoissa and object lists. Variants will be accepted (Alternative offers): no requirements in the contract documents determined in accordance with the implementation of the Agreement the names of members of the staff and the obligation to indicate the professional qualifications

Eastern winter maintenance contract for the period 2017-2020 (+ Option 1 year).

Lappeenrannan kaupunki, elinvoiman ja kaupunkikehityken toimiala | Published June 27, 2017  -  Deadline August 4, 2017
cpvs
90620000

the implementation of the Agreement the names of members of the staff and the obligation to indicate the professional qualifications of Lappeenranta Eastern winter maintenance contract winter maintenance periods 2017-2018, 2018-2019 and 2019-2020 (3 yrs.). The contract includes an option winter maintenance period 2020-2021 (1y.). The contract includes mm. Marked työkohdeluetteloon and työaluekarttaan / maps of streets and roads, and others. plowing width to full buses, bus shelters, sidewalks and bicycle paths, as well as sanding, if necessary, in accordance with pedestrian and bicycle paths sanding the client's instructions. Construction, its extent, and the minimum conditions are described in detail in the specifications. Lappeenranta Eastern winter maintenance contract. The contract is subject to the town of Lappeenranta Eastern roads, streets, etc. routes winter maintenance work, details of the contract areas. The subject of the contract areas and work sites shown in tender documents työaluekartoissa and object lists. Variants will be accepted (Alternative offers): no requirements in the contract documents determined in accordance with the implementation of the Agreement the names of members of the staff and the obligation to indicate the professional qualifications