Call +44 800 9755 164

Public tenders for construction in Lappeenranta Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Architectural, construction, engineering and inspection services

Etelä-Karjalan sosiaali – ja terveydenhuollon kuntayhtymä | Published January 25, 2017  -  Deadline February 24, 2017
cpvs
71000000

in the invitation to tender is a modification of the construction of the South Karelia Central Hospital K-making position in the hospital and in more detail in dialysis water system and D1-wing change and

in the invitation to tender is a modification of the construction of the South Karelia Central Hospital K-making position in the hospital and in more detail in dialysis water system and D1-wing modifications and repairs ARK- and principal.

Dialysis, the water system will be built to include power monitoring and power department, as well as D1-wing spaces in the contract documents indicated below. D1-wing modification and repair work, an area of ​​about 1 425 + 575 htm² htm². Site address is Valto Käkelän Street 1, FI-53130 Lappeenranta.

The design phase to begin exploring the possibility of rendering and energy-efficient new ventilation system under the project hospital indoor air quality standards. As part of the offer given the cost The modestly in the bid for this work entity by using a potential compensation price is determined, if the ventilation system is not in connection with a project to design and implement.

Link to the tender documents can be found in the tender documents.

Architectural, construction, engineering and inspection services

Etelä-Karjalan sosiaali- ja terveydenhuollon kuntayhtymä | Published January 19, 2017  -  Deadline February 24, 2017
cpvs
71000000

in the invitation to tender is a modification of the construction of the South Karelia Central Hospital K-making position in the hospital and in more detail in dialysis water system and D1-wing modifications and repairs ARK- and principal.

Site address is Valto Käkelän Street 1, FI-53130 Lappeenranta.

As part of the offer given the cost The modestly in the bid for this work entity by using a potential compensation price is determined, if the ventilation system is not in connection with a project to design and implement.

Link to the tender documents can be found in the tender documents.

in the invitation to tender is a modification of the construction of the South Karelia Central Hospital K-making position in the hospital and in more detail in dialysis water system and D1-wing modifications and repairs ARK- and principal.

Site address is Valto Käkelän Street 1, FI-53130 Lappeenranta.

As part of the offer given the cost The modestly in the bid for this work entity by using a potential compensation price is determined, if the ventilation system is not in connection with a project to design and implement.

Link to the tender documents can be found in the tender documents.

Username is: dialyysiD1.

The password is: Eksote2017.

Tenders shall be submitted electronically to: tekniset@eksote.fi

E-mail subject field will write the change Dialyysiveden and D1-wing ARK design.

Architectural, construction, engineering and inspection services

Lappeenrannan kaupunki Tilakeskus | Published February 1, 2017  -  Deadline March 1, 2017
cpvs
71000000

This acquisition aims to create a city for itemized for the building AND CONSULTING framework agreement related to repairs, which can be used during the contract period to buy a high-quality and cost-effective structural design expert services to the needs of subscribers.

As a result, the tenderer must undertake to carry out any orders subscriber reporting schedule, which requires a provider of a short response time.

A more detailed description and requirements are described in the tender points Description sourcing and procurement background.

All of Lappeenranta kaupunkinkonsernin units, as well as the city's majority share owned by Saimaa Support Services Ltd has the right but not the obligation to award contracts on the basis of the same agreement.

The client undertakes no obligation to purchase certain amounts.

In addition, the subscriber reserves the right to carry out the major design targets a distinct urakkatarjous- or design contests through.

Responsibility Coordinator designated should be at least 5 years of experience in engineering and project management.

Provider contract contact person responsible for the organization, operation and management of resources consultant cooperation framework agreement, as well as the representative of the tendering company operates a contact person in matters related to the framework agreement.

Contract includes tailor-mm. assessments required by the task, the design of tasks, communication design in terms of appropriate authorities, any licensing preparations, during the construction of consultations, the reception phase of tasks as well as any other tasks ordered by the subscriber.

The response time of the mandate of the receipt / opening of work and from the work site / customer's office is 1 day at the invitation of the subscriber (weekdays during office hours).

The consultant must be approved by the subscriber to be followed in the project commissioned plans, specification and guidelines, or the like.

Drawing and service instructions can be found in the town of Lappeenranta's website www.lappeenranta.fi (Construction and land development - Health Centre).

of the content of design services is determined by the individual orders in the order.

Structural Design Tasks include, for example, all the usual related to the project of building construction or repair of the planning tasks and structure of the design task list RAK12 (RT 10-11128), the main design task list PS 12 in accordance with the structural design tasks.

Architectural, construction, engineering and inspection services

Lappeenrannan kaupunki Tilakeskus | Published January 25, 2017  -  Deadline February 22, 2017
cpvs
71000000

This acquisition aims to create a city for itemized for the building AND CONSULTING framework agreement related to repairs, which can be used during the contract period to buy a high-quality and cost-effective electricity, security systems and audio-visual systems design expert services to the needs of subscribers.

As a result, the tenderer must undertake to carry out any orders subscriber reporting schedule, which requires a provider of a short response time.

A more detailed description and requirements are described in the tender points Description sourcing and procurement background.

All of Lappeenranta kaupunkinkonsernin units, as well as the city's majority share owned by Saimaa Support Services Ltd has the right but not the obligation to award contracts on the basis of the same agreement.

The client undertakes no obligation to purchase certain amounts.

In addition, the subscriber reserves the right to carry out the major design targets a distinct urakkatarjous- or design contests through.

Responsibility Coordinator designated should be at least 5 years of experience in engineering and project management.

Provider contract contact person responsible for the organization, operation and management of resources consultant cooperation framework agreement, as well as the representative of the tendering company operates a contact person in matters related to the framework agreement.

Contract includes tailor-mm. assessments required by the task, the design of tasks, communication design in terms of appropriate authorities, any licensing preparations, during the construction of consultations, the reception phase of tasks as well as any other tasks ordered by the subscriber.

The response time of the mandate of the receipt / opening of work and from the work site / customer's office is 1 day at the invitation of the subscriber (weekdays during office hours).

The consultant must be approved by the subscriber to be followed in the project commissioned plans, specification and guidelines, or the like.

Drawing and service instructions can be found in the town of Lappeenranta's website www.lappeenranta.fi (Construction and land development - Health Centre).

of the content of design services is determined by the individual orders in the order.

1.1) Technical Building electrical design tasks include, for example, all the usual tasks of electrical engineering and electrical design tasks KH X4-00519 and Ratu RT 10-11129) in accordance with the technical design of the house in the task list (TATE12, RT 10-11129, related to building construction or repair project.

1.2) Planning for outdoor lighting.

Specification, bill of quantities and cost estimate includes the mandate, regardless of the extent of the object.

They are shown in yleissuunnitelmatasoisesti special lighting objects, lighting methods used and the environment, water and art subjects, or combinations of the above.

Lauritsala center of mass transit terminals, Step 1 Construction

Lappeenrannan kaupunki/ tekninen toimi | Published February 6, 2017  -  Deadline February 21, 2017
cpvs

City of Lappeenranta ask you to total an offer be located in Lappeenranta Lauritsala district station of the street construction following tender documents in accordance with the attached tender form. chosen to work the contractor is YSE 1998 under the main implementer responsibilities and obligations. The construction works comprise the construction in accordance with the Status of the street plans The Board of Directors of the street and Kuntokatu interface. Construction work carried out street area, where transport will be able to move, with the exception of possible small breaks, all the time. Kulkuhteydet properties will be maintained throughout the construction period, as well as the pedestrian street concerned. the content of the work is described in more detail in the attached invitation to tender tendering / planning documents. City of Lappeenranta ask you to total an offer be located in Lappeenranta Lauritsala district station of the street construction following tender documents in accordance with the attached tender form. chosen to work the contractor is YSE 1998 under the main implementer responsibilities and obligations. The construction works comprise the construction in accordance with the Status of the street plans The Board of Directors of the street and Kuntokatu interface. Construction work carried out street area, where transport will be able to move, with the exception of possible small breaks, all the time. Kulkuhteydet properties will be maintained throughout the construction period, as well as the pedestrian street concerned. the content of the work is described in more detail in the attached invitation to tender tendering / planning documents.

relating to the construction of K-hospital Alterations position in the hospital: the changes of dialysis water system and D1-wing ELECTRICAL ENGINEERING

Etelä-Karjalan sosiaali- ja terveydenhuollon kuntayhtymä | Published February 6, 2017  -  Deadline February 28, 2017
cpvs

in the invitation to tender is a modification of the construction of the South Karelia Central Hospital K-making position in the hospital and in more detail in dialysis water system and D1-wing modification and repair work on electrical engineering. Dialysis, the water system will be built to include power monitoring and power department, as well as D1-wing spaces in the contract documents indicated below. D1-wing modification and repair work, an area of ​​about 1425 htm². Site address is Valto Käkelän street 1, 53130 Lappeenranta. The design phase to begin exploring the possibility of rendering and energy-efficient new ventilation system under the project hospital indoor air quality requirements. As part of the offer given the cost The modestly in the bid for this work entity by using a potential compensation price is determined, if the ventilation system is not in connection with a project to design and implement. Link to the tender documents can be found in the tender documents the user is: dialysis D1 password is: Eksote2017 the subject of the invitation to tender is for the construction of South Karelia Central Hospital of K-Making alterations and further strain the hospital dialysis water system and D1-wing modification and repair work on electrical engineering. Dialysis, the water system will be built to include power monitoring and power department, as well as D1-wing spaces in the contract documents indicated below. D1-wing modification and repair work, an area of ​​about 1425 htm². Site address is Valto Käkelän street 1, 53130 Lappeenranta. The design phase to begin exploring the possibility of rendering and energy-efficient new ventilation system under the project hospital indoor air quality requirements. As part of the offer given the cost The modestly in the bid for this work entity by using a potential compensation price is determined, if the ventilation system is not in connection with a project to design and implement. Link to the tender documents can be found in the tender documents the user is: dialysis D1 password is: Eksote2017

relating to the construction of K-hospital Alterations position in the hospital: the changes of dialysis water system and D1-wing HVAC DESIGN

Etelä-Karjalan sosiaali- ja terveydenhuollon kuntayhtymä | Published February 6, 2017  -  Deadline February 28, 2017
cpvs

in the invitation to tender is a modification of the construction of the South Karelia Central Hospital K-making position in the hospital and in more detail in dialysis water system and D1-wing modification and repair HVAC design. Dialysis, the water system will be built to include power monitoring and power department, as well as D1-wing spaces in the contract documents indicated below. D1-wing modification and repair work, an area of ​​about 1 425 htm². Site address is Valto Käkelän street 1, 53130 Lappeenranta. The design phase to begin exploring the possibility of rendering and energy-efficient new ventilation system under the project hospital indoor air quality standards. As part of the offer given the cost The modestly in the bid for this work entity by using a potential compensation price is determined, if the ventilation system is not in connection with a project to design and implement. Link to the tender documents can be found in the tender documents. the username is: dialysis D1 password is: Eksote2017 the subject of the invitation to tender is for the construction of South Karelia Central Hospital of K-Making alterations and further strain the hospital dialysis water system and D1-wing modification and repair HVAC design. Dialysis, the water system will be built to include power monitoring and power department, as well as D1-wing spaces in the contract documents indicated below. D1-wing modification and repair work, an area of ​​about 1 425 htm². Site address is Valto Käkelän street 1, 53130 Lappeenranta. The design phase to begin exploring the possibility of rendering and energy-efficient new ventilation system under the project hospital indoor air quality standards. As part of the offer given the cost The modestly in the bid for this work entity by using a potential compensation price is determined, if the ventilation system is not in connection with a project to design and implement. Link to the tender documents can be found in the tender documents. the username is: dialysis D1 password is: Eksote2017

Health Care Federation of Municipalities of South Karelia social and related construction of the K-hospital alteration: Changes in dialysis, the water system and the D1-wing architect and principal

Etelä-Karjalan sosiaali - ja terveydenhuollon kuntayhtymä | Published January 20, 2017
cpvs
71000000

in the invitation to tender is a modification of the construction of the South Karelia Central Hospital K-making position in the hospital and in more detail in dialysis water system and D1-wing modifications and repairs ARK- and principal. Dialysis, the water system will be built to include power monitoring and power department, as well as D1-wing spaces in the contract documents indicated below. D1-wing modification and repair work, an area of ​​about 1425 HTM2 + 575 HTM2. Site address is Valto Käkelän street 1 53130 Lappeenranta. in the invitation to tender is a modification of the construction of the South Karelia Central Hospital K-making position in the hospital and in more detail in dialysis water system and D1-wing modifications and repairs ARK- and principal. Dialysis, the water system will be built to include power monitoring and power department, as well as D1-wing spaces in the contract documents indicated below. D1-wing modification and repair work, an area of ​​about 1425 HTM2 + 575 HTM2. Site address is Valto Käkelän street 1 53130 Lappeenranta.

relating to the construction of K-hospital Alterations position in the hospital: the changes of dialysis water system and D1-wing architect and principal

Etelä-Karjalan sosiaali- ja terveydenhuollon kuntayhtymä | Published January 18, 2017  -  Deadline February 24, 2017
cpvs
71000000

Tarjouspyynnön kohteena on Etelä-Karjalan keskussairaalan K-sairaalan rakentamiseen liittyvien muutostöiden tekeminen kantasairaalassa ja tarkemmin dialyysin vesijärjestelmän ja D1-siiven muutos- ja korjaustöiden ARK- JA pääsuunnittelu. Dialyysin vesijärjestelmä rakennetaan käsittämään tehovalvonnan ja teho-osaston sekä D1-siiven tilat tarjouspyyntöasiakirjoissa esitetyllä tavalla. D1-siiven muutos- ja korjaustöiden ala on noin 1 425 htm2 + 575 htm2. Rakennuspaikan osoite on Valto Käkelänkatu 1, 53130 Lappeenranta. Suunnitteluvaiheen aluksi tutkitaan mahdollisuus uusia hankkeen yhteydessä ilmanvaihtojärjestelmä sairaalan sisäilmalaatuvaatimukset takaavaksi ja energiatehokkaaksi. Osana tarjousta annetaan tarjoukseen sisältyvä osahinta tästä työkokonaisuudesta, jota käyttäen mahdollinen hyvityshinta määritellään, mikäli ilmanvaihtojärjestelmää ei hankkeen yhteydessä suunnitella ja toteuteta. Linkki tarjouspyyntöasiakirjoihin löytyy kohdasta tarjouspyyntöasiakirjat. Tarjouspyynnön kohteena on Etelä-Karjalan keskussairaalan K-sairaalan rakentamiseen liittyvien muutostöiden tekeminen kantasairaalassa ja tarkemmin dialyysin vesijärjestelmän ja D1-siiven muutos- ja korjaustöiden ARK- JA pääsuunnittelu. Dialyysin vesijärjestelmä rakennetaan käsittämään tehovalvonnan ja teho-osaston sekä D1-siiven tilat tarjouspyyntöasiakirjoissa esitetyllä tavalla. D1-siiven muutos- ja korjaustöiden ala on noin 1 425 htm2 + 575 htm2. Rakennuspaikan osoite on Valto Käkelänkatu 1, 53130 Lappeenranta. Suunnitteluvaiheen aluksi tutkitaan mahdollisuus uusia hankkeen yhteydessä ilmanvaihtojärjestelmä sairaalan sisäilmalaatuvaatimukset takaavaksi ja energiatehokkaaksi. Osana tarjousta annetaan tarjoukseen sisältyvä osahinta tästä työkokonaisuudesta, jota käyttäen mahdollinen hyvityshinta määritellään, mikäli ilmanvaihtojärjestelmää ei hankkeen yhteydessä suunnitella ja toteuteta. Linkki tarjouspyyntöasiakirjoihin löytyy kohdasta tarjouspyyntöasiakirjat. käyttäjätunnus on: dialyysiD1 salasana on: Eksote2017 Tarjoukset jätetään sähköisesti osoitteeseen tekniset@eksote.fi Sähköpostin aihekenttään tulee kirjoittaa Dialyysiveden ja D1-siiven muutos ARK suunnittelu Tarjouspyynnön kohteena on Etelä-Karjalan keskussairaalan K-sairaalan rakentamiseen liittyvien muutostöiden tekeminen kantasairaalassa ja tarkemmin dialyysin vesijärjestelmän ja D1-siiven muutos- ja korjaustöiden ARK- JA pääsuunnittelu. Dialyysin vesijärjestelmä rakennetaan käsittämään tehovalvonnan ja teho-osaston sekä D1-siiven tilat tarjouspyyntöasiakirjoissa esitetyllä tavalla. D1-siiven muutos- ja korjaustöiden ala on noin 1 425 htm2 + 575 htm2. Rakennuspaikan osoite on Valto Käkelänkatu 1, 53130 Lappeenranta. Suunnitteluvaiheen aluksi tutkitaan mahdollisuus uusia hankkeen yhteydessä ilmanvaihtojärjestelmä sairaalan sisäilmalaatuvaatimukset takaavaksi ja energiatehokkaaksi. Osana tarjousta annetaan tarjoukseen sisältyvä osahinta tästä työkokonaisuudesta, jota käyttäen mahdollinen hyvityshinta määritellään, mikäli ilmanvaihtojärjestelmää ei hankkeen yhteydessä suunnitella ja toteuteta. Linkki tarjouspyyntöasiakirjoihin löytyy kohdasta tarjouspyyntöasiakirjat.

Structural Engineering

Lappeenrannan kaupunki Tilakeskus | Published January 31, 2017  -  Deadline March 1, 2017
cpvs
71000000

A more accurate value excluding VAT: Range: 250000.00 EUR Variants will be accepted (alternative tenders): no

Structural design, Pohjolankatu 12 of Part A of Marata and renovation of Elt

Etelä-Karjalan koulutuskuntayhtymä | Published February 3, 2017  -  Deadline March 6, 2017
cpvs

Pyydämme rakennesuunnittelutarjoustanne Matkailu-, Ravitsemis- ja Talousalan sekä Elintarvikealan opetustilojen peruskorjauksesta. Suunnittelualueeseen kuuluu Pohjolankatu 12 A-osan 1. kerroksessa sijaitsevat opetuskeittiöt 1-4, leipomo ja kahvila Tuurimokka (n. 1000 m²) sekä kellarikerroksen varasto ja sosiaalitilat (n. 300 m²). Peruskorjauksessa on kiinnitettävä huomiota sisäilman laatuun. Ulkoseinien tiiviyteen ja alapohjan tiiveyteen on kiinnitettävä erityistä huomiota. Kantavat rakenteet rajoittavat tilojen layout-suunnitelman tekoa, koska niitä ei voitane poistaa. LVISA-tekniikka uusitaan kaikilta osin. IV-koneelle rakennetaan uusi konehuone osaston katolle. Sisäpihan puolelle suunnitellaan uudisrakennuksena yhdyskäytävä. Kahvila Tuurimokka siirretään nykyisen leipomon kohtaan. Suunnittelija velvoitetaan tutustumaan kohteeseen ennen tarjouksen antamista. Näyttöpäivä on pe 10.2.2017 klo 14.00, paikka Pohjolankatu 12 pääaula, tai sopimuksen mukaan. Yhteyshenkilö on kiinteistöpalvelun esimies Pauli Lipponen puh. 0400-750714. Hankkeen aikataulu ja pohjapiirustukset ovat tarjouspyynnön liitteenä. Pyydämme rakennesuunnittelutarjoustanne Matkailu-, Ravitsemis- ja Talousalan sekä Elintarvikealan opetustilojen peruskorjauksesta. Suunnittelualueeseen kuuluu Pohjolankatu 12 A-osan 1. kerroksessa sijaitsevat opetuskeittiöt 1-4, leipomo ja kahvila Tuurimokka (n. 1000 m²) sekä kellarikerroksen varasto ja sosiaalitilat (n. 300 m²). Peruskorjauksessa on kiinnitettävä huomiota sisäilman laatuun. Ulkoseinien tiiviyteen ja alapohjan tiiveyteen on kiinnitettävä erityistä huomiota. Kantavat rakenteet rajoittavat tilojen layout-suunnitelman tekoa, koska niitä ei voitane poistaa. LVISA-tekniikka uusitaan kaikilta osin. IV-koneelle rakennetaan uusi konehuone osaston katolle. Sisäpihan puolelle suunnitellaan uudisrakennuksena yhdyskäytävä. Kahvila Tuurimokka siirretään nykyisen leipomon kohtaan. Suunnittelija velvoitetaan tutustumaan kohteeseen ennen tarjouksen antamista. Näyttöpäivä on pe 10.2.2017 klo 14.00, paikka Pohjolankatu 12 pääaula, tai sopimuksen mukaan. Yhteyshenkilö on kiinteistöpalvelun esimies Pauli Lipponen puh. 0400-750714. Hankkeen aikataulu ja pohjapiirustukset ovat tarjouspyynnön liitteenä.

Technical Building and property managers classrooms, the total contract

Etelä-Karjalan koulutuskuntayhtymä | Published February 6, 2017  -  Deadline February 21, 2017
cpvs

We ask for a quotation of Lake Saimaa in Lappeenranta College Sampo building technology and building managers teaching facilities Pohjolankatu construction work 10 property in the former canteen / kitchen. As a form of contract is a turnkey contract, which includes construction, plumbing and electrical work, as well as the main contractor obligations. The contract period is 20.3. - 08.09.2017. The contractor is obliged to explore the subject before submitting a tender. The contact person is a real estate service manager Pauli Lipponen, tel 0400 750 714. The contract unit price plans and the list of forms in the project are the collection in electronic format, of which provider they become available by requesting e-mail:. Secretary Annika Huuhko / annika.huuhko@edusampo.fi. The provider can request a hard copy at their own expense. We ask for a quotation of Lake Saimaa in Lappeenranta College Sampo building technology and building managers teaching facilities Pohjolankatu construction work 10 property in the former canteen / kitchen. As a form of contract is a turnkey contract, which includes construction, plumbing and electrical work, as well as the main contractor obligations. The contract period is 20.3. - 08.09.2017. The contractor is obliged to explore the subject before submitting a tender. The contact person is a real estate service manager Pauli Lipponen, tel 0400 750 714. The contract unit price plans and the list of forms in the project are the collection in electronic format, of which provider they become available by requesting e-mail:. Secretary Annika Huuhko / annika.huuhko@edusampo.fi. The provider can request a hard copy at their own expense.

Saimaa Canal Juustila, Särkijärvi and pallet locks operating and the engine room building renovation

Liikennevirasto | Published February 13, 2017  -  Deadline March 23, 2017
cpvs

The Saimaa Canal leased area, which is leased to the Russian Federation to Finland, in the operation of locks and renovation of buildings in the engine room. Buildings 3 pieces / shut-off are located Juustila, Roach Lake and Pallissa. In addition, Juustila is a back-up power construction. Renovation on roofs, facades and windows, as well as to some extent the inner work. The contract covers rakennusteknlliset and plumbing work. The Saimaa Canal leased area, which is leased to the Russian Federation to Finland, in the operation of locks and renovation of buildings in the engine room. Buildings 3 pieces / shut-off are located Juustila, Roach Lake and Pallissa. In addition, Juustila is a back-up power construction. Renovation on roofs, facades and windows, as well as to some extent the inner work. The contract covers rakennusteknlliset and plumbing work.

Lappeenranta Housing Services Ltd / Orion Street 5 Renovation

Lappeenrannan Asuntopalvelu Oy | Published February 3, 2017  -  Deadline March 2, 2017
cpvs

The project consists of Lappeenranta Housing Services Ltd's single five-story two-step residential apartment building renovation aluetöineen Lappeenranta Skinnarila district, at Orion Street 5. In addition, the house has a basement above ground, which is also located two flats. The property has 42 residential units with a total living area of ​​1878 m2. The basement floor is irtainvarastot, VSS mode, saunas pesutiloineen, laundry room, drying room, storage rooms and technical rooms. The estimated construction start date in May 2017 and the length of the period is 1 year. Urakkatarjoukset are invited to the following: - works, - HVAC works, - electrical contract. The building contractor is the main contractor of the project (project supervisor). HEVAC and electricity contracts are subject to the page contracts. The developer's contract with the contractor may subcontract parts of the contract subcontracted remains, first accepted as eligible sub-contractor construction contractor. The developer will not accept this further subcontract concatenation. The project consists of Lappeenranta Housing Services Ltd's single five-story two-step residential apartment building renovation aluetöineen Lappeenranta Skinnarila district, at Orion Street 5. In addition, the house has a basement above ground, which is also located two flats. The property has 42 residential units with a total living area of ​​1878 m2. The basement floor is irtainvarastot, VSS mode, saunas pesutiloineen, laundry room, drying room, storage rooms and technical rooms. The estimated construction start date in May 2017 and the length of the period is 1 year. Urakkatarjoukset are invited to the following: - works, - HVAC works, - electrical contract. The building contractor is the main contractor of the project (project supervisor). HEVAC and electricity contracts are subject to the page contracts. The developer's contract with the contractor may subcontract parts of the contract subcontracted remains, first accepted as eligible sub-contractor construction contractor. The developer will not accept this further subcontract concatenation.

Lappeenranta Housing Services Ltd / Orion Street 5 Renovation

Lappeenrannan Asuntopalvelu Oy | Published February 6, 2017
cpvs

The project consists of Lappeenranta Housing Services Ltd's single five-story two-step residential apartment building renovation aluetöineen Lappeenranta Skinnarila district, at Orion Street 5. In addition, the house has a basement above ground, which is also located two flats. The property has 42 residential units with a total living area of ​​1878 m2. The basement floor is irtainvarastot, VSS mode, saunas pesutiloineen, laundry room, drying room, storage rooms and technical rooms. The estimated construction start date in May 2017 and the length of the period is 1 year. Urakkatarjoukset are invited to the following: - works, - HVAC works, - electrical contract. The building contractor is the main contractor of the project (project supervisor). HEVAC and electricity contracts are subject to the page contracts. The developer's contract with the contractor may subcontract parts of the contract subcontracted remains, first accepted as eligible sub-contractor construction contractor. The developer will not accept this further subcontract concatenation. The project consists of Lappeenranta Housing Services Ltd's single five-story two-step residential apartment building renovation aluetöineen Lappeenranta Skinnarila district, at Orion Street 5. In addition, the house has a basement above ground, which is also located two flats. The property has 42 residential units with a total living area of ​​1878 m2. The basement floor is irtainvarastot, VSS mode, saunas pesutiloineen, laundry room, drying room, storage rooms and technical rooms. The estimated construction start date in May 2017 and the length of the period is 1 year. Urakkatarjoukset are invited to the following: - works, - HVAC works, - electrical contract. The building contractor is the main contractor of the project (project supervisor). HEVAC and electricity contracts are subject to the page contracts. The developer's contract with the contractor may subcontract parts of the contract subcontracted remains, first accepted as eligible sub-contractor construction contractor. The developer will not accept this further subcontract concatenation.
  • 1